City of Beverly Hills - Wilshire/La Cienega: February thru March Look-Ahead

The Purple Line Extension, Section 1 construction is well underway at the future La Cienega Station. Since January 2017, the design-build contractor has removed a median at Wilshire/ San Vicente and installed concrete barriers (k-rail) on the south side of Wilshire Blvd. to support pre-piling activities. This monthly notification is an outline of construction activities anticipated to begin at the end of February thru March, 2017, pending City of Beverly Hills approval.  Additional notices detailing these activities will be sent by email thru the Purple Line Extension, Section 1 database.  To receive future notices by email, please sign up at purplelineext@metro.net

Summary

Pre-Piling Work, Potholing Across Gale Dr. and Hamilton Dr.  

  • Gale Dr. and Hamilton Dr. closed intermittently at Wilshire Blvd. on the south side, partial and full closures on weekdays from 7am-4pm.
  • Sidewalk closed intermittently on the south side of Wilshire Blvd. between Gale Dr. and Hamilton Dr. on weekdays from 7am-4pm and 8pm-7am; and weekends from 7am-4pm and 6pm-8am. These closures will be coordinated with events at The Saban Theatre.
  • Driveway access for US Renal Care maintained at Wilshire when possible, or flagger will assist traffic at driveway on Gale Dr. 

Tree Removal and Work Zone Banner Installation 

  • Westbound Wilshire Blvd. reduced to one lane between San Vicente Blvd. and La Cienega Blvd. on weekdays from 9pm-6am, and weekends from 8pm-6am.
  • Intermittent sidewalk closures on the north side of Wilshire Blvd. between San Vicente Blvd. and La Cienega Blvd. on weekdays from 7am-4pm and 8pm-7am; and weekends from 6pm-8am.
  • Eastbound Wilshire Blvd. reduced to one lane between La Cienega Blvd. and San Vicente Blvd. to support banner installation on weekdays from 9pm-6am; and weekends from 8pm-6am.
  • Sidewalks surrounding staging yards on La Cienega, Wilshire, and Gale to support banner installation on weekdays from 7am-4pm and 8pm-7am; and weekends from 7am-4pm and 6pm-8am.

Instrumentation and Geotechnical Work 

  • Installation of geotechnical instruments on the north side of the Wilshire Blvd. sidewalk between Tower Dr. and Hamilton Dr. on weekdays from 7am-4pm and 8pm-7am; and weekends from 6pm-8am.
  • Installation of instruments on the south side of the Wilshire Blvd. sidewalk between La Cienega Blvd. and Le Doux Rd. and on the east side of Tower Dr. south of Wilshire Blvd. on weekdays from 7am-4pm and 8pm-7am; and weekends 6pm-8am.
  • Installation of geotechnical instruments on La Cienega Blvd. Northbound and southbound La Cienega Blvd. lanes reduced intermittently between Gregory Way and Clifton Way. 

Piling and Support Activities  

  • Piling and support activities behind the closure on the south side of Wilshire Blvd. on weekdays and weekends from 7am-10pm.
  • Mobilization of drill rigs, generators, trucks on weekdays and weekends from 7am-10pm.
  • Directional closures on eastbound Wilshire Blvd. and northbound La Cienega Blvd. on weekends from 7am-10pm. Closure details and detours published prior to closure.
  • Pile support activities, such as deliveries and utility line installations. Wilshire Blvd. reduced to one lane intermittently between San Vicente Blvd. and La Cienega Blvd on weekdays from 8pm- 7am; and weekends from 6pm-8am.
  • Sidewalk closure on the south side of Wilshire Blvd. between Gale Dr. and Hamilton Dr. on weekdays from 7am-4pm and 8pm-7am; and weekends from 6pm-8am.

Note: Additional construction notices will be published with further details prior to start of major activities. 

Noteworthy

  • All work has received necessary permits and approvals.
  • Access for pedestrians will be maintained outside of the construction zone.
  • Access for emergency responders will be maintained.
  • Construction is a dynamic process and information is subject to change without notice.
  • 24/7 Hotline: 213.922.6934

Contact Us

Phone: 213.922.6934
Email | Facebook | Twitter

Safety First

  • Please review our construction safety tips
  • Access for emergency responders will be maintained
  • Construction is a dynamic process and information is subject to change without notice

Metro Access

Metro bus stops may be relocated or line could be impacted. Metro stops in the La Cienega area have been relocated to Wilshire/Stanley and Wilshire/La Jolla. For information changes to Metro service, please call 323.GoMetro or visit:

Metro Alerts 

Train service will be replaced by bus shuttles on two stretches of the Expo Line this month in order for maintenance and repair work to be performed on overhead wires, track and communications equipment. Click for more info. 

More About Metro

Eat Shop Play

  Support businesses located along the project alignment!  Eat, Shop, Play locally during construction.  For all the details, visit metro.net/eatshopplay

Business Interruption Fund

  Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small “mom and pop” businesses directly impacted by construction; learn more by visiting metro.net/bif.  To apply, visit Metro’s program administrator, Pacific Coast Regional Small Business Development Corporation (PCR)

Doing Business With Metro 

  Metro works with small businesses throughout Los Angeles County! Would you like to be one of our vendors? Visit business.metro.net for more details!
Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero