Utility Investigation

Summary

Regional Connector Constructors (RCC) will conduct utility investigation at Hope St between 2nd St and GTK Way. Work is anticipated to begin as early as Wednesday, August 26, 2020, and continue for approximately two weeks. Anticipated work hours will be from 9 am to 3:30 pm Monday through Friday, and Saturday from 8 am to 6 pm. Activities will include set up for traffic, saw cutting, breaking up of concrete, excavating, utility investigation, placing backfill material, and paving.

 

Essentials

Sidewalk closure on the east side of Hope St between GTK Way and 2nd St will be in place during work hours.

Detour: use alternate route signage.

  • Eastbound: take 3rd St, left on Grand Av, left on 2nd St, back to Hope St.
  • Westbound: take 2nd St, right on Grand Av, right on 3rd St, back to Hope St.

 

What to Expect

Access to adjacent businesses will be maintained at all times.

 

Pedestrian access will be maintained outside of the work area during work hours.

 

Hope St:

Thru traffic will be maintained.

 

A lane reduction will be in place between GTK Way and 2nd St.