09/13/2018

Westbound Lane Reduction for Systems Control Installation
Area: Florence Av between Centinela Av and Hillcrest Bl

Installation of a system control house to assists with the movement of trains. To safely install the, there will a westbound lane reduction on Florence Av between Centinela Av and Hillcrest Bl from 9am to 3:30pm on Thursday, September 13, 2018.

More information about Westbound Lane Reduction for Systems Control Installation in HTML format

09/07/2018

Full Northbound and Southbound Street Closure for Street Restoration
Area: Crenshaw Bl between Exposition Bl and Coliseum St

Full Northbound and Southbound Street Closure for Street Restoration

More information about Full Northbound and Southbound Street Closure for Street Restoration in HTML format

09/06/2018

Street closure for AHCW Installation
Area: Florence Av at Hindry Av

Hindry AHCW Installation

More information about Street closure for AHCW Installation in HTML format

09/06/2018

Street Closure for AHCW Installation
Area: Brynhurst Av between 71st St and 67th St

Byrnhurst Street Closure for AHCW Installation

More information about Street Closure for AHCW Installation in HTML format

09/05/2018

Street Closure
Area: 59th St between Brynhurst Av and 10th Av

Street Closure

More information about Street Closure in HTML format

08/29/2018

Street Closure for AHCW Installation
Area: 71st St between West Bl and Brynhurst Av

Street Closure for AHCW Installation

More information about Street Closure for AHCW Installation in HTML format

08/29/2018

Lane Reduction for AHCW Installation
Area: Oak St and Florence Av

Lane reduction for AHCW Installation

More information about Lane Reduction for AHCW Installation in HTML format

08/27/2018

Traction Power Substation Conduit Installation
Area: Aviation Bl between Imperial Hwy and 117th St

Traction Power Substation Conduit Installation

More information about Traction Power Substation Conduit Installation in HTML format

08/22/2018

Rail Pull on Crenshaw Bl
Area: Crenshaw Bl between Slauson Av and 48th St

Rail Pull on Crenshaw Bl between Slauson Av and 48th St. This will require a closure of approximately 1 hour per intersection.

More information about Rail Pull on Crenshaw Bl in HTML format

08/22/2018

Overhead Catenary System Wire Run Installation Street Closure
Area: Hindry Av Between Florence Av and 83rd St

Overhead Catenary System Wire Run Installation Street Closure

More information about Overhead Catenary System Wire Run Installation Street Closure in HTML format

08/20/2018

Sewer Line Replacement
Area: Vernon Av and Crenshaw Bl

Sewer Line Replacement at Vernon Av and Crenshaw Bl.

More information about Sewer Line Replacement in HTML format

08/10/2018

Continuous Weekend Closure of 48th Street for Grade Crossing
Area: Crenshaw Bl and 48th St

Continuous Weekend Closure of 48th Street for Grade Crossing

More information about Continuous Weekend Closure of 48th Street for Grade Crossing in HTML format

08/08/2018

Civil Improvements on Hindry Av
Area: Hindry Av between Florence Av and 83rd St

Civil Improvements on Hindry Av between Florence Av and 83rd St

More information about Civil Improvements on Hindry Av in HTML format

08/07/2018

Panel Removal at Crenshaw Bl at Rodeo Rd
Area: Crenshaw Bl at Rodeo Rd

Nightly Panel Removal at Crenshaw Bl at Rodeo Rd for one month

More information about Panel Removal at Crenshaw Bl at Rodeo Rd in HTML format

08/06/2018

Full Crenshaw Bl Northbound and Southbound Street Closure for Street Restoration (MLK Station)
Area: Crenshaw Bl between Martin Luther King Jr Bl and Stocker St

Full Crenshaw Bl Northbound and Southbound Street Closure for Street Restoration between Martin Luther King Jr Bl and Stocker St

More information about Full Crenshaw Bl Northbound and Southbound Street Closure for Street Restoration (MLK Station) in HTML format

08/06/2018

Arbor Vitae St Closure for Overhead Catenary System Wire Installation
Area: Arbor Vitae St between Aviation Bl and Bellanca Av

Arbor Vitae St Closure for Overhead Catenary System Wire Installation between Aviation Bl and Bellanca Av

More information about Arbor Vitae St Closure for Overhead Catenary System Wire Installation in HTML format

07/27/2018

Two Additional Days of Full Crenshaw Bl Closure for Street Restoration (Leimert Park Station)
Area: Crenshaw Bl between 48th St and 43rd St/Homeland Dr

Extension of Full Crenshaw Bl Closure for Street Restoration

More information about Two Additional Days of Full Crenshaw Bl Closure for Street Restoration (Leimert Park Station) in HTML format

07/19/2018

Traction Power Substation Installation on Manchester Av
Area: Manchester Av between Portal Av and Aviation Bl

Traction Power Substation Installation on Manchester Av between Portal Av and Aviation Bl

More information about Traction Power Substation Installation on Manchester Av in HTML format

07/12/2018

Traction Power Substation Installation at 48th Street
Area: 48th St and Crenshaw Bl

Traction Power Substation Installation at 48th Street for one day

More information about Traction Power Substation Installation at 48th Street in HTML format

07/07/2018

Street Light Conduit and Foundation Installation on Crenshaw Bl
Area: Crenshaw Bl between 48th St and Rodeo Rd

Street Light Conduit and Foundation Installation on Crenshaw Bl for two months

More information about Street Light Conduit and Foundation Installation on Crenshaw Bl in HTML format

07/01/2018

Continuous Access to Storage Facility at Imperial Hwy
Area: Imperial Hwy and Sundale Av

Continuous Access to Storage Facility at Imperial Hwy and Sundale Av

More information about Continuous Access to Storage Facility at Imperial Hwy in HTML format

07/01/2018

Continuous Access to Storage Facility at Slauson Av
Area: Slauson Av between Normandie Av and Budlong Av

Continuous Access to Storage Facility at Slauson Av between Normandie Av and Budlong Av

More information about Continuous Access to Storage Facility at Slauson Av in HTML format

07/01/2018

Continuous Access to Storage Facility at 67th Street
Area: 67th St between 11th Av and 8th Av

Continuous Access to Storage Facility at 67th Av

More information about Continuous Access to Storage Facility at 67th Street in HTML format

06/29/2018

Street Closure for Grade Crossing Installation
Area: Brynhurst Av between 71st St and 67th St

Street Closure of Brynhurst Av between 71st St and 67th St, for Grade Crossing Installation.

More information about Street Closure for Grade Crossing Installation in HTML format

06/27/2018

Westbound Lane Reduction of Florence Av for AHCW Installation
Area: Florence Av between Centinela Av and Hillcrest Bl

Westbound Lane Reduction of Florence Av between Centinela Av and Hillcrest Bl.

More information about Westbound Lane Reduction of Florence Av for AHCW Installation in HTML format

06/26/2018

Closure of 71st Street for AHCW Installation
Area: 71st St between West Bl and Brynhurst Av

Street closure of 71st St between West Bl and Brynhurst Av. 

More information about Closure of 71st Street for AHCW Installation in HTML format

06/25/2018

Hindry Station Canopy Glass Installation
Area: Florence Av between Hindry Av and Isis Av

Hindry Station Canopy Glass Installation will require nightly lane reductions for both westbound and eastbound traffic on Florence Av between Hindry Av and Isis Av.

More information about Hindry Station Canopy Glass Installation in HTML format

06/15/2018

Full Northbound and Southbound Street Closure for Street Restoration (Leimert Park Station)
Area: Crenshaw Bl between 48th St and 43rd St/Homeland Dr

As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will be working on the restoration of Crenshaw Bl.  

More information about Full Northbound and Southbound Street Closure for Street Restoration (Leimert Park Station) in HTML format

06/15/2018

Crenshaw Bl Station Area Restoration Closures [Updated Timeline]
Area: Crenshaw Bl, Three Phases Between 48th St and Exposition Bl

Restoration will take place at the three underground station areas along Crenshaw Bl. To complete the process, work at each station will be performed separately as three phases 

More information about Crenshaw Bl Station Area Restoration Closures [Updated Timeline] in HTML format

06/08/2018

Continuous Street Closure
Area: Crenshaw Bl and Slauson Av

As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will be working on the at grade crossing at Crenshaw Bl and Slauson Av starting at 9am on Friday, June 8, 2018.

More information about Continuous Street Closure in HTML format

06/04/2018

Duct Bank Installation
Area: Eucalyptus Av between Florence Av and Oak St

As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will be working on the installation of the duct bank at Eucalyptus Av between Florence Av and Oak St. This work will be completed in two phases and is anticipated to last for one month.

More information about Duct Bank Installation in HTML format

05/24/2018

Street Light Conduit Installation
Area: Crenshaw Bl between Homeland Dr/43rd St and 43rd Pl

As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will continue working on civil improvements. The continuous civil work in this area includes sidewalk removal, street light conduit trenching and temporary paving. This work is anticipated to be completed over three weeks, starting Tuesday, May 29, 2018.

More information about Street Light Conduit Installation in HTML format

05/21/2018

Imperial Hwy at Aviation Bl
Area: Imperial Hwy at Aviation Bl

As part of Metro's Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will be working on civil improvements at the Imperial Hwy and Aviation Bl intersection. The civil work includes saw cut, demolition, excavation, grading and preparation for curb and gutter installation. This work will be implemented in phases, with each phase lasting approximately three weeks each.

More information about Imperial Hwy at Aviation Bl in HTML format

05/21/2018

Continuous Street Closure of 52nd St at Crenshaw Bl
Area: 52nd St and Crenshaw Bl

Continuous Street Closure at 52nd St and Crenshaw Bl for 72 hours.

More information about Continuous Street Closure of 52nd St at Crenshaw Bl in HTML format

05/21/2018

Street Closure for Duct Bank Installation at Slauson Av and Crenshaw Bl
Area: Slauson Av and Crenshaw Bl

Three Week Street Closure for Duct Bank Installation at Slauson Av and Crenshaw Bl

More information about Street Closure for Duct Bank Installation at Slauson Av and Crenshaw Bl in HTML format

05/17/2018

Continuous Street Closure of 57th St at Crenshaw Bl
Area: 57th St at Crenshaw Bl

Continuous Street Closure of 57th St, at Crenshaw Bl for 72 hours.

More information about Continuous Street Closure of 57th St at Crenshaw Bl in HTML format

05/14/2018

Continuous Street Closure of 50th St at Crenshaw Bl
Area: 50th St at Crenshaw Bl

72-hour Continuous Street Closure of Crenshaw Bl and 50th St

More information about Continuous Street Closure of 50th St at Crenshaw Bl in HTML format

05/14/2018

Two Night Street Closure Of Arbor Vitae St and Portal Av
Area: Arbor Vitae St and Portal Av

Two Night Street Closure Of Arbor Vitae St and Portal Av.

More information about Two Night Street Closure Of Arbor Vitae St and Portal Av in HTML format

05/11/2018

Continuous Weekend Street Closure of West Bl between 71st St and Redondo Bl
Area: West Bl between 71st St and Redondo Bl

Continuous One Weekend Street Closure of West Bl between 71st St and Redondo Bl 

More information about Continuous Weekend Street Closure of West Bl between 71st St and Redondo Bl in HTML format

05/07/2018

Duct Bank Installation at Slauson Av and Crenshaw Bl
Area: Slauson Av and Crenshaw Bl

Six Week Duct Bank Installation at Slauson Av and Crenshaw Bl.

More information about Duct Bank Installation at Slauson Av and Crenshaw Bl in HTML format

05/07/2018

LA DWP Power Line Installation at Crenshaw Bl and 48th St
Area: Crenshaw Bl and 48th St

LA DWP Power Line Installation at Crenshaw Bl and 48th St during three months. 

More information about LA DWP Power Line Installation at Crenshaw Bl and 48th St in HTML format

05/07/2018

Westbound Directional Street Closure of Century Bl between Aviation Bl and Bellanca Av
Area: Century Bl between Aviation Bl and Bellanca Av

Three Night Westbound Directional Street Closure of Century Bl between Aviation Bl and Bellanca Av

More information about Westbound Directional Street Closure of Century Bl between Aviation Bl and Bellanca Av in HTML format

05/07/2018

Civil Improvements on Hindry Av between Florence Av and 83rd St
Area: Hindry Av between Florence Av and 83rd St

Four Weeks of Civil Improvements on Hindry Av between Florence Av and 83rd St.

More information about Civil Improvements on Hindry Av between Florence Av and 83rd St in HTML format

05/07/2018

Continuous Eastbound and Westbound Street Closure of 60th St at Crenshaw Bl
Area: Eastbound and Westbound 60th St at Crenshaw Bl

Four Day Continuous Eastbound and Westbound Street Closure of 60th St at Crenshaw Bl

More information about Continuous Eastbound and Westbound Street Closure of 60th St at Crenshaw Bl in HTML format

05/07/2018

Street Light Conduit Installation on Crenshaw Bl Between Brynhurst Av and 48th St
Area: Crenshaw Bl Between Brynhurst Av and 48th St

Two Week Street Light Conduit Installation on Crenshaw Bl Between Brynhurst Av and 48th St

More information about Street Light Conduit Installation on Crenshaw Bl Between Brynhurst Av and 48th St in HTML format

04/09/2018

Civil Improvements at Century Bl and Aviation Bl
Area: Century Bl and Aviation Bl

3 Weeks of Lane Restrictions for Civil Improvements at Century Bl and Aviation Bl

More information about Civil Improvements at Century Bl and Aviation Bl in HTML format

04/09/2018

Northbound Street Closure of Crenshaw Bl between 48th St and Vernon Ave
Area: Crenshaw Bl between 48th St and Vernon Ave

Two-Month Nighttime Northbound Street Closure of Crenshaw Bl between 48th St and Vernon Ave

More information about Northbound Street Closure of Crenshaw Bl between 48th St and Vernon Ave in HTML format

04/09/2018

Continuous Eastbound and Westbound Street Closure at 60th St at Crenshaw Bl
Area: 60th St at Crenshaw Bl

7-Day Continuous Eastbound and Westbound Street Closure  at 60th St at Crenshaw Bl

More information about Continuous Eastbound and Westbound Street Closure at 60th St at Crenshaw Bl in HTML format

04/02/2018

Sewer Line Replacement at Slauson Av and Crenshaw Bl
Area: Slauson Av and Crenshaw Bl

Sewer Line Replacement at Slauson Av and Crenshaw Bl for Four Weeks.

More information about Sewer Line Replacement at Slauson Av and Crenshaw Bl in HTML format

04/02/2018

Roadway Improvements at La Cienega Bl and Florence Av
Area: La Cienega Bl and Florence Av

Roadway Improvements at La Cienega Bl and Florence Av for five weeks.

More information about Roadway Improvements at La Cienega Bl and Florence Av in HTML format

03/26/2018

Through-Traffic Street Closure at 48th St and Crenshaw Bl
Area: 48th St and Crenshaw Bl

Through-traffic Street Closure at 48th St and Crenshaw Bl for six weeks.

More information about Through-Traffic Street Closure at 48th St and Crenshaw Bl in HTML format

03/23/2018

Through-Traffic Street Closure at 54th St and Crenshaw Bl
Area: 54th St and Crenshaw Bl

Three week through-traffic Street closure at 54th St and Crenshaw Bl.

More information about Through-Traffic Street Closure at 54th St and Crenshaw Bl in HTML format

03/21/2018

Arbor Vitae Lane Closures between Airport & Aviation
Area: Arbor Vitae between Airport Bl & Aviation Bl

Weekday closures for two eastbound lanes, one westbound lane, and the southern sidewalk on Arbor Vitae Street between Airport Blvd and Aviation Blvd.

More information about Arbor Vitae Lane Closures between Airport & Aviation in HTML format

03/19/2018

Street Closure Extension of Brynhurst Av between 71st St and 67th St
Area: Brynhurst Av between 71st St and 67th St

Street Closure Extension of Brynhurst Av between 71st St and 67th St

More information about Street Closure Extension of Brynhurst Av between 71st St and 67th St in HTML format

03/07/2018

Through Traffic Closure of 52nd St at Crenshaw Bl
Area: 52nd St at Crenshaw Bl

full through-traffic closure for eastbound and westbound traffic on 52nd St at Crenshaw Bl.

More information about Through Traffic Closure of 52nd St at Crenshaw Bl in HTML format

03/01/2018

Through Traffic Closure of 57th St at Crenshaw Bl
Area: 57th St at Crenshaw Bl

 Closure for eastbound and westbound traffic on 57th St at Crenshaw Bl. 

More information about Through Traffic Closure of 57th St at Crenshaw Bl in HTML format

01/26/2018

Temporary Green Line Station Closures
Area: Green Line

Five Green Line Station shut-down to allow Crenshaw/LAX Transit Project connection

More information about Temporary Green Line Station Closures in HTML format

12/15/2017

Rebar Delivery on Crenshaw Bl between 43rd Pl and 43rd St
Area: Crenshaw Bl between 43rd Pl and 43rd St

Rebar Delivery on Crenshaw Bl between 43rd Pl and 43rd St. Work will impact one northbound lane during off-peak traffic hours. 

More information about Rebar Delivery on Crenshaw Bl between 43rd Pl and 43rd St in HTML format

03/18/2016

Permanent Street Closure: Victoria Ave. between 67th St. and 71st St.
Area: Victoria Ave. between 67th St. & 71 St.

Walsh-Shea Corridor Constructors (WSCC) will be implementing a full closure and reconfiguration of Victoria Av between 67th St and 71st St. The exact limits of the closure will be the current abandoned railroad tracks (Metro Right-Of-Way). Local access will be maintained up to the closure boundaries.

More information about Permanent Street Closure: Victoria Ave. between 67th St. and 71st St. in HTML format

10/14/2015

Duration of Project Street Closure: Cable St at Ivy Av
Area: Cable St at Ivy Av

Walsh-Shea Corridor Constructors (WSCC) will implement a street closure (pending application for permanent closure) of Cable Pl at Ivy Av to accommodate dual train tracks on Metro Right-Of-Way.  This closure is scheduled to take place on Wednesday, October 14, 2015. 

More information about Duration of Project Street Closure: Cable St at Ivy Av in HTML format

07/31/2015

Reconfiguración del Tráfico: Bulevar Crenshaw entre las calles 50 y 43
Area: Bulevar Crenshaw entre las calles 50 y 43

Walsh-Shea Corridor Constructors (WSCC) implementará la reconfiguración de tráfico en el bulevar Crenshaw entre las calles 50 y 43 para instalar pilas de soldado y apoyar la excavación de la boca del túnel.

More information about Reconfiguración del Tráfico: Bulevar Crenshaw entre las calles 50 y 43 in HTML format

07/31/2015

Traffic Reconfiguration: Crenshaw Bl between 50th St and 43rd St
Area: Crenshaw Bl between 50th St and 43rd St

Walsh-Shea Corridor Constructors (WSCC) will be reconfiguring traffic on Crenshaw Bl between 50th St and 43rd St to install piles and support the continued excavation of the tunnel portal.

More information about Traffic Reconfiguration: Crenshaw Bl between 50th St and 43rd St in HTML format

05/01/2015

Redondo Bl at Florence Av
Area: Redondo Bl at Florence Av

Permanent Street Closure at Redondo Bl at Florence Av

More information about Redondo Bl at Florence Av in HTML format

01/01/2014

Crenshaw/LAX Daily Update
Area: Crenshaw/LAX Daily Update

ViewlLive traffic via Waze

More information about Crenshaw/LAX Daily Update in HTML format
Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero