Skip to Content
Search

Falsework Installation Preparation at Manchester between Portal Ave. and Florence Ave.

Summary

Walsh-Shea Corridor Constructors (WSCC) is working on the preparation for falsework installation (framing) on Manchester Av, west of Florence Av/Aviation Bl.  This work will require lane reductions on Manchester Av. One lane in each direction will be maintained at all times.

The sidewalk on either the north or south side of Manchester Av will be closed at all times during the length of this activity on Manchester Av. Signs will guide pedestrians through the pedestrian detour. 

Essentials

WHAT: Falework Installation Preparation

WHEN: May 13, 2016 from 9 p.m. to 6 a.m. and 9 a.m. to 3 p.m., Monday through Friday, weather permitting

WHERE:  Manchester Ave. between Portal Ave. and Florence Ave./Aviation Blvd.

DURATION: Two weeks

What to Expect

  • Local access will be maintained.
  • Lane reductions for easbtound and westbound traffic on Manchester Ave. at Florence Ave/Aviation Blvd.
  • One lane in each direction will be maintained at all times.
  • The sidewalk on the south side of Manchester Ave. will be closed between Bellanca Ave. and Florence Ave./Aviation Blvd. Upon completion and reopening of the new pedestrian covered walkway, WSCC will close the north side sidewalk. 

Program Notes

Eat, Shop, Play Local

Website | Upcoming Events | Twitter | Facebook

Was this information useful?

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero