Skip to Content
Search

Regional Connector Transit Project

Construction Notices

Get construction updates on Twitter

Date Notice Brief Detail

October 18

Geotechnical Instrumentation Installation on Flower St

Geotech install

More information about Geotechnical Instrumentation Installation on Flower St in HTML format

October 06

Cut and Cover preparation: Utility investigation, cap beam and pile installation 5th St to Wilshire Bl

Cut and cover work

More information about Cut and Cover preparation: Utility investigation, cap beam and pile installation 5th St to Wilshire Bl in HTML format

October 04

Geotechnical Instrumentation Installation at 4th and Flower St

Geotechnical Instrumentation Installation

More information about Geotechnical Instrumentation Installation at 4th and Flower St in HTML format

October 02

Utility Work and Pile Installation on westbound Flower St between 6th St and Wilshire Bl

Utility investigation and pile install

More information about Utility Work and Pile Installation on westbound Flower St between 6th St and Wilshire Bl in HTML format

October 02

Utility Investigation on Flower St between 5th St and 6th St

Utility Investigation on Flower St

More information about Utility Investigation on Flower St between 5th St and 6th St in HTML format

September 30

Utility Investigation on 1st St between Alameda and Vignes St

Utility investigation

More information about Utility Investigation on 1st St between Alameda and Vignes St in HTML format

September 28

Sawcutting on Flower St between 5th and 6th St

Sawcutting

More information about Sawcutting on Flower St between 5th and 6th St in HTML format

September 28

Sound Wall Installation on Flower St between 3rd St and 5th St

Sound Wall Installation on Flower St

More information about Sound Wall Installation on Flower St between 3rd St and 5th St in HTML format

September 18

Utility Investigation and Piling at the Southeast Corner of 5th St/Flower St

Utility investigation

More information about Utility Investigation and Piling at the Southeast Corner of 5th St/Flower St in HTML format

September 16

Sound Wall Installation on Flower St East side Pedestrian Sidewalk, south of 4th St

Sound wall install

More information about Sound Wall Installation on Flower St East side Pedestrian Sidewalk, south of 4th St in HTML format

September 15

Crane Transfer and Assembly at Grand Av Arts/Bunker Hill and Historic Broadway Stations

Crane transfer & assembly

More information about Crane Transfer and Assembly at Grand Av Arts/Bunker Hill and Historic Broadway Stations in HTML format

September 15

6th St Weekend Closures for DWP Power and Construction Activities

DWP Power 

More information about 6th St Weekend Closures for DWP Power and Construction Activities in HTML format

September 13

Geotechnical Instrumentation Installation at the Intersection of 4th St/Flower St

Geotech instrument install

More information about Geotechnical Instrumentation Installation at the Intersection of 4th St/Flower St in HTML format

September 12

Sound Wall Maintenance on Flower St East Side Pedestrian Sidewalk

Maintenance

More information about Sound Wall Maintenance on Flower St East Side Pedestrian Sidewalk in HTML format

September 09

Sawcutting at the 6th St/Flower St Intersection

Saw cutting

More information about Sawcutting at the 6th St/Flower St Intersection in HTML format

September 08

Cierre de fin de semana en Flower St. para instalación de plataforma de 5th a 6th St.

Cierre de fin de semana en Flower St

More information about Cierre de fin de semana en Flower St. para instalación de plataforma de 5th a 6th St. in HTML format

September 08

transit5번가와 6번가 사이의 데크 설치를 위한 플라워 스트리트 주말 폐쇄

transit5번가와 6번가 사이의 데크 설치를 위한 플라워 스트리트 주말 폐쇄

More information about transit5번가와 6번가 사이의 데크 설치를 위한 플라워 스트리트 주말 폐쇄 in HTML format

September 08

デッキ設置による5th St~6th St間Flower St週末通行止めのお知らせ

デッキ設置による5th St~6th St間Flower St週末通行止めのお知らせ

More information about デッキ設置による5th St~6th St間Flower St週末通行止めのお知らせ in HTML format

September 08

Flower St Weekend Closures for Deck Installation 5th St to 6th St

Decking on Flower St

More information about Flower St Weekend Closures for Deck Installation 5th St to 6th St in HTML format

September 08

Sound Wall Installation on Flower St Eastside Pedestrian Sidewalk

Sound wall install

More information about Sound Wall Installation on Flower St Eastside Pedestrian Sidewalk in HTML format

September 07

Geotechnical Instrumentation Installation at the Intersection of 5th St/Flower St

Geotech instrument install

More information about Geotechnical Instrumentation Installation at the Intersection of 5th St/Flower St in HTML format

September 05

Sawcutting Activities at the 5th/Flower Intersection

Sawcutting

More information about Sawcutting Activities at the 5th/Flower Intersection in HTML format

August 30

Construction Activities at the 1st/Central & Mangrove Yards

Support of tunneling

More information about Construction Activities at the 1st/Central & Mangrove Yards in HTML format

August 29

Roadway Decking Maintenance on Central Av

Decking maintenance

More information about Roadway Decking Maintenance on Central Av in HTML format

August 17

Sound Wall Installation at Historic Broadway Station Site

Sound wall install

More information about Sound Wall Installation at Historic Broadway Station Site in HTML format

August 16

Geotechnical Instrumentation Installation at the Intersection of 5th/Flower St

Geotech instrument install

More information about Geotechnical Instrumentation Installation at the Intersection of 5th/Flower St in HTML format

August 15

Eastbound directional closure of 1st St, between Hewitt and Vignes St

Power duct bank install

More information about Eastbound directional closure of 1st St, between Hewitt and Vignes St in HTML format

August 14

Power Duct Bank Installation on Flower St. between 5th St. and 6th St.

Duct bank install

More information about Power Duct Bank Installation on Flower St. between 5th St. and 6th St. in HTML format

August 14

Restoration Activities on 1st St sidewalk between Hewitt St and Vignes St

Restoration activities

More information about Restoration Activities on 1st St sidewalk between Hewitt St and Vignes St in HTML format

August 10

Closure of northbound Central Ave at 2nd St

Moving equipment

More information about Closure of northbound Central Ave at 2nd St in HTML format

August 04

Construction Activities at the 2nd/Hope Station Yard

Various activities

More information about Construction Activities at the 2nd/Hope Station Yard in HTML format

August 02

Sidewalk Restoration on eastside sidewalk of Flower St between 5th and 6th St

Sidewalk restoration

More information about Sidewalk Restoration on eastside sidewalk of Flower St between 5th and 6th St in HTML format

July 31

Cap Beam Installation on Flower St, from 5th St to 6th St

Cap beam install

More information about Cap Beam Installation on Flower St, from 5th St to 6th St in HTML format

July 31

Maintenance in advance of tunneling, Central Ave and 2nd St

Equipment maintenance

More information about Maintenance in advance of tunneling, Central Ave and 2nd St in HTML format

July 31

Power Duct Bank Installation on 1st St, between Hewitt and Vignes St

Duct bank install

More information about Power Duct Bank Installation on 1st St, between Hewitt and Vignes St in HTML format

July 29

Hauling of the Tunnel Boring Machine from 4th St/Flower St

Hauling TBM

More information about Hauling of the Tunnel Boring Machine from 4th St/Flower St in HTML format

July 26

Geotechnical Instrumentation Installation on 2nd St

Geotech install

More information about Geotechnical Instrumentation Installation on 2nd St in HTML format

July 17

Geotechnical Instrumentation Installation on Flower St between 5th and 6th St

Geotech install

More information about Geotechnical Instrumentation Installation on Flower St between 5th and 6th St in HTML format

July 15

DWP Power Installation on 6th St between Figueroa St and Flower St

Conduit install

More information about DWP Power Installation on 6th St between Figueroa St and Flower St in HTML format

July 11

Pile Installation at the Historic Broadway Station

Pile installation

More information about Pile Installation at the Historic Broadway Station in HTML format

June 23

Full Weekend Closures for TBM Retrieval at 4th St. and Flower St. Intersection

TBM retrieval

More information about Full Weekend Closures for TBM Retrieval at 4th St. and Flower St. Intersection in HTML format

June 17

Full Weekend Closures for TBM Retrieval at 4th St. and Flower St. Intersection - Traffic control plan implementation

Traffic control implementation

More information about Full Weekend Closures for TBM Retrieval at 4th St. and Flower St. Intersection - Traffic control plan implementation in HTML format

June 16

Utility Investigation on 1st St

Utility investigation

More information about Utility Investigation on 1st St in HTML format

June 15

Storm Drain Installation on 2nd St. between Broadway and Spring St.

Storm drain install

More information about Storm Drain Installation on 2nd St. between Broadway and Spring St. in HTML format

June 13

Paving activities on Flower St between 5th St and 6th St

Paving

More information about Paving activities on Flower St between 5th St and 6th St in HTML format

June 10

Weekend Activities on Flower St. between 5th St. and 6th St.

Utility investigation and pile install

More information about Weekend Activities on Flower St. between 5th St. and 6th St. in HTML format

June 07

Geotechnical Instrumentation Installation on Broadway

Geotech install

More information about Geotechnical Instrumentation Installation on Broadway in HTML format

June 07

Storm Drain Installation at the Historic Broadway Station

Storm drain install

More information about Storm Drain Installation at the Historic Broadway Station in HTML format

June 03

6번가와 I-110 프리웨이 사이를 5개월 동안 폐쇄

6번가와 I-110 프리웨이 사이를 5개월 동안 폐쇄  

More information about 6번가와 I-110 프리웨이 사이를 5개월 동안 폐쇄 in HTML format

June 03

Closure of 6th St at I-110 Freeway

6th St closure

More information about Closure of 6th St at I-110 Freeway in HTML format

June 03

Cierre por 5 meses de 6th St. a la altura de la autopista I-110

Cierre por 5 meses de 6th St. a la altura de la autopista I-110

More information about Cierre por 5 meses de 6th St. a la altura de la autopista I-110 in HTML format

June 03

I-110 FWYで6th St.の5か月間通行止めのお知らせ

I-110 FWYで6th St.の5か月間通行止めのお知らせ

More information about I-110 FWYで6th St.の5か月間通行止めのお知らせ in HTML format

June 02

TBM Maintenance at the Grand Av. Arts/Bunker Hill Station

TBM maintenance

More information about TBM Maintenance at the Grand Av. Arts/Bunker Hill Station in HTML format

June 02

Traffic Implementation for Five Month Closure of 6th St. at I-110 Fwy

Lane reconfiguration

More information about Traffic Implementation for Five Month Closure of 6th St. at I-110 Fwy in HTML format

May 23

Geotechnical Instrumentation Installation along Flower St and 5th St

Geotech install

More information about Geotechnical Instrumentation Installation along Flower St and 5th St in HTML format

May 20

Paving at the Intersection of 6th St. and Flower St.

Paving

More information about Paving at the Intersection of 6th St. and Flower St. in HTML format

May 12

Landscape Maintenance along the Grand Av Arts/Bunker Hill Station

Landscape maintenance

More information about Landscape Maintenance along the Grand Av Arts/Bunker Hill Station in HTML format

May 08

Storm Drain Installation on 2nd St. between Broadway and Spring St.

Storm drain install

More information about Storm Drain Installation on 2nd St. between Broadway and Spring St. in HTML format

May 08

Continuation of Support of Excavation during Steady State

Support of excavation

More information about Continuation of Support of Excavation during Steady State in HTML format

May 08

Excavation Continues on Flower St. between 4th St. and 5th St.

Excavation

More information about Excavation Continues on Flower St. between 4th St. and 5th St. in HTML format

May 05

Weekend Closure for Cut and Cover Activities Continues on Flower St. between 4th St. and 5th St.

Cut and cover

More information about Weekend Closure for Cut and Cover Activities Continues on Flower St. between 4th St. and 5th St. in HTML format

May 05

Last Weekend Closure at 2nd St./Spring St. Intersection & Traffic Reconfiguration

Weekend closure & traffic reconfiguration

More information about Last Weekend Closure at 2nd St./Spring St. Intersection & Traffic Reconfiguration in HTML format

May 05

Último cierre de fin de semana en la intersección de 2nd St. y Spring St., y reconfiguración de tránsito

último cierre de fin de semana 

More information about Último cierre de fin de semana en la intersección de 2nd St. y Spring St., y reconfiguración de tránsito in HTML format

May 01

Geotechnical Instrumentation Installation on Flower St. between 3rd St. and 4th St.

Geotech install

More information about Geotechnical Instrumentation Installation on Flower St. between 3rd St. and 4th St. in HTML format

April 28

Concrete Placement on Flower St. between 4th St. and 5th St.

Concrete pour

More information about Concrete Placement on Flower St. between 4th St. and 5th St. in HTML format

April 26

Geotechnical Instrumentation Installation on 5th St. between Flower & Figueroa St.

Geotech instrument install

More information about Geotechnical Instrumentation Installation on 5th St. between Flower & Figueroa St. in HTML format

April 25

Water Line Tie-in on Flower St. between 5th St. and 6th St.

Waterline tie in

More information about Water Line Tie-in on Flower St. between 5th St. and 6th St. in HTML format

April 22

Geotechnical Instrumentation Installation on Flower St.

Geotech install

More information about Geotechnical Instrumentation Installation on Flower St. in HTML format

April 20

Traffic Management Conduit Installation on Broadway St. between 1st St. & Temple St.

Conduit install

More information about Traffic Management Conduit Installation on Broadway St. between 1st St. & Temple St. in HTML format

April 17

Traffic Management Conduit Installation on Broadway, between 1st and 2nd St.

Conduit installation

More information about Traffic Management Conduit Installation on Broadway, between 1st and 2nd St. in HTML format

April 10

Utility Investigation on the East side of Central Ave. between 1st St. and 2nd St.

Utility investigation

More information about Utility Investigation on the East side of Central Ave. between 1st St. and 2nd St. in HTML format

April 10

Geotechnical Instrumentation Installation on Flower St. between 3rd St. and 4th St

Geotech install

More information about Geotechnical Instrumentation Installation on Flower St. between 3rd St. and 4th St in HTML format

April 10

Construction Activities at the 2nd/Hope Yard

Construction activities

More information about Construction Activities at the 2nd/Hope Yard in HTML format

April 08

Sawcutting on Flower St and Hope St

Sawcutting

More information about Sawcutting on Flower St and Hope St in HTML format

April 07

Asphalt Pavement Repair at 1st St. and Garey St.

Pavement repair

More information about Asphalt Pavement Repair at 1st St. and Garey St. in HTML format

April 07

Geotechnical Instrumentation Installation at 3rd St. and Flower St. Intersection

Geotech instrument install

More information about Geotechnical Instrumentation Installation at 3rd St. and Flower St. Intersection in HTML format

March 28

Geotechnical Instrumentation Installation at 3rd St and Flower St. Intersection

Geotech install

More information about Geotechnical Instrumentation Installation at 3rd St and Flower St. Intersection in HTML format

March 24

Tunnel Mining

Tunnel mining

More information about Tunnel Mining in HTML format

March 20

Historic Broadway Parking Validation Program

Two hour free parking

More information about Historic Broadway Parking Validation Program in HTML format

March 06

Excavation Continues on Flower St. between 4th St. and 5th St.

Excavation

More information about Excavation Continues on Flower St. between 4th St. and 5th St. in HTML format

March 01

Utility Investigation on Flower St, between 5th St & 6th St

Utility investigation

More information about Utility Investigation on Flower St, between 5th St & 6th St in HTML format

February 27

Sound Wall Installation on Spring St.

Building noise barrier

More information about Sound Wall Installation on Spring St. in HTML format

February 20

Power Relocation Activities on Flower St, between 5th St and Wilshire Blvd

Power relocation

More information about Power Relocation Activities on Flower St, between 5th St and Wilshire Blvd in HTML format

February 15

Waterline Relocation on Flower St between 5th St and 6th St

Waterline relocation

More information about Waterline Relocation on Flower St between 5th St and 6th St in HTML format

February 14

Concrete Placement at the 2nd/Hope Station

Concrete slab placement

More information about Concrete Placement at the 2nd/Hope Station in HTML format

February 06

Weekday Excavation on Flower St between 4th St and 5th St

Excavation

More information about Weekday Excavation on Flower St between 4th St and 5th St in HTML format

January 19

Piling activities at the intersection of 5th St and Flower St

Piling activities

More information about Piling activities at the intersection of 5th St and Flower St in HTML format

January 10

Power Relocation Activities on Flower St. between 6th St. and Wilshire Bl.

Power relocation

More information about Power Relocation Activities on Flower St. between 6th St. and Wilshire Bl. in HTML format

January 07

Water Relocation at the 6th St. and Flower St. Intersection

Water relocation

More information about Water Relocation at the 6th St. and Flower St. Intersection in HTML format

December 12

Utility Investigation at 5th St./Flower St. Intersection to 6th St.

Utility investigation

More information about Utility Investigation at 5th St./Flower St. Intersection to 6th St. in HTML format

September 26

Street Closures and Detours

Review the real-time map and longer term street impacts.

More information about Street Closures and Detours in HTML format

June 08

Bus Stop Relocation at 3rd St/Flower St

Beginning Monday, June 8, 2015 the bus stop at the 3rd St/Flower St intersection will be relocated to the south east corner of 3rd St/Hope St.

More information about Bus Stop Relocation at 3rd St/Flower St in HTML format
More information about Bus Stop Relocation at 3rd St/Flower St in PDF format
Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero