Construction Fence on Pedestrian Sidewalk- Eastside Flower St. and 5th St

Summary

Regional Connector Constructors will reposition the chain-link fence on the eastside sidewalk at 5th St./Flower St. about three feet out from its current position. Five feet of sidewalk will be maintained at all times

Work is anticipated to begin Monday, April 3, 2017.

Anticipated work hours, weather permitting: Monday, 9 am to 3:30 pm

Essentials

Additional work room is necessary to perform excavation activities in this area.

What to Expect

No additional traffic closures needed. Pedestrian access will be maintained outside the construction area.