Geotechnical Instrumentation Installation on 2nd St. near San Pedro St.

Summary

Regional Connector Constructors (RCC) will be installing geotechnical instrumentation on westbound 2nd St. between Central Ave. and San Pedro St.

Work will begin on Monday, November 28, and continue for two weeks. Anticipated work hours are 9 a.m. to 9 p.m., Monday through Friday on the first week and 9 a.m. to 3:30 p.m. on the second week.

During the first week, westbound directional closures on 2nd St. between Central Ave. and San Pedro St. will in place and a west or eastbound closure on the second week, on an as needed basis.

Some of the meter parking will be restricted near the work area, on the north side of 2nd St., west of mid-block crossing.

Essentials

Geotechnical instrumentation is needed to monitor the underground work during construction.

Mid-block crosswalk and pedestrian access will be available during work hours.

Local access will be available traveling southbound Central Ave. at 2nd St.

What to Expect

11/28 – 12/2:
Westbound Directional Closure of 2nd St. between Central Ave. and San Pedro St.

Left turns from northbound Central Ave. onto westbound 2nd St. will be restricted during work hours. Only local access to Japanese Village Plaza loading zone and public parking access will be available by entering at 2nd St./Central Ave.

12/5– 12/7:
West or eastbound Directional closure of 2nd St. between Central Ave. and San Pedro St.
Left turns from southbound San Pedro St onto eastbound 2nd St will be restricted during work hours.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero