ESOC

Overview

Metro is designing and building a new Emergency Security Operations Center (ESOC) on Metro-owned property in the Arts District. ESOC will be a secured facility for authorized personnel only and not open to the general public. The project is comprised of two phases. Once constructed as part of the first phase, the facility will house the Emergency Operations Center (EOC) and Security Operations Center as a central location for Metro security operations, radio dispatch, and emergency coordination. Metro is planning to integrate Rail and Bus Operations Centers into this facility as part of a future phase 2 to have a consolidated operations center for more effective management of Metro’s expanding transportation network systems.

The project was analyzed for any potential environmental impacts according to CEQA requirements. The Initial Study (IS) findings resulted in a Mitigated Negative Declaration (MND) on December 16, 2015, completing the environmental clearance process.

Highlights

The new ESOC facility will be approximately four stories tall and approximately 80,000 square feet in size with up to 94 employee parking spaces. It is anticipated to be a Leadership in Environmental and Energy Design (LEED)-Gold building, incorporating sustainable design features, where appropriate, to minimize non-renewable energy consumption, reduce waste, and conserve water. The building will be designed to complement the character and identity of the Arts District, as well as anticipate the future bicycle infrastructure and street beautification additions included as part of Metro’s Eastside Access Improvements project. Community outreach has been conducted during the design process to obtain input from the community. A site-specific artwork will be integrated into the project and temporary artwork will be installed on the site fencing during construction.

Schedule

Design and Construction Timeline
Cronograma del diseño y de la construcción
設計と施工のタイムライン

summer 2016–fall 2016
site planning and initial design

del verano de 2016 al otoño de 2016
planificación del sitio y diseño inicial

2016年夏~2016年秋
施設の計画および初期 段階の設計

fall 2016–spring 2017
continued design development

del otoño de 2016 a la primavera de 2017
desarrollo continuo del diseño

2016年秋~2017年春
継続設計開発

2017–2021
final design and construction

de 2017 a 2021
diseño y construcción final

2017年~2021年
最終設計および施工

LA Union Station Area Metro Projects

Map of Arts District project area
LA Union Station Area Metro Projects

languages

Share this page on
Advertisement
Close Search Window

Search metro.net, The Source, and El Pasajero