Date Notice Brief Detail

June 17

Improved signage and stripping on Vignes and 2nd St

Improved signage and stripping on Vignes and 2nd St in downtown LA

More information about Improved signage and stripping on Vignes and 2nd St in HTML format

June 10

Pile Installation on Alameda St and Temple St

Pile installation on Alameda St and Temple St in downtown LA

More information about Pile Installation on Alameda St and Temple St in HTML format

June 01

Deck Panel Maintenance on Flower St, between 6th St and Wilshire Bl

Deck panel maintenance on Flower St in downtown LA.

More information about Deck Panel Maintenance on Flower St, between 6th St and Wilshire Bl in HTML format

May 28

LADWP-Power Installation on Alameda between 1st St and Commercial St

LADWP-Power Installation on Alameda between 1st St and Commercial St, in downtown LA.

More information about LADWP-Power Installation on Alameda between 1st St and Commercial St in HTML format

May 21

Manhole Survey on Alameda St, between Temple and 1st St

Manhole survey on Alameda St in downtown LA.

More information about Manhole Survey on Alameda St, between Temple and 1st St in HTML format

May 17

Deck Panel Maintenance on Flower St between 5th and 6th Street

Deck panel maintenance on Flower St in downtown LA.

More information about Deck Panel Maintenance on Flower St between 5th and 6th Street in HTML format

May 01

Street Closures and Detours

Review the real-time map and longer term street impacts.

More information about Street Closures and Detours in HTML format

April 30

7th St/Metro Center Station surveying

Surveying at the 7th St/Metro Center Station in downtown LA.

More information about 7th St/Metro Center Station surveying in HTML format

April 25

Deck Panel Install on 1st St between Alameda St and Rose St

Deck panel installation on 1st St in Little Tokyo.

More information about Deck Panel Install on 1st St between Alameda St and Rose St in HTML format

April 22

Third party work: SoCalGas utility relocation

Third party work: Utility relocation in Little Tokyo.

More information about Third party work: SoCalGas utility relocation in HTML format

April 18

Yard Maintenance on 1st St, between Alameda and Rose St

Yard maintenance on 1st St, between Rose and Alameda St, in downtown LA.

More information about Yard Maintenance on 1st St, between Alameda and Rose St in HTML format

April 06

Excavation Activities on Flower St between 6th St and Wilshire Bl

Excavation activities on Flower St between 6th St and Wilshire Bl in downtown LA.

More information about Excavation Activities on Flower St between 6th St and Wilshire Bl in HTML format

April 02

Utility surveying on Alameda St, between 1st and Temple St

Utility surveying on Alameda St, between 1st St and Temple St, in downtown LA.

More information about Utility surveying on Alameda St, between 1st and Temple St in HTML format

March 30

Utility Work at 6th and Flower St Intersection

Utility work at 6th and Flower St intersection in downtown LA.

More information about Utility Work at 6th and Flower St Intersection in HTML format

March 27

Geotechnical Instrumentation Maintenance at 2nd St/Spring St

Geotechnical instrumentation maintenance at 2nd St/Spring St in downtown Los Angeles.

More information about Geotechnical Instrumentation Maintenance at 2nd St/Spring St in HTML format

March 26

Equipment Mobilization at 5th and Flower St

Equipment mobilization at 5th and Flower St in downtown LA.

More information about Equipment Mobilization at 5th and Flower St in HTML format

March 23

Paving on Alameda St, between 1st and Temple St

Paving on Alameda St, between 1st and Temple St, in downtown LA.

More information about Paving on Alameda St, between 1st and Temple St in HTML format

March 16

Street Closure for Utility Work at 2nd St between Main St and Spring St

Utility work at the 2nd St/Spring St intersection in downtown LA.

More information about Street Closure for Utility Work at 2nd St between Main St and Spring St in HTML format

March 16

Deck Panel Removal and Excavation

Deck panel removal and excavation on Flower St in downtown LA.

More information about Deck Panel Removal and Excavation in HTML format

March 07

Utility investigation on Alameda St, between 1st and Temple St.

Utility investigation on Alameda St, between 1st and Temple St, in downtown LA.

More information about Utility investigation on Alameda St, between 1st and Temple St. in HTML format

February 23

Paving for utility installation

Paving for utility installation in downtown LA's Financial District.

More information about Paving for utility installation in HTML format

February 21

Geotechnical Repair at 2nd and Los Angeles St.

Geotechnical repair at 2nd and Los Angeles St in downtown Los Angeles.

More information about Geotechnical Repair at 2nd and Los Angeles St. in HTML format

February 04

Geotechnical device maintenance on 2nd St, from Main to Spring St

Geotechnical device maintenance on 2nd St, from Main to Spring St, in downtown LA.

More information about Geotechnical device maintenance on 2nd St, from Main to Spring St in HTML format

February 02

Storm Drain Work on 2nd St, between Spring St and Broadway

Storm drain install on 2nd St in downtown LA.

More information about Storm Drain Work on 2nd St, between Spring St and Broadway in HTML format

February 01

Construction Activities at the 1st St/Central Av, 1st St and the Mangrove Yards

Construction activities at the 1st/Central, 1st St, and Mangrove Yards in downtown Los Angeles.

More information about Construction Activities at the 1st St/Central Av, 1st St and the Mangrove Yards in HTML format

January 25

Utility vault installation at 7th/Flower St

Utilty vault installation at Flower St and 7th St in downtown LA

More information about Utility vault installation at 7th/Flower St in HTML format

January 24

Utility Vault Installation Preparation

Utility vault installation preparation on Flower St in downtown LA

More information about Utility Vault Installation Preparation in HTML format

January 19

Deck panel removal for excavation on west side of Flower St

Deck panel removal on Flower St in downtown LA.

More information about Deck panel removal for excavation on west side of Flower St in HTML format

January 18

Utility vault installation on 7th St

Utility vault installation on 7th St in downtown LA

More information about Utility vault installation on 7th St in HTML format

January 18

Geotech device maintenance on 2nd and Spring St

Geotech device maintenance at 2nd and Spring St in downtown LA.

More information about Geotech device maintenance on 2nd and Spring St in HTML format

January 07

Geotech device maintenance on 2nd and Spring St

Geotech device maintenance on 2nd St in downtown Los Angeles.

More information about Geotech device maintenance on 2nd and Spring St in HTML format

January 07

LADWP-Power Vault Inspection on 1st St between Vignes St and Alameda St

LADWP-Power Vault Inspection on 1st St in Little Tokyo

More information about LADWP-Power Vault Inspection on 1st St between Vignes St and Alameda St in HTML format

January 01

1번가/센트럴, 1번가와 망그로브 야드에서 공사 작업

1번가/센트럴, 1번가와 망그로브 야드에서 공사 작업

More information about 1번가/센트럴, 1번가와 망그로브 야드에서 공사 작업 in HTML format

January 01

1st/セントラル、1st St、およびMangroveヤードでの建設作業

1st/セントラル、1st St、およびMangroveヤードでの建設作業

More information about 1st/セントラル、1st St、およびMangroveヤードでの建設作業 in HTML format

January 01

Actividades de construcción en 1st/Central, 1st St. y la obra de Mangrove.

Actividades de construcción en 1st/Central, 1st St. y la obra de Mangrove.

More information about Actividades de construcción en 1st/Central, 1st St. y la obra de Mangrove. in HTML format

January 01

1st およびセントラルステーションでのコンクリート打設

1st およびセントラルステーションでのコンクリート打設

More information about 1st およびセントラルステーションでのコンクリート打設 in HTML format

January 01

Colocación del concreto en la estación de la 1st y Central

Colocación del concreto en la estación de la 1st y Central  

More information about Colocación del concreto en la estación de la 1st y Central in HTML format

January 01

1번가와 중앙역에서 콘크리트 타설

1번가와 중앙역에서 콘크리트 타설  

More information about 1번가와 중앙역에서 콘크리트 타설 in HTML format

December 05

Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021

Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021

More information about Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021 in HTML format

November 29

Deck panel removal for excavation on east side of Flower St

Deck panel removal for excavation on Flower St in downtown Los Angeles.

More information about Deck panel removal for excavation on east side of Flower St in HTML format

September 15

Utility work at 6th St and Flower St

Utility work

More information about Utility work at 6th St and Flower St in HTML format

September 14

Concrete placement on Flower St

Concrete placement

More information about Concrete placement on Flower St in HTML format

August 27

Train communications line work

Train communication line work

More information about Train communications line work in HTML format

July 02

Utility investigation activities on Flower St and 7th St

Utility investigation

More information about Utility investigation activities on Flower St and 7th St in HTML format

May 23

1st and Central Concrete Placement

Concrete placement

More information about 1st and Central Concrete Placement in HTML format

May 07

Concrete Placement at the Historic Broadway Station

Concrete placement

More information about Concrete Placement at the Historic Broadway Station in HTML format

April 30

Utility investigation activities at 6th/Flower St

Utility investigation

More information about Utility investigation activities at 6th/Flower St in HTML format

February 26

Station Excavation at 1st/Central station site

Station excavation & weekend closures

More information about Station Excavation at 1st/Central station site in HTML format

January 01

Regional Connector Public Meetings - 2018

Schedule of pubic meetings

More information about Regional Connector Public Meetings - 2018 in HTML format

November 04

Concrete Placement at the Grand Av Arts/Bunker Hill Station

Concrete pour

More information about Concrete Placement at the Grand Av Arts/Bunker Hill Station in HTML format

August 30

Construction Activities at the 1st/Central & Mangrove Yards

Support of tunneling

More information about Construction Activities at the 1st/Central & Mangrove Yards in HTML format

August 04

Construction Activities at the 2nd/Hope Station Yard

Various activities

More information about Construction Activities at the 2nd/Hope Station Yard in HTML format

May 08

Excavation Continues on Flower St. between 4th St. and 6th St.

Excavation

More information about Excavation Continues on Flower St. between 4th St. and 6th St. in HTML format

June 08

Bus Stop Relocation at 3rd St/Flower St

Beginning Monday, June 8, 2015 the bus stop at the 3rd St/Flower St intersection will be relocated to the south east corner of 3rd St/Hope St.

More information about Bus Stop Relocation at 3rd St/Flower St in HTML format
More information about Bus Stop Relocation at 3rd St/Flower St in PDF format
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero