Measure R Project Tracker


3 - Traffic Reduction
Project Name & Description Funding Status

Agoura Road Widening

Widen Agoura Road and Canwood St.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$5.5M Final Design

Citywide Signal Sync/Traffic Operations Center

Construct and implement Citywide Signal Synchronization and Traffic Operations Center.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$2M Final Design

Fairmont Av Grade Separation at San Fernando Road

Provides grade separation of Fairmont Av over San Fernando Road and includes construction of a Park-and-Ride facility.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$3M Construction

High Desert Corridor Project (environmental)***

Provides the initial study of the High Desert Corridor, linking the Antelope Valley to Apple Valley.

Region(s): North Los Angeles County
$33.0M MIS/EIR/EIS/EA Draft Phase

I-405, I-110, I-105, SR-91 Ramp/Interchange Improvements: South Bay

Constructs improvements in the South Bay to reduce delays on the freeways. Examples include auxiliary lanes and ramp reconfigurations.

Region(s): City of Los Angeles
$906M Construction

I-5 Corridor Arterial Signal Improvements

Provide traffic signal upgrades, signal controller upgrades, and variable timing plans to intersections on arterial streets within 1 mile of the I-5 corridor.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Burbank
$TBD Ongoing

I-5 HOV from SR-134 to SR-170

Constructs one carpool lane in each direction along the I-5 freeway between SR-134/SR-170, including access improvement for Empire Av.

Region(s): Arroyo Verdugo, City of Los Angeles
$272M Construction

I-5 North Capacity Enhancements: SR-14 to Kern County Line (Truck Lanes)***

Adds a carpool lane and a dedicated truck lane in both directions on the I-5 freeway north of SR-14 in the Santa Clarita Valley.

Region(s): North Los Angeles County
$410M Ongoing Seg. 1 - Construction, Seg. 2 - Design, Seg. 3 - Initial Planning

I-5 Widening and HOV: I-605 to Orange County Line

Constructs one carpool lane and one mixed-low lane in each direction extending 6.4 miles through Cerritos, La Mirada, Santa Fe Springs and Norwalk. Includes interchange reconstruction and arterial modifications.

Region(s): Gateway Cities
$265M Final Design

I-5/Carmenita Road Interchange

Removes existing two-lane structure and constructs a new eight-lane interchange with carpool lane on-ramps. Project is located in Santa Fe Springs and Norwalk, and could enable widening of I-5 in the area.

Region(s): Gateway Cities
$138M Construction

I-5/Olive Av - Verdugo Av Northbound Ramps Auxiliary Lane

Reconfigure the existing Northbound Olive Av ramp system with I-5 to provide a continuous auxiliary lane between Alameda Av and Burbank Bl, by reconfiguring Bonnywood Place and the existing ramps at Angeleno and Orange Grove.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Burbank
$TBD Ongoing

I-5/SR-14 HOV Direct Connector

Provides direct link for carpoolers between I-5 and SR-14 freeways, which eliminates need to exit carpool lanes when switching freeways.

Region(s): North Los Angeles County
$90.8M Construction

I-605 Corridor "Hot Spot" Interchanges

Improvements to interchanges along the I-605 corridor, such as at the SR-60, I-5, SR-91 and I-405 interchanges. Examples of improvements include roadway widening, ramp expansion and added signage within the interchange.

Region(s): Gateway Cities
$590M Alternative Analysis Study

I-710 Corridor Project EIS/EIR***

Upgrades the freeway and improves truck and traffic flows between the Ports of Los Angeles and Long Beach and the SR-60 freeway. Also to be considered are upgrades to the I-710 freeway between Pacific Coast Highway and downtown Long Beach.

Region(s): Gateway Cities
$590M MIS/EIR/EIS/EA Draft Phase

Las Virgenes Scenic Corridor Widening

Widen the Las Virgenes Road Scenic Corridor in order to improve traffic flow and safety.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$4M Completed

Lost Hills Overpass and Interchange

Construct a new interchange and overcrossing to replace the current Lost Hills Road/US 101 interchange.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$9.5M Final Design

Monterey Road Extension to Glenoaks Bl over Verdugo Wash

Construction of a bridge to connect Monterey Road to Glenoaks Bl. This project would create a continuous frontage road to connect the existing SR-134/Central/Brand Bl split-diamond interchange to the SR-134/Glendale Av interchange.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$TBD Ongoing

Mulholland Highway Hillside Removal

Widen intersections, approaches to intersections and provide dedicated left turn and bypass lanes along Mulholland Highway.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$2M Ongoing

Mulholland Highway Scenic Corridor Completion

Widen intersection, approaches to intersections and provide dedicated left turn and bypass lanes along Mulholland Highway.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$7.25M Final Design

Palo Comado Interchange

Complete interchange improvements along Palo Comado Canyon Road, the intersection of Driver Av and Chesebro Road.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$22.85M Initial Planning

Parkway Calabasas/US 101 Soutbound Offramp

Re-design the Parkway Calabasas/US 101 southbound interchange for greater traffic flow and safety.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Calabasas
$0.35M Completed

Roundabout

Construct a 2-lane road roundabout at the intersection of Kanan Road and Agoura Road.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Agoura Hills
$5.25M Final Design

San Fernando Bl/Burbank Bl Intersection Improvement

Widen San Fernando/Burbank intersection to improve intersection operations.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Burbank
$8M Initial Planning

San Fernando/Grandview At-Grade Rail Crossing Improvements

Safety improvements to the existing at-grade rail crossing at San Fernando Road and Grandview Av. The improvements include the installation of a state-of-the-art advance pre-emption system, installation of quad gates, and adjustment of the roadway approach grade at the railroad track.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$2.2M Construction

Sonora Av At-Grade Rail Crossing Safety Upgrade

Safety improvements to the existing at-grade rail crossing at Sonora Av. The improvements include the installation of a state-of-the-art advance pre-emption system, installation of quad gates, and adjustment of the roadway approach grade at the railroad track.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$2,700 Construction

SR-134 Corridor Arterial Signal Improvements

Provide traffic signal upgrades, signal controller upgrades, and variable timing plans to intersections on arterial streets within 1 mile of the SR-134 corridor.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Burbank
$TBD Ongoing

SR-134 Ramps/Harvey Dr/Wilson Av Signal & Street Widening

Upgrading the traffic signal at the SR-134 Eastbound and Westbound on and off ramps with Harvey Dr, upgrading the traffic signal at this intersection, and widening the Harvey Dr and Wilson Av intersection.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$1.1M Ongoing

SR-134/Central Av Eastbound Offramp Widening

Add an additional lane to the SR-134 Eastbound off-ramp at Central Av to alleviate traffic back up on Central Av off-ramp, SR-134 eastbound auxiliary lane, and freeway main line.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$3.5M Ongoing

SR-134/Glendale Av Interchange Modification

Upgrading the traffic signal at the SR-134 Eastbound on and off ramps and Glendale Av, upgrading the traffic signal at Glendale Av and Monterey Road and adding a left turn lane, and installation of interconnect cable for the westbound on-ramp and westbound off-ramp.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$3M Ongoing

SR-134/Pacific Av Eastbound Offramp Widening

Add an additional lane to the SR-134 Eastbound off-ramp at Pacific Av to alleviate traffic back up on the Pacific Av off-ramp and freeway main line.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$0.3M Ongoing

SR-134/Pacific Av Westbound Offramp Widening

Add an additional lane to the SR-134 Westbound off-ramp at Pacific Av to alleviate traffic back up on the Pacific Av off-ramp and freeway main line.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$0.3M Ongoing

SR-138 Capacity Enhancements

Widens SR-138 by adding new lanes in each direction to the San Bernardino County line.

Region(s): North Los Angeles County
$200M Alternative Analysis Study

SR-2/Holly Dr Interchange Ramp Signalization

Installation of a traffic signal at the intersection of Holly Dr and the SR-2 Freeway on and off ramps.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$.5M Ongoing

SR-2/Mountain Av Interchange Ramp Widening

Widening the Northbound and Southbound off-ramps at the Mountain Av interchange with SR-2.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$.6M Ongoing

SR-2/SR-134 Interchange Fwy-to-Fwy Ramp Meters

Installation of Ramp Metering on the SR-2 Southbound to SR-134 Westbound connector ramp. Also includes the installation of Ramp metering on the SR-134 to SR-2 Northbound connector ramp.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$3M Ongoing

SR-2/Verdugo Bl Intersection Signalization

Installation of a traffic signal at the SR-2 / Verdugo Bl on ramp.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Glendale
$700 Ongoing

SR-710 Project Gap Closure***

Improvements to connection between SR-710 and I-210 freeways.

Region(s): San Gabriel Valley
$780M Initial Planning

US 101/Lindero Canyon Road Interchange Improvements

Widen Lindero Canyon Road to add additional travel lanes and widen and extend US 101/Lindero Canyon Road Interchange's ramp.

Part of the Highway Operational Improvements in Las Virgenes and Malibu Subregion

Region(s): Las Virgenes/Malibu
City: Westlake Village
$9.5M Construction

Widen Magnolia Bl/I-5 Bridge for center-turn lane, standard lanes, shoulders

Widen Magnolia Bridge over I-5 to provide standard-width travel lanes, a continuous two-way left turn lane to serve both sides of the bridge, five-foot shoulders, and widened sidewalks.

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Burbank
$2.3M Ongoing

Widen Olive Av/I-5 Bridge for center-turn lane, standard width lanes, shoulders

Widen Olive Av Bridge over I-5 to provide standard-width travel lanes, a continuous two-way left turn lane to serve both sides of the bridge, five-foot shoulders, and widened sidewalks. 

Part of the Highway Operational Improvements in Arroyo Verdugo Subregion

Region(s): Arroyo Verdugo
City: Burbank
$TBD Ongoing



Here's how it works: The Measure R Projects Tracker lists the various projects in alphabetical order by category with a brief description of the project.1 You can view the status for many of the projects with estimated Measure R funding allocations as projected over 30 years.2


  • *Specific mode and routing will be subject to approved plans developed in cooperation with local jurisdictions and affected communities.
  • **Specific improvements are expected to be developed by local jurisdictions.
  • ***Partial funding by public/private partnerships is assumed to be part of the project plan.

1Projects listed are for reference only and do not indicate priority order. Project definition depends on final environmental process.
2Measure R does not fully fund all projects.