Maintenance in advance of tunneling, Central Ave and 2nd St

Summary

Regional Connect Constructors (RCC) and its subcontractor will perform maintenance of monitoring equipment in preparation for mining of the second tunnel.

Work will be performed along the western curb on Central Av, 1st St to 2nd St, and on 2nd St from Central Av to the midblock crosswalk, starting Monday, July 31, 2017 for three days. Work hours will be 9 am to 3:30 pm.

Essentials

Activities include saw cutting, drilling and pavement restoration.

Noise will be mitigated with sound blankets. Sidewalk access will be maintained at all times. Meter parking will be restricted within construction zone.

What to Expect

Monday, July 31 (daytime)

  • 9 am to 3:30 pm
  • 2nd St between San Pedro St. and Central Ave. traffic will be open for two way traffic
  • Work will be on North side of 2nd St, East of the midblock crosswalk

Monday, July 31 (nighttime)

  • 9 pm to 3:30 am
  • A northbound closure of Central Ave between 1st and 2nd St will be in place to remove deck panels and lower equipment
  • Use Alameda St as alternate route
  • All driveway access maintained via southbound Central Ave from 1st St

Tuesday–Thursday, August 1–3

  • 9 am to 3:30 pm 
  • 2nd St between San Pedro St and Central Ave and Central Ave between 1st to 2nd St traffic will be open for two way traffic.
  • Saw cutting along north and east curb lane.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero