Skip to Content
Search

Paving on Flower St between 6th St and Wilshire Bl

Summary

Regional Connector Constructors (RCC) will be performing paving operations on Flower St between 6th St and Wilshire Bl.

Work is anticipated to take place Saturday, February 10, 2018. Anticipated work hours, weather permitting, are 10 am to 8 pm.

Essentials

Activities include: Saw cutting, grinding, and paving.

Access to all adjacent businesses will be maintained at all times. Pedestrian access will be maintained at all times.

What to Expect

  • Lane reduction on southbound Flower St between 5th St and Wilshire Bl.
  • Lane reductions on 6th St between Figueroa St and Flower St.
  • Right turns from 6th St to southbound Flower St will be restricted intermittently.

Detour
Use northbound Figueroa St to the 4th St bridge, right at Hope Pl, right on Grand Av, right on 5th St, left turn back to Flower St.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero