East Segment Construction Week Look-Ahead

Summary

Wilshire/Arden Jet Grouting 

Monday, October 24 – Friday, October 28 – 7am-5pm.

  • Eastbound Wilshire Blvd. reduced to one lane between Rossmore Ave. and Lucerne Ave. from 9am-3:30pm.

Wilshire/Sycamore, Wilshire/Orange
Geotechnical Instrumentation installation – Monday, October 24 – Friday, October 27 

  • Northbound Sycamore Ave. soft closure between 8th St. and Wilshire Ave.
  • Southbound Orange Dr. soft closure between 6th St. and Wilshire Blvd.
  • Westbound Wilshire Blvd. reduced to one lane between Mansfield Ave. and Sycamore Ave.

Wilshire/La Brea
Station excavation will continue from the La Brea yards and from the closure on the south side of Wilshire between La Brea Blvd. and Sycamore Ave. from 7am-11pm. Station excavation will continue through Fall 2017.  

Essentials

TIME:
• Wilshire/Arden Jet Grouting: 7am-5pm.
• Geotechnical Instrumentation: 9am-3:30pm
• Station Excavation: 7am-11pm

WHEN: Monday, October 24 – Friday, October 28

WHERE: Wilshire/Sycamore and Orange, Wilshire/Arden  

What to Expect

  •  All work has received necessary permits and approvals.
  • Access for pedestrians will be maintained outside of the construction zone.
  • Access for emergency responders will be maintained.
  • Construction may result in changes to bus routes and stop locations. Metro will post signs at affected stops to advise riders of alternative boarding locations. Real-time information will be available at metro.net/service/advisories or 323.gometro.

Noteworthy

Construction is a dynamic process and information is subject to change without notice.

24/7 Hotline: 213-922-6934