Skip to Content
Search

Deck Panel Removal and Replacement

Summary

Regional Connector Constructors will remove and replace deck panels on Flower St near the 6th St intersection.

Work is anticipated to begin Saturday, November 17, 2018 and last for one day only. Work hours, weather permitting, are 7 am to 3:30 pm.

Essentials

Activities include traffic control set up, equipment mobilization, deck panel removal, welding, and deck panel replacement.

Pedestrian access will be maintained at all times. There will be intermittent closures of the Paragon Parking and Standard Hotel Flower St driveway.

What to Expect

Lane reductions include:

  • East side of Flower St, between 5th St and the midblock crosswalk north of 6th St
  • East side of Flower St, between the midblock crosswalk and 6th St
  • West side of Flower St, between 5th St and Wilshire Bl

Lane reductions will not be in effect simultaneously.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero