Skip to Content
Search

Draft Environmental Impact Report/Environmental Reevaluation

COVER SHEET

TITLE SHEET

Executive Summary

ABSTRACT

TABLE OF CONTENTS

Chapter 1   INTRODUCTION

1.1   Background
1.2   Project Description
1.3   Purpose of this Document

  • 1.3.1    Basis in NEPA
  • 1.3.2    Basis in CEQA

Chapter 2   CHANGE IN PROJECT SCOPE

2.1   Reason for the Change
2.2   Proposed Project Scope

  • 2.2.1    Tolls
  • 2.2.2    Tolling Points
  • 2.2.3    Entrance and Exit Points
  • 2.2.4    Operations

Chapter 3   CHANGES TO ENVIRONMENTAL IMPACTS OF THE PROJECT

3.1   Traffic

  • 3.1.1    Existing Conditions
  • 3.1.2    Opening Year (2018) Conditions
  • 3.1.3    Design Year (2035) Conditions
  • 3.1.4    Environmental Consequences

3.2   Air Quality

  • 3.2.1    Regulatory Setting
  • 3.2.2    Affected Environment
  • 3.2.3    Environmental Consequences

3.3   Noise

  • 3.3.1    Regulatory Setting
  • 3.3.2    Existing Noise Levels
  • 3.3.3    Future Noise Levels
  • 3.3.4    Noise Impacts
  • 3.3.5    Noise Abatement Analysis
  • 3.3.6    Recommended Sound Barriers

Chapter 4   California Environmental Quality Act Evaluation

4.1   Determining Significance Under CEQA
4.2   Discussion of Significance of Impacts
4.3   Mitigation Measures for Significant Impacts Under CEQA
4.4   Climate Change

  • 4.4.1    Regulatory Setting
  • 4.4.2    Project Analysis
  • 4.4.3    Construction Emissions
  • 4.4.4    Greenhouse Gas Reduction Strategies
  • 4.4.5    Adaptation Strategies

Chapter 5   List of Preparers

Appendices

Appendix A  Noise Impact and Abatement Tables

Appendix B  Sound Barrier Maps

Appendix B  Sound Barrier Maps (Recommended)

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero