Skip to Content

Live Train Testing Florence Ave between Centinela Av and West Bl

Summary

As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will be performing live train clearance testing along Florence Av from Centinela Av to West Bl. The testing will be to confirm clearance and contact with the Overhead Catenary System (OCS).

Essentials

WHAT: Live Train testing
WHEN: Tuesday, November 17, 2020, from 6am to 5pm. Weather permitting.
WHERE: Florence Ave between Centinela Ave and West Bl
DURATION: One day

What to Expect

Intermittent delays at the railroad crossings periodically throughout the day.

Safety officials will assist with traffic management at the intersection/railroad crossings as the train passes.

Trains will be traveling at variable speeds along Florence Av.

Access to emergency responders will be maintained.

Safety Tips

  • Please obey all warning signs and traffic signals
  • Never walk on tracks
  • Watch for trains from both directions
  • Use crosswalks. Do not jaywalk across the tracks