January 29

Alameda Tunnel Box Construction

Regional Connector Constructors (RCC) will implement an extended closure of Temple St between Alameda St and Garey St for the construction of the Alameda Tunnel Box. The 24/7 closure is anticipated to begin on Friday, January 29, 2021 at 7pm and continue for approximately six months. 

More information about Alameda Tunnel Box Construction in HTML format

December 16

Water Line Installation

Regional Connector Constructors (RCC) will conduct water line relocation on Temple St between Alameda and Garey St. This work is anticipated begin on Wednesday, December 16, 2020, from 7 pm to 5 am, and continue for approximately one month, during the week. 

More information about Water Line Installation in HTML format

December 12

Pile Installation and Utility Investigation

Regional Connector Constructors (RCC) will continue utility investigation and installation of piles along Temple St at Alameda.

More information about Pile Installation and Utility Investigation in HTML format

December 07

Utility Relocation

City of Los Angeles Department of Water and Power will continue utility relocation on 1st St between Vignes St and Alameda St. Work is anticipated to continue Monday, December 7, 2020 and continue for approximately three weeks.

More information about Utility Relocation in HTML format

November 20

Central Av Restoration

Regional Connector Constructors (RCC) has completed the deck removal work and will be removing the partial closure of Central Av between 1st St and 2nd St. A closure of 1st St between San Pedro St and Alameda will be in place as well to repave 1st St/Central Av intersection.

More information about Central Av Restoration in HTML format
More information about Central Av Restoration in PDF format

November 05

Driveway Paving

Regional Connector Constructors (RCC) will continue to mobilize equipment into the future Little Tokyo/Arts District Station on Thursday, November 12, 2020. RCC will continue driveway restoration along the construction at the yard on Alameda St.

More information about Driveway Paving in HTML format

November 02

Storm Drain Installation

Regional Connector Constructors (RCC) will continue the installation of a storm drain line on 1st St between Alameda and Central Av.

More information about Storm Drain Installation in HTML format

October 23

Traffic Reconfiguration

Regional Connector Constructors (RCC) will be performing traffic reconfiguration at the intersection of 1st St/Alameda for Alameda tunnel box construction.

More information about Traffic Reconfiguration in HTML format

October 15

Equipment Mobilization and Pile Installation

Teaser text

More information about Equipment Mobilization and Pile Installation in HTML format

October 04

Historic Broadway Station Street Restoration

Regional Connector Constructors (RCC) will implement an extended closure of 2nd St between Spring St and Broadway for deck removal and street restoration as early as October 30, 2020 through Summer 2021. 

More information about Historic Broadway Station Street Restoration in HTML format

September 25

Pedestrian bridge construction at Hope St

Regional Connector Constructors (RCC) will conduct two 55-hour weekend closures of Hope St between GTK Way and 2nd St for construction of a pedestrian bridge.

More information about Pedestrian bridge construction at Hope St in HTML format

September 23

Civil Restoration and Waterline Relocation

The Contractor will work on waterline relocation on Central Av between 1st St and 2nd St through December 23, 2020. Anticipated work hours are 7:00 pm to 3:30 am.

More information about Civil Restoration and Waterline Relocation in HTML format

September 12

Utility Maintenance Hole Investigation

Regional Connector Constructors (RCC) will implement a traffic restriction on westbound 5th St for utility backfill operations investigation within a utility maintenance hole.

More information about Utility Maintenance Hole Investigation in HTML format

September 11

Sewer Line Installation

Regional Connector Constructors (RCC) will continue the installation of a sewer line on Temple St between Alameda and Garey St. Work continues Monday, September 28, 2020 and continues for approximately five months. Anticipated work hours are Monday through Friday, 7:30 am to 3:30 pm. Saturday as needed.

More information about Sewer Line Installation in HTML format

August 28

道路修復工事 及び閉鎖

Regional Connector Constructors (RCC) は道路修復工事のためにCentral Avの 1st St 及び 2nd St間の閉鎖の延長を実施します。この毎日全日終夜[1] の 閉鎖は2020年の8月28日に開始され約8週間継続します。

More information about 道路修復工事 及び閉鎖 in HTML format

August 26

Utility Investigation

Regional Connector Constructors (RCC) will conduct utility investigation at Hope St between 2nd St and GTK Way. Work is anticipated to begin as early as Wednesday, August 26, 2020, and continue for approximately two weeks. Anticipated work hours will be from 9 am to 3:30 pm Monday through Friday, and Saturday from 8 am to 6 pm. Activities will include set up for traffic, saw cutting, breaking up of concrete, excavating, utility investigation, placing backfill material, and paving.

More information about Utility Investigation in HTML format

August 01

Fall 2020 Regional Connector

The Little Tokyo/Arts District Metro Transit Station will be demolished, and replaced with a new station, located on the Regional Connector alignment.

More information about Fall 2020 Regional Connector in HTML format

July 20

Utility Investigation

Metro’s contractor, Regional Connector Constructors (RCC), will continue utility investigation to survey existing underground utility lines within the Division 20 yard and on 1st St between Mission Rd and Vignes St.

More information about Utility Investigation in HTML format

July 17

Fire Hydrant and Waterline Installation

RCC will install a new fire hydrant and waterline at the southeast corner of 1st St and Central Av.

More information about Fire Hydrant and Waterline Installation in HTML format

June 04

Storm Drain Installation

Regional Connector Constructors (RCC) will continue the installation of a storm drain line on Temple St between Alameda and Garey St. Work is anticipated to begin Thursday, June 24, 2020, and continue for approximately one month. Anticipated work hours will be Monday through Saturday from 6 am to 6 pm.

More information about Storm Drain Installation in HTML format

May 30

Utility Investigation

Regional Connector Constructors (RCC) will conduct utility investigation at the 2nd St and Broadway intersection.  

More information about Utility Investigation in HTML format

May 21

Alameda guideway excavation at Mangrove Yard

Regional Connector Constructors (RCC) will be performing excavation activities for the Alameda guideway within the Mangrove Yard.

More information about Alameda guideway excavation at Mangrove Yard in HTML format

April 20

Backfill Material Delivery on Flower St

Regional Connector Constructors will begin the delivery of backfill material on Flower St, between 4th and 5th St.

More information about Backfill Material Delivery on Flower St in HTML format

April 01

Backfill Material Delivery on Flower St

Work is now scheduled through March 2021, with backfill material delivery and other pre-restoration work planned for Flower St, between 4th St and 6th St. 

More information about Backfill Material Delivery on Flower St in HTML format

January 13

Southern California Gas Line Installation

Utility installation by Southern Califonia Gas Company in downtown LA

More information about Southern California Gas Line Installation in HTML format

January 10

Street Restoration at 1st St and Alameda St

RCC will continue the extended closure of the 1st St and Alameda St intersection for street restoration. A 24/7 closure is anticipated to continue until Monday, August 31, 2020. 

More information about Street Restoration at 1st St and Alameda St in HTML format

October 04

Construction activities on Flower St

Construction activities on Flower St in downtown LA

More information about Construction activities on Flower St in HTML format

May 01

Street Closures and Detours

Review the real-time map and longer term street impacts.

More information about Street Closures and Detours in HTML format

January 01

1번가와 중앙역에서 콘크리트 타설

1번가와 중앙역에서 콘크리트 타설  

More information about 1번가와 중앙역에서 콘크리트 타설 in HTML format

January 01

1st およびセントラルステーションでのコンクリート打設

1st およびセントラルステーションでのコンクリート打設

More information about 1st およびセントラルステーションでのコンクリート打設 in HTML format

January 01

Colocación del concreto en la estación de la 1st y Central

Colocación del concreto en la estación de la 1st y Central  

More information about Colocación del concreto en la estación de la 1st y Central in HTML format

December 05

Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021

Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021

More information about Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021 in HTML format

September 14

Concrete placement on Flower St

Concrete placement for the connection into 7th/Metro Center

More information about Concrete placement on Flower St in HTML format

May 23

1st and Central Concrete Placement

Concrete placement for the Little Tokyo/Arts District station

More information about 1st and Central Concrete Placement in HTML format

May 07

Concrete Placement at the Historic Broadway Station

Concrete placement for the Historic Broadway Station

More information about Concrete Placement at the Historic Broadway Station in HTML format

August 04

Construction Activities at the 2nd/Hope Station Yard

Regional Connector Constructors (RCC) will continue to perform construction activities at the 2nd/Hope Station Yard. Work is anticipated to continue through Summer 2021.

More information about Construction Activities at the 2nd/Hope Station Yard in HTML format