Start Date Notice Brief More Info

04/17/2019

Purple Line Extension Community Meetings & Events
Area: Purple Line Extension

Purple Line Extension Transit Projects community meetings and events. 

More information about Purple Line Extension Community Meetings & Events in HTML format

04/12/2019

Intermittent closures of Wilshire Blvd. between Beverly Dr. and Crescent Dr.
Area: Wilshire/Beverly, Wilshire/Crescent

The design-build contractor will be installing a dewatering well system this summer to prepare the station footprint for tunneling on April 17-18*. 

More information about Intermittent closures of Wilshire Blvd. between Beverly Dr. and Crescent Dr. in HTML format

04/08/2019

Start of Utility Potholing in Beverly Hills
Area: Wilshire/Canon, Wilshire/Crescent

Utility potholing will begin mid-April to identify existing utilities below Wilshire Blvd. between Beverly Dr. and Crescent Dr. All work will be completed during non-peak hour traffic times. 

More information about Start of Utility Potholing in Beverly Hills in HTML format

03/29/2019

Advance Utility Work on Constellation Blvd.
Area: Constellation/Avenue of the Stars

Advanced Utility Relocation (AUR) for the LADWP and AT&T in Century City. 

More information about Advance Utility Work on Constellation Blvd. in HTML format

03/29/2019

Construction of Temporary Bus Layover on Santa Monica Blvd.
Area: Santa Monica/Avenue of the Stars, Santa Monica/Century Park East

The Purple Line Extension will resume bus layover work starting in April*. Intermittent lane closures will be implemented throughout construction.

More information about Construction of Temporary Bus Layover on Santa Monica Blvd. in HTML format

03/28/2019

Constellation Blvd. Closure at Century Park East, Beginning September 21
Area: Constellation/Century Park East

Constellation Blvd. at Century Park East will be closed to construct a launch box for the Purple Line Extension tunnel boring machines digging the twin tunnels for the underground subway through Century City.

More information about Constellation Blvd. Closure at Century Park East, Beginning September 21 in HTML format

03/28/2019

Century City/Constellation Station Monthly Look-Ahead for April
Area: Century City

This monthly notification is an outline of construction activities for the month of April 2019. Additional notices detailing these activities will be sent by email through the Purple Line Extension, Section 2 database.

More information about Century City/Constellation Station Monthly Look-Ahead for April in HTML format

03/27/2019

Wilshire/Rodeo Station Monthly Look-Ahead for April
Area: Wilshire/Rodeo

This monthly notification is an outline of construction activities related to the Wilshire/Rodeo Station for the month of April 2019. 

More information about Wilshire/Rodeo Station Monthly Look-Ahead for April in HTML format

03/05/2019

Intermittent Closures for Wilshire/Reeves Staging Yard Construction
Area: Wilshire/Reeves

While the installation of the 20-foot sound wall around the perimeter of the Wilshire/Reeves staging yard located at 9340 Wilshire Blvd. continues, sidewalk and alley repair work have been rescheduled to Monday, March 11*.

More information about Intermittent Closures for Wilshire/Reeves Staging Yard Construction in HTML format

01/17/2019

Demolition of North Canon Properties and North Canon Dr. Closure
Area: Wilshire/Canon

Closure of N Canon Dr at Wilshire Bl starting April 2019 for approximately 24 months.

More information about Demolition of North Canon Properties and North Canon Dr. Closure in HTML format

01/10/2018

Reubicación de la parada de autobus - Wilshire/Rodeo
Segment: Wilshire
Area: Wilshire/Rodeo

A partir del domingo 14 de enero, las paradas de autobús de la línea 720 del autobús de tránsito rápido, la línea 20 local del Metro y la línea 786 de Antelope Valley (ATVA) se reubicarán.

More information about Reubicación de la parada de autobus - Wilshire/Rodeo in HTML format

01/10/2018

Bus Stop Relocations - Wilshire/Rodeo
Segment: Wilshire
Area: Wilshire/Rodeo

Beginning Sunday, January 14, bus stops for Metro Rapid Bus 720, Metro Local 20, and Antelope Valley (ATVA) 786 will be relocated. Bus stops are being relocated due to on-going construction activities on Wilshire Blvd.  

More information about Bus Stop Relocations - Wilshire/Rodeo in HTML format
Share this page on