Environmental Overview

An Environmental Impact Report (EIR) and an Environmental Impact Statement (EIS) are being prepared pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) to comply with state and federal environmental requirements, respectively. The Link US Draft Environmental Impact Report (EIR) was available for public review from January 17 to March 4, 2019. The Link US project team has been coordinating with key stakeholders and agencies to respond to comments. An electronic copy of the Final EIR and appendices will be available for public viewing starting as early as summer 2019.

Draft EIR

1. Proposed Project

  • Up to 10 run-through tracks over US-101 and a new loop-track
  • High-Speed Rail trains would operate on two shared lead tracks with Regional/Intercity trains
  • One new additional lead track in the “Throat” area (six lead tracks total)
  • Above-grade passenger concourse with new expanded passageway

Proposed Project

2. Build Alternative

  • Up to 10 run-through tracks over US-101
  • High-Speed Rail trains would operate on separate (dedicated) lead tracks
  • Two new additional lead tracks in the “Throat” area (seven lead tracks total)
  • At-grade passenger concourse

Build Alternative - Up to 10 New Run-Through Tracks with Shared Tracks

3. No Project/No Build Alternative

  • Assumes LAUS and the existing stub-end tracks remain as-is.

Final EIR

Based on comments received on the Draft EIR and the outcome of considerable coordination with project funding partners and rail operators, the Final EIR includes the following modifications to the Draft EIR project:

  • Removal of Above-Grade Passenger Concourse
  • Removal of Loop Track
  • Removal of Construction Access Road
  • Removal of Construction Staging Areas
  • Removal of Property Takes

Learn more about the recent changes to the project from the June 6th Open House

Project Components Aerial Map

Project Components Aerial Map

Link US Project Development Overview

We are currently preparing environmental studies and conceptual engineering for the project. Completion of the design will take place once the project is environmentally cleared to proceed into the final design stage. Ongoing public engagement will occur within each phase.

Anticipated Project Development Process

  • Early Planning
  • Draft Environmental Studies and Conceptual Engineering (current status)
  • Final Environmental Clearance
  • Final Design
  • Construction
  • Open for Service

Environmental Schedule

Stage 1 Spring 2016 Notice of Preparation
30-Day Public Scoping Period
Public Scoping meeting
Stage 2 Spring 2016 - Fall 2018 Detailed project description
Technical studies
Stage 3 Winter - Spring 2019 Draft Environmental Impact Report (EIR)
45-day Public Comment Period (January 17 to March 4, 2019)
Public Hearing: Tuesday, January 29, 2019 6-8pm (Metro Headquarters, Board Room, 3rd Floor)
Stage 4 Summer 2019 Final Environmental Document
Board Certification