Skip to Content
Search

Waterline Preparation Activity at the 6th St./Flower St. Intersection

Summary

The Regional Connector Constructors (RCC) will be sawcutting and grinding at the intersection of 6th St. and Flower St..

Work is anticipated to begin Saturday, December 3, 2016, for one day. Anticipated work hours are from 8 a.m. to 6 p.m.

Lane reductions will occur on southbound Flower St. between 5th St. and Wilshire Blvd. during work hours, maintaining thru traffic at all times. Southbound Flower St will be reduced to one lane intermittently.

Essentials

One of four pedestrian crosswalks will be closed off during allowed traffic closures. Access to pedestrians will be maintained outside of the work area.

Activities include: sawcutting, grinding and restoring the street.

What to Expect

A directional closure of eastbound 6th St. between Figueroa St. to Flower St. will occur intermittently, maintaining right turns from eastbound 6th St. to southbound Flower St. at all times.

Eastbound 6th St detour
Make a right on Flower St., left on 7th St., left on Olive St., right back on eastbound 6th St.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero