Utility Vault Installation Preparation

Summary

Regional Connector Constructors will prepare a section of asphalt for utility vault installation at the intersection of 7th St and Flower St.

Work is anticipated to take place Thursday, January 24, 2019, and last for one day. Work hours, weather permitting, at 7 am to 3:30 pm.

Essentials

Activities include traffic control set up, equipment mobilization, and saw cutting.

What to Expect

  • Southbound Flower St will be reduced to two through lanes with left turns onto 7th St maintained.
  • Pedestrian and driveway access will be maintained.