Skip to Content
Search

Traffic Lane Black Stripe Removal

Summary

Regional Connector Constructors will remove a blacked traffic strip in the concrete asphalt on Flower St, between 4th St and 5th St.

Work is scheduled to begin Monday, October 29, 2018, and last one day only. Anticipated work hours, weather permitting, are 7 to 9 am.

Essentials

Activities include setting up traffic control, grinding, and equipment mobilization.

What to Expect

  • Access to pedestrian walkways and nearby businesses will be maintained outside of the work area.
  • There will be a single lane of traffic closed to thru-traffic on the east side of Flower St, between 4th St and the Westin Bonaventure Valet area.
  • Valet access will be maintained.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero