Metro is currently in the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) phase of project development. During the Draft EIS/EIR process, Metro will assess existing conditions in the study area, further refine the project alternatives, assess their potential impacts, and identify possible mitigation measures. We will also consider the cost effectiveness of the alternatives as well as current and potential funding options for constructing the project. The Federal Transit Administration (FTA) and Metro will prepare a joint document that meets the requirements of both the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

One Build alternative is moving forward for further study. The Light Rail Alternative will evaluate extending the Metro Green Line from its current terminus at the Redondo Beach Station at Marine Avenue to the proposed Torrance Regional Transit Center (RTC). In addition, the Draft EIS/EIR will evaluate the No Build and Transportation Systems Management (TSM) alternatives.

At the conclusion of the Draft EIS/EIR process, a Locally Preferred Alternative (LPA) will be recommended to the Metro Board of Directors for consideration.

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero