Utility vault installation at 7th/Flower St

Summary

Regional Connector Constructors will install a station utility vault at the intersection of 7th St and Flower St.

Work is anticipated to begin Friday, January 25, 2019, and continue for approximately three days. Anticipated work hours, weather permitting, are 7 pm, Friday night, to 11:30 pm, Sunday night.

Essentials

Activities include traffic control set up, equipment mobilization, saw cutting and grinding, asphalt removal, excavation, shoring, vault installation, backfilling, and paving.

What to Expect

  • Motorists are advised to pay special attention to traffic signage
  • Southbound Flower St will be reduced to two through lanes with left turns onto 7th St maintained.
  • Pedestrian and driveway access will be maintained.