Skip to Content
Search

Paving 5thSt./Flower St. Intersection to 6th St./Flower St. Mid-Block

Summary

The Regional Connector Constructors (RCC) will be paving at the intersection of 5th St. and Flower St. and Midblock between 5th St. and 6th St. on Flower St.

Work is anticipated to begin Saturday, December 10, 2016 for one day only.

Anticipated work hours, weather permitting: 8:00 am to 6:00 pm

Essentials

One of four pedestrian crosswalks will be closed off during allowed traffic closures. Access to pedestrians will be maintained outside of the work area.

What to Expect

  • Lane reductions will be in place on southbound Flower St. between 5th St. and Wilshire Blvd; through traffic will be maintained. Left turn onto 6th St. will be accessible.
  • Westbound lanes on 5thSt./Flower St. intersection will be reduced intermittently.
  • The left turn onto southbound Flower St. will remain open at all times.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero