Summary

Wilshire/La Brea: The design builder will be closing Orange Dr. south of Wilshire Blvd. for an extended period of time beginning 7 am Wednesday, August 24 thru 6am Monday, August 29, to support decking preparation and jet grouting.

Wilshire/Fairfax: On Wednesday, August 24, in preparation for pile installation, the design builder will be conducting plate maintenance, removal and backfill in the Wilshire/Fairfax intersection. This requires the following lane closures:

  • Northbound Fairfax Ave. reduced to one lane between Wilshire Blvd. and 6th St.
  • Southbound Fairfax Ave. reduced to one lane between Orange St. and Wilshire Blvd.
  • Work hours are 8pm-11pm.

Geotechnical drilling is continuing in the Wilshire/Fairfax area through the week. This week, drilling will occur just west of Fairfax on the south side of Wilshire Blvd. sidewalk. Work hours 8am-4pm.

Essentials

TIME: Orange Dr closed south of Wilshire Blvd 7am Wednesday to 6am Monday.

  • Jet Grouting/Decking support work hours: 7am-11pm.
  • Fairfax Plate Maintenance: 8pm-11pm
  • Fairfax Geotechnical drilling: 8am-4pm

WHEN: Monday, August 22 – Monday, August 29

WHERE: Wilshire/ La Brea/ Wilshire/Fairfax WHAT: Pile preparation, geotechnical work, jet grouting, decking preparation

What to Expect

  • All work has received necessary permits and approvals.
  • Access for pedestrians will be maintained outside of the construction zone.
  • Access for emergency responders will be maintained.
  • Real-time information will be available at metro.net/service/advisories or 323.gometro.

Noteworthy

  • Construction is a dynamic process and information is subject to change without notice.
  • 24/7 Hotline – 213-922-6934