Summary
AT&T contractors will perform utility relocation work as part of the Metro Orange Line (MOL) Bus Rapid Transit (BRT) Improvements Project. This work is part of the first phase of pre-construction utility relocation activities.
This work will occur intermittently at various locations along the Metro Orange Line Busway and Sepulveda Bl intersection.
Due to this activity:
- The right southbound lane on Sepulveda Bl will be closed intermittently between Erwin St and Oxnard St close to the Metro Orange Line Busway. The bike lane will be shared with vehicular lane.
- The right turn lane will be prohibited into the LA Fitness parking lot on Sepulveda Bl (refer to schedule)
- Metro Orange Line Bus lanes will be reduced to one lane intermittently
- Parking will be limited on Sepulveda Bl close to the Metro Orange Line Busway
Noteworthy
The pre-construction activities include potholing, trenching and pavement restoration that will have minimal noise and dust during daytime hours of operations.
Essentials
WHAT: Utility Relocation Work
WHEN: Monday, July 6 – Friday, August 14, 2020, (weekdays only), 9:00 a.m. – 3:30 p.m.
Monday, July 6 – Friday, July 10, 2020, 9:00 p.m. – 6:00 a.m. (night time work**)
WHERE: The schedule below reflects the work on the Metro Orange Line Busway and Sepulveda Bl intersection.
Date |
Intersections / Sepulveda Bl |
July 6 – 10 |
Costco Drive entrance to LA Fitness Parking Lot |
July 13 – 17 |
**Costco Drive entrance to LA Fitness Parking Lot |
July 20 – 24 |
* Metro Orange Line Busway |
July 27 – 31 |
* Metro Orange Line Busway |
August 3 – 7 |
Metro Orange Line Busway
|
August 10 – 14 |
* Metro Orange Line Busway |
What to Expect
The Metro Orange Line Sepulveda station will remain open with a visible safe pedestrian walkable path(s). Dates are subject to change. For the most updated information, please visit the project’s website.
* Sepulveda/Orange Line Bus stop 40246 will be impacted. Please look for posted signs for directions to bus stop.
** Nighttime work