Final EIS/EIR
- Cover/Title Page/Table of Contents/Acronyms/Glossary
- Executive Summary
- Chapter 1 Purpose and Need
- Chapter 2 Alternatives Considered
- Chapter 3 Transportation
- Chapter 4 Environmental Analysis, Consequences, and Mitigation
- Chapter 5 Section 4(f) Evaluation
- Chapter 6 Cost and Financial Analysis
- Chapter 7 Comparative Benefits and Costs
- Chapter 8 Coordination and Consultation
- References/List of Preparers/List of Recipients
Appendices
- Appendix A - Plan and Profile, and Typical Section Drawings
- Appendix B – Station Plan Report
- Appendix C - Acquisitions
- Appendix D - Memorandum of Agreement and Section 106 Correspondence
- Appendix E - Construction Methods
- Appendix F - Notice of Intent/Notice of Preparation/Notices of Availability/Notice of Completion
- Appendix G - Memorandum of Understanding for Paleontological Resources
-
Appendix H
- Response to Comments
- 1.0 Preamble to Appendix H
- 2.1 Federal Agencies
- 2.2 State Agencies
- 2.3 Local Agencies
- 3.0 Groups
- 4.0 Government Officials
- 5.1 LACMA Public Hearing
- 5.2 Westwood Public Hearing
- 5.3 West Hollywood Public Hearing
- 5.4 Beverly Hills Public Hearing
- 5.5 Santa Monica Public Hearing
- 6.1 Individuals (A-F)
- 6.2 Individuals (G-M)
- 6.3 Individuals (N-T)
- 6.4 Individuals (U-Z)
- Appendix I - Mitigation Monitoring and Reporting Plan
- Appendix J - Environmental Justice Reports
-
Appendix K
- Section 4(f) and Section 106 Reports
- Cultural Resources Technical Report
- Historic Property Survey Report
- Archaeological Resources Supplemental Survey Technical Report
- Historic Properties Supplemental Survey Technical Report
- Section 4 (f) Evaluation Technical Report
-
Appendix L
- Geotechnical Reports
- Geotechnical and Hazardous Materials Technical Report
- Addendum to the Geotechnical and Hazardous Materials Technical Report
- Century City Area Fault Investigation Report – Volume 1
- Century City Area Fault Investigation Report – Volume 2
- Century City Area Tunneling Safety Report
-
Geotechnical and Environmental Report
-
Preliminary Geotechnical and Environmental Report Volume 1
- Part 1 | Part 2
- Plates 1 | Plates 2-0 | Plates 3-1 | Plates 3-2 | Plates 1-00 to 1-28 Part 1 | Plates 1-00 to 1-28 Part 2 | Plates 1-00 to 1-28 Part 3 | Plates 1-00 to 1-28 Part 4 | Plates 1-00 to 1-28 Part 5 | Plates 1-00 to 1-28 Part 6 | Plates 2-1 to 2-7 Part 1 | Plates 2-1 to 2-7 Part 2 | Plates 2-1 to 2-7 Part 3 | Plates 2-1 to 2-7 Part 4 | Plates 2-1 to 2-7 Part 5 | Plates 2-1 to 2-7 Part 6 | Plates 2-1 to 2-7 Part 7
- Preliminary Geotechnical and Environmental Report Volume 2
-
Preliminary Geotechnical and Environmental Report Volume 3
-
Part 1
|
Part 2
- Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36
-
Part 1
|
Part 2
-
Preliminary Geotechnical and Environmental Report Volume 1
Technical Reports, Addenda and Memorandums Prepared for and/or Referenced in Final EIS/EIR
- Accelerated Financial Plan
- Acquisitions and Displacement Supplemental Report
- Addendum to the Community and Neighborhood Technical Report
- Addendum to the Hydrology and Water Quality Technical Report
- Addendum to the Land Use and Development Opportunities Technical Report
- Addendum to the Safety and Security Hazards and Threat Assessment Technical Report
- Addendum to the Visual and Aesthetic Impacts Technical Report
- Addendum to Transportation Impacts Report
- Air Quality Memorandum
- Alternative Financial Plan
- APTA Final Peer Review Panel Report
- Building and Adjacent Structure Protection Report
- Century City Station Location Report
- Century City Station Options Updated Jobs and Population Inventory Memorandum
- Century City TOD and Walk Access Study
- Climate Change Memorandum
- Community and Neighborhood Impacts Report
- Comparative Benefits and Costs Analysis
- Construction Traffic Analysis Report
- Climate Change Technical Report
- Cost and Financial Analysis
- Cumulative Impact Assessment Technical Report
- Economic and Fiscal Impacts Analysis and Mitigation Memorandum
- Ecosystems-Biological Resources Technical Report
- Energy Memorandum
- Energy Technical Report
- Existing Plus Project Traffic Impact Analysis Report
-
Financial Plan Appendices to both the Accelerated Financial Plan and Alternative Financial Plan
- Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9 | Part 10 | Part 11 | Part 12 | Part 13 | Part 14 | Part 15 | Part 16 | Part 17 | Part 18 | Part 19 | Part 20 | Part 21 | Part 22 | Part 23 | Part 24 | Part 25 | Part 26 | Part 27 | Part 28 | Part 29 | Part 30 | Part 31 | Part 32 | Part 33 | Part 34 | Part 35 | Part 36 | Part 37 | Part 38 | Part 39 | Part 40 | Part 41 | Part 42 | Part 43 | Part 44 | Part 45 | Part 46 | Part 47 | Part 48 | Part 49 | Part 50 | Part 51 | Part 52 | Part 53 | Part 54 | Part 55 | Part 56 | Part 57
- Growth-Inducing Impacts Technical Report
- Hydrology and Water Quality Technical Report
- Land Use and Development Opportunities Report
- Noise and Vibration Study
- Noise and Vibration Technical Report
- Operations and Maintenance Cost Report
- Parking Impacts and Policy Plan
- Parklands and Other Community Facilities Supplemental Technical Report
- Parklands and Other Community Facilities Technical Report
- Public Participation and Community Outreach Report
- Real Estate and Acquisitions Technical Report
- Safety and Security Hazards and Threat Assessment Technical Report
- Smart Growth Evaluation Report
- Station Circulation Report
- Station Entrance Location Report and Recommendations
- Technical Report Summarizing the Results of the Forecasted Alternatives
- Traffic Impact Analysis Report
- Transit Impact Assessment Report
- Transportation Impacts Technical Report
- Updated Direct Ridership Forecasting Report
- Updated Off-Street Parking Analysis Memorandum
- Visual and Aesthetics Impacts Technical Report
- WMATA 2005 Development Related Ridership Survey - Final Report
- Wilshire/La Cienega Terminus (Phase 1) Traffic Impact Analysis Report
- Westwood/UCLA Station and the Westwood/VA Hospital Station Locations Report
- Wilshire/Rodeo Station Bank of America Portal Traffic Impact Analysis Report