Date Notice Brief Detail

February 04

Geotechnical device maintenance on 2nd St, from Main to Spring St

Geotechnical device maintenance on 2nd St, from Main to Spring St, in downtown LA.

More information about Geotechnical device maintenance on 2nd St, from Main to Spring St in HTML format

February 02

Storm Drain Work on 2nd St, between Spring St and Broadway

Storm drain install on 2nd St in downtown LA.

More information about Storm Drain Work on 2nd St, between Spring St and Broadway in HTML format

February 01

Construction Activities at the 1st St/Central Av, 1st St and the Mangrove Yards

Construction activities at the 1st/Central, 1st St, and Mangrove Yards in downtown Los Angeles.

More information about Construction Activities at the 1st St/Central Av, 1st St and the Mangrove Yards in HTML format

January 25

Utility vault installation at 7th/Flower St

Utilty vault installation at Flower St and 7th St in downtown LA

More information about Utility vault installation at 7th/Flower St in HTML format

January 24

Utility Vault Installation Preparation

Utility vault installation preparation on Flower St in downtown LA

More information about Utility Vault Installation Preparation in HTML format

January 19

Deck panel removal for excavation on west side of Flower St

Deck panel removal on Flower St in downtown LA.

More information about Deck panel removal for excavation on west side of Flower St in HTML format

January 18

Utility vault installation on 7th St

Utility vault installation on 7th St in downtown LA

More information about Utility vault installation on 7th St in HTML format

January 18

Geotech device maintenance on 2nd and Spring St

Geotech device maintenance at 2nd and Spring St in downtown LA.

More information about Geotech device maintenance on 2nd and Spring St in HTML format

January 07

Geotech device maintenance on 2nd and Spring St

Geotech device maintenance on 2nd St in downtown Los Angeles.

More information about Geotech device maintenance on 2nd and Spring St in HTML format

January 07

LADWP-Power Vault Inspection on 1st St between Vignes St and Alameda St

LADWP-Power Vault Inspection on 1st St in Little Tokyo

More information about LADWP-Power Vault Inspection on 1st St between Vignes St and Alameda St in HTML format

December 05

Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021

Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021

More information about Bikes prohibited on westbound 1st St, between Vignes and Alameda St, through 2021 in HTML format

November 29

Deck panel removal for excavation on east side of Flower St

Deck panel removal for excavation on Flower St in downtown Los Angeles.

More information about Deck panel removal for excavation on east side of Flower St in HTML format

November 17

Deck Panel Removal and Replacement

Deck panel removal and replacement on Flower St in downtown Los Angeles.

More information about Deck Panel Removal and Replacement in HTML format

November 16

Storm drain inspection at Alameda St

Storm drain inspection at Alameda St in Little Tokyo.

More information about Storm drain inspection at Alameda St in HTML format

November 06

Temporary sidewalk restoration at 6th and Flower St

Sidewalk restoration on Flower St in downtown LA.

More information about Temporary sidewalk restoration at 6th and Flower St in HTML format

November 05

Geotech device maintenance on 2nd St and Spring St

Geotech device maintenance on 2nd and Spring St in downtown LA.

More information about Geotech device maintenance on 2nd St and Spring St in HTML format

November 05

Temporary sidewalk restoration on Flower St

Sidewalk restoration on Flower St in downtown LA.

More information about Temporary sidewalk restoration on Flower St in HTML format

October 29

Traffic Lane Black Stripe Removal

Traffic lane black stripe removal on Flower St, between 4th and 5th St, in downtown LA.

More information about Traffic Lane Black Stripe Removal in HTML format

October 25

Utility investigation for communication line on 1st St

Utility investigation for communication line on 1st St in Little Tokyo. Beginning October 25.

More information about Utility investigation for communication line on 1st St in HTML format

October 22

Installation of geotech device on 2nd St and Spring St

Install of ground monitoring device on 2nd St and Spring St in DTLA

More information about Installation of geotech device on 2nd St and Spring St in HTML format

October 22

Communication Utility Work

Communication utility work on Flower St, in downtown LA. Beginning October 22, 2018.

More information about Communication Utility Work in HTML format

October 11

Installation of ground monitoring device on 2nd St and Spring St

Install of ground monitoring device

More information about Installation of ground monitoring device on 2nd St and Spring St in HTML format

October 01

Utility investigation on Temple St

Utility investigation

More information about Utility investigation on Temple St in HTML format

September 25

Installation of ground monitoring device on 2nd St and Spring St

Geotechnical install

More information about Installation of ground monitoring device on 2nd St and Spring St in HTML format

September 19

Restoration Paving 7th Street

Restoration paving

More information about Restoration Paving 7th Street in HTML format

September 18

Tree Trimming at 2nd St and Main St

Tree trimming

More information about Tree Trimming at 2nd St and Main St in HTML format

September 17

Sidewalk improvements on east side of Flower St

Sidewalk improvements

More information about Sidewalk improvements on east side of Flower St in HTML format

September 15

Utility work at 6th St and Flower St

Utility work

More information about Utility work at 6th St and Flower St in HTML format

September 14

Mobilizing Equipment on Central Av between 1st St and 2nd St

Mobilizing equipment

More information about Mobilizing Equipment on Central Av between 1st St and 2nd St in HTML format

September 14

Concrete placement at Flower St

Concrete placement

More information about Concrete placement at Flower St in HTML format

September 12

Geotechnical Instrumentation Installation on Flower St

Geotech instrument install

More information about Geotechnical Instrumentation Installation on Flower St in HTML format

September 07

Fire suppression system testing at 1st St/Central Av

Fire suppression system testing

More information about Fire suppression system testing at 1st St/Central Av in HTML format

August 27

Train communications line work

Train communication line work

More information about Train communications line work in HTML format

August 23

Sidewalk Repair at 6th St and Figueroa St

Sidewalk repair

More information about Sidewalk Repair at 6th St and Figueroa St in HTML format

August 05

Paving at 4th St and Flower St

Paving

More information about Paving at 4th St and Flower St in HTML format

July 19

Geotechnical Installation on 2nd St

Geotech install

More information about Geotechnical Installation on 2nd St in HTML format

July 06

Weekend Closures of Flower St/6th St for Pile & Deck Installation

Flower St weekend closures

More information about Weekend Closures of Flower St/6th St for Pile & Deck Installation in HTML format

July 02

Utility investigation activities on Flower St and 7th St

Utility investigation

More information about Utility investigation activities on Flower St and 7th St in HTML format

May 23

1st and Central Concrete Placement

Concrete placement

More information about 1st and Central Concrete Placement in HTML format

May 07

Concrete Placement at the Historic Broadway Station

Concrete placement

More information about Concrete Placement at the Historic Broadway Station in HTML format

April 30

Utility investigation activities at 6th/Flower St

Utility investigation

More information about Utility investigation activities at 6th/Flower St in HTML format

February 26

Station Excavation at 1st/Central station site

Station excavation & weekend closures

More information about Station Excavation at 1st/Central station site in HTML format

February 01

Geotechnical Instrumentation Installation on Flower St, from 5th to 6th St

Geotech install

More information about Geotechnical Instrumentation Installation on Flower St, from 5th to 6th St in HTML format

January 01

Regional Connector Public Meetings - 2018

Schedule of pubic meetings

More information about Regional Connector Public Meetings - 2018 in HTML format

November 04

Concrete Placement at the Grand Av Arts/Bunker Hill Station

Concrete pour

More information about Concrete Placement at the Grand Av Arts/Bunker Hill Station in HTML format

August 30

Construction Activities at the 1st/Central & Mangrove Yards

Support of tunneling

More information about Construction Activities at the 1st/Central & Mangrove Yards in HTML format

August 04

Construction Activities at the 2nd/Hope Station Yard

Various activities

More information about Construction Activities at the 2nd/Hope Station Yard in HTML format

May 08

Excavation Continues on Flower St. between 4th St. and 6th St.

Excavation

More information about Excavation Continues on Flower St. between 4th St. and 6th St. in HTML format

September 26

Street Closures and Detours

Review the real-time map and longer term street impacts.

More information about Street Closures and Detours in HTML format

June 08

Bus Stop Relocation at 3rd St/Flower St

Beginning Monday, June 8, 2015 the bus stop at the 3rd St/Flower St intersection will be relocated to the south east corner of 3rd St/Hope St.

More information about Bus Stop Relocation at 3rd St/Flower St in HTML format
More information about Bus Stop Relocation at 3rd St/Flower St in PDF format
Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero