Skip to Content
Search

Deck panel removal for excavation on west side of Flower St

Update

January 23, 2019: On Saturday, January 26, eastbound 6th St will be reduced to a single thru lane with turns onto southbound Flower St detoured to Hope St, Wilshire, and back onto Flower St.


Summary

Regional Connector Constructors will remove deck panels and excavate on the west side of Flower St, between 5th St and Wilshire Bl, including the intersection at 6th St/Flower St.

Work is anticipated to take place Saturday, January 19, 2019, and Saturday, January 26, 2019. Anticipated work hours, weather permitting, are 7 am to 5 pm.

Essentials

Activities include traffic control set-up, equipment mobilization, deck panel removal and replacement, and excavation.

What to Expect

  • Southbound Flower St will be reduced to one thru lane and one left turn lane at 6th street.
  • Eastbound 6th St will be reduced to one thru lane and one right turn lane at Flower St.
  • Pedestrian access, driveway access, and left turns onto eastbound 6th St will be maintained.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero