Measure R Project Tracker

Project Name & Description Funding Status

Agoura Road Widening

Widen Agoura Road and Canwood St.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$5.5M Ongoing

Central Ave Improvements/Broadway to SR-134EB Offramp

Add an additional lane to the SR-134 Eastbound off-ramp at Central Av to alleviate traffic back up on Central Av off-ramp, SR-134 eastbound auxiliary lane, and freeway main line.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$3.5M Ongoing

East San Fernando Valley Transit Corridor Project

Transit improvements on four potential East San Fernando Valley corridors, including Van Nuys, Sepulveda, Reseda and Lankershim between Ventura Bl. and south of the 118 freeway.

Region(s): City of Los Angeles, San Fernando Valley
City: Los Angeles
More: Project Website
$68.5 million MIS/EIR/EIS/EA Draft Phase

Grandview At-Grade Rail Crossing Improvements

Safety improvements to the existing at-grade rail crossing at San Fernando Road and Grandview Av. The improvements include the installation of a state-of-the-art advance pre-emption system, installation of quad gates, and adjustment of the roadway approach grade at the railroad track.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$2.2M Ongoing

High Desert Corridor Project (environmental)***

Provides the initial study of the High Desert Corridor, linking the Antelope Valley to Apple Valley.

Region(s): North Los Angeles County
$33.0M MIS/EIR/EIS/EA Draft Phase

I-405, I-110, I-105, SR-91 Ramp/Interchange Improvements: South Bay

Constructs improvements in the South Bay to reduce delays on the freeways. Examples include auxiliary lanes and ramp reconfigurations.

Region(s): City of Los Angeles
$906M Construction

I-5 North Capacity Enhancements: SR-14 to Kern County Line (Truck Lanes)***

Adds a carpool lane and a dedicated truck lane in both directions on the I-5 freeway north of SR-14 in the Santa Clarita Valley.

Region(s): North Los Angeles County
$410M Ongoing Seg. 1 - Construction, Seg. 2 - Design, Seg. 3 - Initial Planning

I-5 Widening and HOV: I-605 to Orange County Line

Constructs one carpool lane and one mixed-low lane in each direction extending 6.4 miles through Cerritos, La Mirada, Santa Fe Springs and Norwalk. Includes interchange reconstruction and arterial modifications.

Region(s): Gateway Cities
$$265 million Construction

I-5/Carmenita Road Interchange

Removes existing two-lane structure and constructs a new eight-lane interchange with carpool lane on-ramps. Project is located in Santa Fe Springs and Norwalk, and could enable widening of I-5 in the area.

Region(s): Gateway Cities
$138M Construction

I-5/SR-14 HOV Direct Connector

Provides direct link for carpoolers between I-5 and SR-14 freeways, which eliminates need to exit carpool lanes when switching freeways.

Region(s): North Los Angeles County
$90.8M Construction

I-605 Corridor "Hot Spot" Interchanges

Improvements to interchanges along the I-605 corridor, such as at the SR-60, I-5, SR-91 and I-405 interchanges. Examples of improvements include roadway widening, ramp expansion and added signage within the interchange.

Region(s): Gateway Cities
$590M Alternatives Analysis Study

I-710 Corridor Project EIS/EIR***

Upgrades the freeway and improves truck and traffic flows between the Ports of Los Angeles and Long Beach and the SR-60 freeway. Also to be considered are upgrades to the I-710 freeway between Pacific Coast Highway and downtown Long Beach.

Region(s): Gateway Cities
$590M MIS/EIR/EIS/EA Draft Phase

Las Virgenes Scenic Corridor Widening

Widen the Las Virgenes Road Scenic Corridor in order to improve traffic flow and safety.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$4M Completed

Lost Hills Overpass and Interchange

Construct a new interchange and overcrossing to replace the current Lost Hills Road/US 101 interchange.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$9.5M Ongoing

Mulholland Highway Hillside Removal

Widen intersections, approaches to intersections and provide dedicated left turn and bypass lanes along Mulholland Highway.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$2M Ongoing

Mulholland Highway Scenic Corridor Completion

Widen intersection, approaches to intersections and provide dedicated left turn and bypass lanes along Mulholland Highway.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$7.25M Ongoing

Palo Comado Interchange

Complete interchange improvements along Palo Comado Canyon Road, the intersection of Driver Av and Chesebro Road.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$22.85M Ongoing

Parkway Calabasas/US 101 Southbound Offramp

Re-design the Parkway Calabasas/US 101 southbound interchange for greater traffic flow and safety.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$0.35M Ongoing

Roundabout

Construct a 2-lane road roundabout at the intersection of Kanan Road and Agoura Road.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$5.25M Ongoing

Sonora Av At-Grade Rail Crossing Safety Upgrade

Safety improvements to the existing at-grade rail crossing at Sonora Av. The improvements include the installation of a state-of-the-art advance pre-emption system, installation of quad gates, and adjustment of the roadway approach grade at the railroad track.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$2,700 Ongoing

SR-134/Pacific Av Westbound Offramp Widening

Add an additional lane to the SR-134 Westbound off-ramp at Pacific Av to alleviate traffic back up on the Pacific Av off-ramp and freeway main line.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$0.3M Ongoing

SR-138 Capacity Enhancements

Widens SR-138 by adding new lanes in each direction to the San Bernardino County line.

Region(s): North Los Angeles County
$200M Alternatives Analysis Study

SR-710 Project Gap Closure***

Improvements to connection between SR-710 and I-210 freeways.

Region(s): San Gabriel Valley
$$780 million MIS/EIR/EIS/EA Draft Phase

Traffic Signal Sync Brand/Colorado-San Fernando/Glendale-Verdugo

Region(s): Arroyo Verdugo
City: Glendale
$0 Ongoing

US 101/Lindero Canyon Road Interchange Improvements

Widen Lindero Canyon Road to add additional travel lanes and widen and extend US 101/Lindero Canyon Road Interchange's ramp.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Westlake Village
$9.5M Ongoing

Verdugo Road Signal Upgrade

Region(s): Arroyo Verdugo
City: Glendale
$0 Completed



Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2


  • *Specific mode and routing will be subject to approved plans developed in cooperation with local jurisdictions and affected communities.
  • **Specific improvements are expected to be developed by local jurisdictions.
  • ***Partial funding by public/private partnerships is assumed to be part of the project plan.

1Projects listed are for reference only and do not indicate priority order. Project definition depends on final environmental process.
2Measure R does not fully fund all projects.

For viewing MS Word, Powerpoint, and Excel documents - Download Adobe Acrobat Reader (free) or use Google Docs Reader (online)