Sound Wall Installation on Flower St East side Pedestrian Sidewalk, south of 4th St

Update

Friday, September 22: The duration of this work has been extended to September 30.


Summary

Regional Connector Constructors will continue installation of a sound wall on the east side sidewalk on Flower St between 4th St and 5th St.

This will require a full closure of the east side sidewalk of Flower St between 4th St and the J2 South garage.

Work is anticipated to begin Saturday, September 16, 2017 and continue for approximately one week. Anticipated work hours will be: Saturday, 8 am to 6 pm, and Monday through Friday, 3:30 pm to midnight.

Essentials

Activities include: installation of steel beams, backfilling, installing sound wall panels, hanging noise blankets and painting.

Access to driveways will be maintained at all times.

What to Expect

No traffic closures needed.

Pedestrian Detours:

  • Pedestrians will be detoured to the west side sidewalk on Flower St between 4th St. and 5th St.
  • Crosswalks at the 5th/Flower intersection and the 4th/Flower intersection will be open at all times. 
  • J2 Garage and Citigroup use 4th St pedestrian bridge.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero