Update: Pile Installation

Update: Pile Installation Wilshire/Fairfax Intersection

Summary

The design-builder will continue pile installation on the north side of Wilshire Bl and Fairfax Av thru November 2016. This operation calls for piles to be drilled within the Wilshire/Fairfax intersection, and will require lane reductions on Fairfax Av, over several weekends from October 1st into November. There will also be intermittent street closures on Wilshire Bl.

Please see below for lane reductions and turn restrictions: 

This weekend, pile installation work will require that Fairfax Av. is reduced to one lane in each direction between 6th St and 8th St on Saturday, October 1st starting at 4am thru Monday, October 3rd at 6am.

Left turns restricted from Fairfax Ave to Wilshire Bl from both directions.

Eastbound Wilshire Bl.: left turns are restricted on to northbound Fairfax Av

Westbound 6th St.: First left turn pocket closed onto southbound Fairfax Av., second left turn pocket open.  

Essentials

TIME: 7am-11pm: Drilling and piling work hours. 
           11pm-7am: Support activities
           (concrete pours, secure plates, sound blanket and closure removal)           
           Lane reductions will begin on Sat., Oct 1st at 4am until Mon., Oct 3rd at 6am. 
WHERE: Wilshire/Fairfax 
WHAT: Pile installation, north side of the Wilshire/Fairfax intersection.

What to Expect

All work has received necessary permits and approvals. 

Access for pedestrians will be maintained outside of the construction zone. 

Access for emergency responders will be maintained. 

Construction may result in changes to bus routes and stop locations. Metro will post signs at affected stops to advise riders of alternative boarding locations. Real-time information will be available at metro.net/service/advisories or 323.gometro. 

Construction is a dynamic process and information is subject to change without notice. Work activity is subject to weather conditions.

Noteworthy

Metro northbound 217 and DASH Fairfax will post stop relocations and announce relocations and detours to riders.

Traffic officer support will be in place at the intersection.

24/7 Project Hotline: 213-922-6934

Construction is a dynamic process and information is subject to change without notice.