Skip to Content
Search

Excavation Activities on Flower St between 6th St and Wilshire Bl

Update

April 11, 2019: Additional work scheduled for Saturday, April 13, from 7 am to 3:30 pm. Additional work activities added and detours also updated.


Summary

Regional Connector Constructors (RCC) will continue excavation on Flower St between 6th and Wilshire.

Work is anticipated to continue on Saturday April 13, 2019, for one day. Anticipated work hours, weather permitting, are 7 am to 3:30 pm.

Essentials

Activities include: Lifting deck panels and use of excavator or vacuum truck from above to remove soil.

What to Expect

Traffic

  • Northbound I-110 Freeway off-ramp will be closed at 6th St, with traffic redirected to 3rd St and southbound Flower St.
  • Lane reductions will occur on Flower St, between 5th St and Wilshire Bl.
  • Lane reduction on 6th St, between Figueroa and Flower St.
  • Right turns from eastbound 6th St onto southbound Flower St will be restricted, with traffic directed to 4th St via Figueroa St.

Pedestrian and driveway access will be maintained at all times, with flaggers on-site to assist.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero