Project Wide Construction Week Look-Ahead 1/16 - 1/20

Summary

East Segment

Jet Grouting at Wilshire Blvd./Windsor Blvd., Geotechnical Instrumentation Work at Wilshire Blvd./Arden Blvd.

  • Wilshire Blvd. reduced intermittently to one lane in each direction between Crenshaw Blvd. and Rossmore Ave. during off-peak hours, 9am-3:30pm, Monday - Friday.
  • Note: Concrete barriers are currently installed on Wilshire Blvd. between Lucerne Blvd. and Rossmore Ave. and Crenshaw Blvd. and Plymouth Blvd. for jet grouting activities. Left turn restrictions and lane reductions will be in place until this operation is complete.  

Excavation and Utility Work at La Brea Ave. 

  • Orange Dr. closed intermittently at Wilshire Blvd. south of Wilshire Blvd., 7am-11pm, Monday-Friday.
  • Sycamore Ave. closed intermittently at Wilshire Blvd. south of Wilshire Blvd., 7am-11pm, Monday-Friday.

West Segment

Piling and Pile Preparation at Fairfax Ave.

  • Orange Grove Ave. closed intermittently south of Wilshire Blvd., 7am-11pm, Monday-Friday, with support activities as needed between 11pm-7am,
  • The sidewalk on the south side of Wilshire Blvd. will be closed intermittently just west of Fairfax Ave., 7am-11pm, Monday-Friday. Signed pedestrian detour will be installed and business access maintained.
  • The sidewalk on the west side of Fairfax Ave. will be closed intermittently between Wilshire Blvd. and Warner Ave., 7am-11pm, Monday-Friday.

Pot-holing on Fairfax Ave. to prepare for weekend piling, 9am thru 6am the following morning, Monday-Friday.

  • Northbound Fairfax Ave. will be reduced to two and one lanes intermittently between 8th St. and Wilshire Blvd.
  • Northbound Fairfax Ave. left turn pocket restriction at Wilshire Blvd.
  • Southbound Fairfax Ave. reduced to one lane intermittently between 6th St. and Wilshire Blvd.  

Soundwall Construction and Geotechnical Instrumentation Installation at Wilshire Blvd./Gale Dr. and Wilshire Blvd./ La Cienega Blvd. 

  • Pot holing, installation of steel piles above-ground, and setting of wooden sound-blanket lined panels inside the staging yards. Work hours are 7am-4pm. 
  • Westbound Wilshire Blvd reduced to two lanes between San Vicente Blvd. and La Cienega Blvd. to support instrumentation installation.  

In observance of Martin Luther King, Jr. there will be no work in Beverly Hills on Monday, January 16th. 

Noteworthy

  • All work has received necessary permits and approvals.
  • Access for pedestrians will be maintained outside of the construction zone.
  • Access for emergency responders will be maintained.
  • Construction is a dynamic process and information is subject to change without notice.
  • 24/7 Hotline: 213-922-6934

Contact Us

Phone: 213.922.6934
Email | Facebook | Twitter

Safety First

  • Please review our construction safety tips
  • Access for emergency responders will be maintained
  • Construction is a dynamic process and information is subject to change without notice

Metro Access

Our construction may have relocated your bus stop, or changed your route. For information changes to Metro service, please call 323.GoMetro or visit:

More About Metro

Eat Shop Play

  Support businesses located along the project alignment!  Eat, Shop, Play locally during construction.  For all the details, visit metro.net/eatshopplay

Business Interruption Fund

  Metro's Business Interruption Fund (BIF) provides financial assistance to qualifying small “mom and pop” businesses directly impacted by construction; learn more by visiting metro.net/bif.  To apply, visit Metro’s program administrator, Pacific Coast Regional Small Business Development Corporation (PCR)

Doing Business With Metro 

  Metro works with small businesses throughout Los Angeles County! Would you like to be one of our vendors? Visit business.metro.net for more details!
Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero