January 29 |
Alameda Tunnel Box Construction Regional Connector Constructors (RCC) will implement an extended closure of Temple St between Alameda St and Garey St for the construction of the Alameda Tunnel Box. The 24/7 closure is anticipated to begin on Friday, January 29, 2021 at 7pm and continue for approximately six months. |
More information about Alameda Tunnel Box Construction in HTML format |
December 16 |
Water Line Installation Regional Connector Constructors (RCC) will conduct water line relocation on Temple St between Alameda and Garey St. This work is anticipated begin on Wednesday, December 16, 2020, from 7 pm to 5 am, and continue for approximately one month, during the week. |
More information about Water Line Installation in HTML format |
December 12 |
Pile Installation and Utility Investigation Regional Connector Constructors (RCC) will continue utility investigation and installation of piles along Temple St at Alameda. |
More information about Pile Installation and Utility Investigation in HTML format |
December 07 |
Utility Relocation City of Los Angeles Department of Water and Power will continue utility relocation on 1st St between Vignes St and Alameda St. Work is anticipated to continue Monday, December 7, 2020 and continue for approximately three weeks. |
More information about Utility Relocation in HTML format |
November 20 |
Central Av Restoration Regional Connector Constructors (RCC) has completed the deck removal work and will be removing the partial closure of Central Av between 1st St and 2nd St. A closure of 1st St between San Pedro St and Alameda will be in place as well to repave 1st St/Central Av intersection. |
More information about Central Av Restoration in HTML format More information about Central Av Restoration in PDF format |
November 05 |
Driveway Paving Regional Connector Constructors (RCC) will continue to mobilize equipment into the future Little Tokyo/Arts District Station on Thursday, November 12, 2020. RCC will continue driveway restoration along the construction at the yard on Alameda St. |
More information about Driveway Paving in HTML format |
November 02 |
Storm Drain Installation Regional Connector Constructors (RCC) will continue the installation of a storm drain line on 1st St between Alameda and Central Av. |
More information about Storm Drain Installation in HTML format |
October 23 |
Traffic Reconfiguration Regional Connector Constructors (RCC) will be performing traffic reconfiguration at the intersection of 1st St/Alameda for Alameda tunnel box construction. |
More information about Traffic Reconfiguration in HTML format |
October 15 |
Equipment Mobilization and Pile Installation Teaser text |
More information about Equipment Mobilization and Pile Installation in HTML format |
October 04 |
Historic Broadway Station Street Restoration Regional Connector Constructors (RCC) will implement an extended closure of 2nd St between Spring St and Broadway for deck removal and street restoration as early as October 30, 2020 through Summer 2021. |
More information about Historic Broadway Station Street Restoration in HTML format |
September 25 |
Pedestrian bridge construction at Hope St Regional Connector Constructors (RCC) will conduct two 55-hour weekend closures of Hope St between GTK Way and 2nd St for construction of a pedestrian bridge. |
More information about Pedestrian bridge construction at Hope St in HTML format |
September 23 |
Civil Restoration and Waterline Relocation The Contractor will work on waterline relocation on Central Av between 1st St and 2nd St through December 23, 2020. Anticipated work hours are 7:00 pm to 3:30 am. |
More information about Civil Restoration and Waterline Relocation in HTML format |
September 12 |
Utility Maintenance Hole Investigation Regional Connector Constructors (RCC) will implement a traffic restriction on westbound 5th St for utility backfill operations investigation within a utility maintenance hole. |
More information about Utility Maintenance Hole Investigation in HTML format |
September 11 |
Sewer Line Installation Regional Connector Constructors (RCC) will continue the installation of a sewer line on Temple St between Alameda and Garey St. Work continues Monday, September 28, 2020 and continues for approximately five months. Anticipated work hours are Monday through Friday, 7:30 am to 3:30 pm. Saturday as needed. |
More information about Sewer Line Installation in HTML format |
August 28 |
道路修復工事 及び閉鎖 Regional Connector Constructors (RCC) は道路修復工事のためにCentral Avの 1st St 及び 2nd St間の閉鎖の延長を実施します。この毎日全日終夜[1] の 閉鎖は2020年の8月28日に開始され約8週間継続します。 |
More information about 道路修復工事 及び閉鎖 in HTML format |
August 26 |
Utility Investigation Regional Connector Constructors (RCC) will conduct utility investigation at Hope St between 2nd St and GTK Way. Work is anticipated to begin as early as Wednesday, August 26, 2020, and continue for approximately two weeks. Anticipated work hours will be from 9 am to 3:30 pm Monday through Friday, and Saturday from 8 am to 6 pm. Activities will include set up for traffic, saw cutting, breaking up of concrete, excavating, utility investigation, placing backfill material, and paving. |
More information about Utility Investigation in HTML format |
August 01 |
Fall 2020 Regional Connector The Little Tokyo/Arts District Metro Transit Station will be demolished, and replaced with a new station, located on the Regional Connector alignment. |
More information about Fall 2020 Regional Connector in HTML format |
July 20 |
Utility Investigation Metro’s contractor, Regional Connector Constructors (RCC), will continue utility investigation to survey existing underground utility lines within the Division 20 yard and on 1st St between Mission Rd and Vignes St. |
More information about Utility Investigation in HTML format |
July 17 |
Fire Hydrant and Waterline Installation RCC will install a new fire hydrant and waterline at the southeast corner of 1st St and Central Av. |
More information about Fire Hydrant and Waterline Installation in HTML format |
June 04 |
Storm Drain Installation Regional Connector Constructors (RCC) will continue the installation of a storm drain line on Temple St between Alameda and Garey St. Work is anticipated to begin Thursday, June 24, 2020, and continue for approximately one month. Anticipated work hours will be Monday through Saturday from 6 am to 6 pm. |
More information about Storm Drain Installation in HTML format |
May 30 |
Utility Investigation Regional Connector Constructors (RCC) will conduct utility investigation at the 2nd St and Broadway intersection. |
More information about Utility Investigation in HTML format |
May 21 |
Alameda guideway excavation at Mangrove Yard Regional Connector Constructors (RCC) will be performing excavation activities for the Alameda guideway within the Mangrove Yard. |
More information about Alameda guideway excavation at Mangrove Yard in HTML format |
April 20 |
Backfill Material Delivery on Flower St Regional Connector Constructors will begin the delivery of backfill material on Flower St, between 4th and 5th St. |
More information about Backfill Material Delivery on Flower St in HTML format |
April 01 |
Backfill Material Delivery on Flower St Work is now scheduled through March 2021, with backfill material delivery and other pre-restoration work planned for Flower St, between 4th St and 6th St. |
More information about Backfill Material Delivery on Flower St in HTML format |
January 13 |
Southern California Gas Line Installation Utility installation by Southern Califonia Gas Company in downtown LA |
More information about Southern California Gas Line Installation in HTML format |
January 10 |
Street Restoration at 1st St and Alameda St RCC will continue the extended closure of the 1st St and Alameda St intersection for street restoration. A 24/7 closure is anticipated to continue until Monday, August 31, 2020. |
More information about Street Restoration at 1st St and Alameda St in HTML format |
October 04 |
Construction activities on Flower St Construction activities on Flower St in downtown LA |
More information about Construction activities on Flower St in HTML format |
May 01 |
Street Closures and Detours Review the real-time map and longer term street impacts. |
More information about Street Closures and Detours in HTML format |
January 01 |
1번가와 중앙역에서 콘크리트 타설 1번가와 중앙역에서 콘크리트 타설 |
More information about 1번가와 중앙역에서 콘크리트 타설 in HTML format |
January 01 |
1st およびセントラルステーションでのコンクリート打設 1st およびセントラルステーションでのコンクリート打設 |
More information about 1st およびセントラルステーションでのコンクリート打設 in HTML format |
January 01 |
Colocación del concreto en la estación de la 1st y Central Colocación del concreto en la estación de la 1st y Central |
More information about Colocación del concreto en la estación de la 1st y Central in HTML format |
December 05 |
Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021 Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021 |
More information about Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021 in HTML format |
September 14 |
Concrete placement on Flower St Concrete placement for the connection into 7th/Metro Center |
More information about Concrete placement on Flower St in HTML format |
May 23 |
1st and Central Concrete Placement Concrete placement for the Little Tokyo/Arts District station |
More information about 1st and Central Concrete Placement in HTML format |
May 07 |
Concrete Placement at the Historic Broadway Station Concrete placement for the Historic Broadway Station |
More information about Concrete Placement at the Historic Broadway Station in HTML format |
August 04 |
Construction Activities at the 2nd/Hope Station Yard Regional Connector Constructors (RCC) will continue to perform construction activities at the 2nd/Hope Station Yard. Work is anticipated to continue through Summer 2021. |