Geotechnical Instrumentation Installation on 2nd St. between Los Angeles St. & Main St.

Summary

Regional Connect Constructors (RCC) will install geotechnical instruments on 2nd St. between Lose Angeles St. and Main St.

Work is anticipated to begin on Monday, November 21, 2016 and continue for two days.

Anticipated work hours are from 9 a.m. to 3:30 p.m.

This work will require a lane shift on 2nd St between Los Angeles St. and Main St. Thru traffic on 2nd St. between Los Angeles St. and Main St. will be available.

Work will begin on the south side of 2nd St and then switch to the north side of 2nd St.

Essentials

Geotechnical Instrumentation is needed to monitor the on-going underground work during construction.

What to Expect

From eastbound 2nd St. to northbound Los Angeles St. left turn and right turn from westbound 2nd St. to northbound Los Angeles St. will be restricted during work hours.

Eastbound 2nd St. to northbound Los Angeles detour:
Continue on east bound 2nd St., left on San Pedro St., left on 1st St., and back on Los Angeles St.

Westbound 2nd St. to northbound Los Angeles St detour:
Continue on westbound 2nd St., right on Main St., right on 1st St. and back on Los Angeles St.

Metered parking on the south side of 2nd St will be restricted during work hours

Eastbond November 21
A lane shift will occur on eastbound 2nd St.

Westbound November 22
A lane shift will occur on westbound 2nd St.
Local access to driveways to the businesses and stakeholders will be available during installation.

Pedestrian access will be available at all times.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero