Pile Installation on west side Flower St, between 4th and 5th St

Summary

In preparation of the future tunnelling operations, soldier piles will be installed as a support of excavation method on the west side of Flower St. between 4th St and 5th.

Work is anticipated to begin on Monday, June 6th, 2016 and will continue for approximately 6 months.

Anticipated work hours are 7 a.m. to 9 p.m., Monday through Friday and 8a.m. to 6 p.m. on Saturdays.

Right turns from Flower St to 5th St will be restricted when work takes place at the west corner of 5th and Flower. Hours are from 9 a.m.–3:30 p.m., Monday–Friday and 8 a.m.–6 p.m. on Saturday.

Essentials

All work will be conducted on the Westside of Flower St between 4th and 5th. Access to driveways will be maintained during work hours. Activities include pre-trenching, pile drilling, pile installation, concrete/backfill operations and cap beam installation.

What to Expect

A long term lane reduction will take place on the west side of Flower St between 4th St and 5th St.

An additional intermittent lane reduction on Flower St will occur for deliveries only.

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero