Skip to Content
Search

Gallery: Purple Line Extension Construction

Installing tail tracks to support tunnel boring machines (June 2018) Assembling cradle and thrust frame to support tunnel boring machines (June 2018) Unloading tunnel boring machine base cradle support inside Wilshire/La Brea station (June 2018) Installing architectural finishing for station walls inside Wilshire/La Brea (May 2018) Tunnel boring machine component waiting assembly inside Wilshire/La Brea staging yard (May 2018) Placing rubber conveyor belt to support tunneling excavation inside Wilshire/La Brea staging yard (May 2018) Wilshire/La Cienega Station excavation (May 2018) Installing conveyor system inside Wilshire/La Brea station to support tunneling excavation (April 2018) Installing bridge and waterproofing system inside Wilshire/La Brea station (April 2018) Wilshire/Western decking (Apr 2018) Wilshire/Western decking (April 2018) Wilshire/Western decking (April 2018) Wilshire/La Cienega jet grouting (Nov 2017) Wilshire/La Cienega jet grouting (Nov 2017) Wilshire/La Cienega jet grouting (Nov 2017) Wilshire/La Brea station excavation (Aug 2017) Wilshire/La Brea station excavation (Aug 2017) Wilshire/La Brea station excavation (Aug 2017) Wilshire/Fairfax decking (Feb 2017) Wilshire/Fairfax decking (Feb 2017) 2 Wilshire/Fairfax decking (Feb 2017) 3 Wilshire/Fairfax decking (Feb 2017) Excavating Wilshire/Western shaft (May 2018) Excavation for Wilshire/Fairfax station (June 2018)
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero