December

  • December 17 - As part of the continuing construction of the Metro Gold Line Eastside Extension, the Contractor will continue civil improvements and crosswalk construction on the west side of Indiana St. at Second St. This construction activity requires a full street closure of Second St. at Indiana.
  • December 1 - As part of the continuing construction of the Metro Gold Line Eastside Extension, the Contractor will begin sidewalk work and temporary street paving on the west side of Indiana St., between First St. and Third St.

November

  • November 17 - To improve strength and durability of the busway, Metro is re-paving portions of the roadway from Hazeltine Ave. to Woodman Ave. and from Oxnard St. to Burbank Blvd. These operations will require demolition of existing pavement, grinding, scraping, removal of material, placement of new material, compacting of soils and asphalt and re-striping of the busway, pedestrian crossings and re-installation of traffic signal detector loops.
  • November 5 - As part of the continuing construction activities of the Metro Gold Line Eastside Extension, the Contractor will start installation of irrigation and landscape along the alignment. This construction activity will start at Atlantic and Pomona and move westerly to Indiana. The activity will continue northerly on Indiana and complete on First St. at Alameda.
  • November 6 - Beginning on Thursday, November 6, 2008, the Contractor will close Westbound First St. between State and Cummings to facilitate repairing the damaged water service for 2 days. Vehicles will not be allowed to park in the middle of First St. This configuration will allow for set-up of construction equipment and vehicles.
  • November 4 - On Monday, November 3 and Tuesday, November 4, 2008, and Monday, November 10, and Tuesday, November 11, 2008, the Contractor will close westbound First St. between Utah and Anderson to facilitate delivery and unloading of Pico/Aliso Station canopies.

October

  • October 24 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Metro Contractor will pour concrete on the sidewalk and on the baggage handling roadway; pedestrian traffic will be rerouted.
  • October 20 - Beginning on Monday, October 20, 2008 and Tuesday, October 21, 2008, the Contractor will close westbound First St. between Utah and Anderson to facilitate delivery and unloading of Pico/Aliso Station Canopies.
  • October 20 - As part of the continuing construction activities of the Metro Gold Line Eastside Extension, the Contractor will start the rail grinding. This construction activity will start at Atlantic and Pomona and move west to Indiana. The activity will continue northerly on Indiana and complete on First St. at Lorena, west of Indiana.
  • October 20 - As part of the continuing construction activities of the Metro Gold Line Eastside Extension, the Contractor will continue civil improvements along Alameda. This construction activity requires the removal of the existing crosswalk and the construction of the new colored pedestrian walkway at Alameda and First St. and Alameda and Temple.
  • October 14 - As part of the continuing construction of the Metro Gold Line Eastside Extension, the Contractor will re-stripe Lorena Street at First St. This construction activity is necessary for the Contractor to complete civil construction.

September

  • September 29 - As part of the continuing construction of the Metro Gold Line Eastside Extension, the Contractor will re-stripe Lorena St. at First St. This construction activity is necessary for the Contractor to continue cross-walk construction and street paving.
  • September 29 - As part of the continuing construction of the Metro Gold Line Eastside Extension, the Contractor will begin sidewalk work and street paving on the west side of Indiana Street, between Second St. and Gleason St.
  • September 15 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there will be intermittent street closures on Third St. between Atlantic Blvd. and Indiana St. for the final striping of the street.

August

  • August 26 - The Contractor will demolish the sidewalk and the street on Pleasant Ave. from Boyle to the northeast side of Mariachi Plaza. A temporary sidewalk will be installed. The final street repaving is scheduled for the end of October 2008.
  • August 11 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there will be intermittent street closures on Third St. between Atlantic Blvd. and Indiana St. for the final grind and overlay (paving of the street).
  • August 11 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Contractor will pour concrete at the Mariachi Plaza underground station.

July

  • July 28 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there will be a street closure for the final grind and overlay (paving of the street) between Woods Ave. and Atlantic Blvd. along Pomona Blvd.
  • July 26 - As part of the Metro Gold Line Eastside Extension Construction, the DWP will replace a main water line valve along First Street. This construction activity requires the water line to be shut off for approximately six hours starting at 9 a.m.
  • July 24 - As part of the Metro Gold Line Eastside Extension Construction, the DWP will replace a main water line valve along First Street. This construction activity requires the water line to be shut off for approximately six hours starting at 9 a.m.
  • July 23 - Beginning on Wednesday, July 23, 2008 through Friday, July 25, 2008 the contractor will close 3rd St. between Mednik and Arizona for westbound traffic for the installation of a Southern California Edison power conduit. This closure will be implemented between the hours of 9:00 a.m. and 3:00 p.m.
  • July 16 - Wednesday, July 16, 2008, the Contractor will re-stripe the intersection of Third St. and Indiana St. The re- striping will take place during one night only between the hours of 7 p.m. and 6 a.m.
  • July 14 - The Contractor will begin the deck removal at the East Portal. This construction activity requires a full street closure to build the roof of the underground station and finalize civil improvements such as street restoration, curb and gutter, sidewalk reconstruction, and street lighting.
  • July 7 - As part of the continuing construction activities of the Metro Gold Line Eastside Extension, the Contractor will perform utility relocation at the East Portal.
  • July 7 - On Monday, July 6, 2008, the Contractor will be implementing intermittent street closures on Indiana St. between First St. and Third St.
  • July 3 - As part of the continued activities of the Metro Gold Line Eastside Extension, the Contractor will reconfigure traffic along First St., between Bailey and Lorena.
  • July 2 - As part of the continued activities of the Metro Gold Line Eastside Extension, the Contractor will re-stripe traffic along Soto St., between Cesar Chavez and Fourth St.

June

  • June 30 - The Contractor will reconfigure traffic on First Street between Clarence and Utah Sts.
  • June 27 - On Friday, June 27, 2008, the Contractor will be implementing intermittent street closures on Indiana St. between First St. and Third St. The intermittent closures will be implemented between the hours of 9 a.m. to 12 p.m. and are necessary to string cable over the OCS poles at the intersections.
  • June 25 - As part of the continued activities of the Metro Gold Line Eastside Extension, the Contractor will reconfigure traffic on Soto St. During this construction activity, traffic will be shifted to the east side of Soto St. Street parking will be restricted.
  • June 25 - As part of the continued activities of the Metro Gold Line Eastside Extension, the Contractor will pave First St. between Breed St. and Mathews St. This construction activity is necessary to finalize civil improvements along First St.
  • June 22 - As part of the continued activities of the Metro Gold Line Eastside Extension, the Contractor will reconfigure traffic on Soto St.
  • June 14 - As part of the Metro Gold Line Eastside Extension Construction, the DWP will replace a water line valve along First St. This construction activity requires the water line to be shut off for approximately six hours starting Saturday morning at 6 a.m.
  • June 12 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Metro Contractor has completed the construction of the baggage roadway, pedestrian walkway, and emergency vehicle access road.
  • June 11 - The contractor will begin the construction of the emergency exit and sidewalk excavation at the East Portal.
  • June 9 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous street closures for the final grind and overlay (paving of the street) between Woods Ave. and Atlantic Blvd.
  • June 6 - The Contractor will begin the deck removal at the Soto Station.
  • June 4 - As part of the Metro Gold Line Eastside Extension construction, the Contractor will be removing the concrete barriers in preparation for mountable curb installation.
  • June 4 - Beginning Wednesday, June 4, 2008, the contractor will re-configure traffic flow for First St. to the north end of the street.

May

  • May 27 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, starting the week of May 27, 2008 rock wheeling and fiber installation will begin.
  • May 23 - The Contractor will begin track slab placement at the East Portal.
  • May 14 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous intermittent street closures along Third St. for eastbound traffic between Ford Blvd. and McDonnell Ave.
  • May 14 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous street closures for westbound traffic along Third St.
  • May 13 - The Contractor will begin civil improvements along First St.
  • May 12 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous street closures for westbound traffic along Third St. between Civic Center Dr. and Mednik Ave.
  • May 7 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous street closures for eastboundtraffic along Third St. between Ford Blvd. and Mc Donnell Ave.
  • May 7 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous street closures for eastbound traffic along Third St. between Woods Ave. and Atlantic Blvd.
  • May 7 - The Contractor continues to work on the construction of the Metro Gold Line Eastside Extension and as a result there are continuous street closures for eastbound traffic along Third St. between
  • May 5 - Starting on Monday, May 5, 2008, intermittent closures of the northbound right turn pocket lane of Alameda and Commercial will be in effect, alternating with the shift of westbound traffic to the south on Commercial St./Mednik Ave. and Civic Center Dr.
  • May 1 - Starting on Thursday, May 1, 2008, the Contractor will be transporting rail along First St. between Alameda and Utah.

April

  • April 30 - Beginning on Wednesday, April 30, 2008, the Contractor will re-stripe Third St. between Indiana St. and Ditman Ave.
  • April 29 - Beginning on Tuesday, April 29, 2008, the Contractor will re-stripe Utah to begin guideway work at the intersection of First Street and Utah.
  • April 29 - As part of the Metro Gold Line Eastside Extension Construction, DWP will replace a main water line valve along First St.
  • April 7 - Beginning Monday, April 7, 2008, the contractor will be working on the joint seal application for the final stages of the I-710 freeway overpass retrofit.

March

  • March 28 - The Contractor will begin the deck removal at the West Portal and the Mariachi Plaza Station.
  • March 20 - The Contractor will be working on the installation of the Traction Power Sub Station located on the south east corner of Third St. and Arizona Ave.
  • March 20 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Contractor will pour concrete at the Pico Aliso Station on First St. from Anderson to Utah.
  • March 14 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Contractor will begin excavation for the Boyle Station side structure.
  • March 3 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Contractor will pour concrete at the Pico Aliso Station on First St. from Anderson to Utah.

February

  • February 28 - On Thursday, February 28, 2008 and Friday, February 29, 2008 First St., between Evergreen and Lorena will be closed.
  • February 19 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Contractor will pour concrete at the Pico Aliso Station on First Street from Anderson to Utah.

January

  • January 28 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, starting Monday, January 28, 2008, the Contractor will construct the guideway across the intersection of Mission Rd. and First St.
  • January 27 - Starting at 7 p.m. on January 27, 2008 the Contractor will re-stripe First St. at Mission Rd. and Vignes in preparation for guideway construction on the First Street Bridge that will commence on Monday, January 28, 2008.
  • January 21 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, starting Monday, January 21, 2008, the Contractor will construct the guideway across the intersection of Mission Rd. and First St.
  • January 18 - As part of the continuing construction activities of the Metro Gold Line Eastside Extension, we would like to remind you that parking on, or along, the concrete guideway in the center of the street, continues to be prohibited.
  • January 14 - Beginning on Monday, January 14, 2008, the Contractor will re-stripe First Street at Indiana.
  • January 11 - As part of the continuing construction activities for the Metro Gold Line Eastside Extension, the Contractor will deliver rail on First St. and Alameda.
  • January 9 - The Contractor will begin pile installation in preparation for the Mariachi Plaza station construction of the Metro Gold Line Eastside Extension.
  • January 7 - Starting on Monday, January 7, 2008, AT&T will be installing conduits on First St. west of Vignes St. for the City of Los Angeles Communication Center.
  • January 7 - The Contractor will begin the relocation of power poles along the alignment in preparation for continued construction of the Metro Gold Line Eastside Extension on Monday, January 7, 2008 through Friday, January 11, 2008.
  • January 2 - The contractor will begin utility work and track slab placement on First St., between Lorena and Indiana, on Wednesday, January 2, 2008 from 7 a.m. to 3 p.m., for approximately three days, weather permitting.