Situated in downtown Los Angeles and adjacent to Union Station, the Patsaouras Plaza Busway Station project will be a new transit busway station for the Metro Silver Line and other transit buses operating on the El Monte Busway. The design will place the busway south of Patsaouras Transit Plaza, in the median of the El Monte Busway next to US-101. The new busway station will allow buses travelling in both directions to serve Union Station with a minimum delay for passengers traveling to other destinations.

Project Highlights

  • A new pedestrian bridge will allow passengers to walk directly from the Patsaouras Transit Plaza to the new busway station.
  • New lighting and closed circuit TV systems (CCTV) provide commuters with a safer passage through the Union-Patsaouras Plaza.
  • New bus, light rail, and heavy rail connections (including connections to Metro, Metrolink, and Amtrak) will be added to this transportation hub to increase availability and access that will promote stress free, safe, and convenient commuting.

Location :
Patsaouras Plaza at Union Station,
Downtown Los Angeles

Construction Start Date:
Fall 2016

Projected Completion:
Spring 2018


Metro Emergency Security Operations Center

Thanks to those of you who were able to join us for the Community Meeting and Meet-the-Artist on January 18, 2017 at 6:30pm at Southern California Institute of Architecture (SCI-Arc), 350 Merrick St., Los Angeles, CA 90013. Click here for a link to the presentation .

Sign up to receive Metro Emergency Security Operations Center (ESOC) Email

Thanks to those of you who were able to join us for the Community Meeting on June 20, 2016 at 6 pm at Los Angeles Hompa Hongwanji Buddhist Temple, 815 E 1st St, Los Angeles, CA 90012. Click here for a link to the presentation .

We are seeking your input! If you were not able to attend in person and would still like to provide a comment, please contact us:

Contact Us

Phone: (213) 995-3937
Email: ESOC@metro.net
Website: metro.net/capitalprojects Click on ESOC.

Mail: Bronwen Keiner, Senior Community Relations Officer, Metro, One Gateway Plaza, Mail Stop 99-13-1, Los Angeles, CA 90012

Arts District Project Area

Map of Arts District project area
Arts District Project Area Map

languages


Division 20 Portal Widening & Turnback Facility

Metro is moving forward with the planning of a project in Metro’s Division 20 Rail Yard Facility near the Arts District, and we want to hear from you!

Thanks to those of you who were able to join us for the Community Meeting on December 21, 2016at 6:30pm at Southern California Institute of Architecture (SCI-Arc), Room 160, 960 E. 3 rd St., Los Angeles, CA 90013. We appreciated your taking the time to learn about the proposed improvements and share your input. Click here for a link to the presentation .

Metro accepted public comments on the environmental document for the Division 20 Portal Widening & Turnback Facility Project – Draft Initial Study/Mitigated Negative Declaration (IS/MND) – from December 19, 2016, through February 13, 2017. The Final IS/MND is available for public review at the Metro Transportation Library at One Gateway Plaza, 15 th Floor, Los Angeles, CA 90012, and online here at www.metro.net/capitalprojects under “Reports and Info”.

In addition, meetings to consider the approval of the proposed project, Final IS/MND and mitigation measures will be held as follows:

Metro Board’s Construction Committee
Thursday, February 16, 2017, 9:00 a.m.

Metro’s Board of Directors
Thursday, February 23, 2017, 9:00 a.m.

Both meetings will be held in the Metro Board Room at the Metro Headquarters Building adjacent to Union Station, located at One Gateway Plaza, 3 rd Floor, Los Angeles, CA 90012.

Project Summary

In order to accommodate increased service levels on the Metro Red/Purple Lines, Metro is planning critical facility improvements including a widening of the heavy rail tunnel south of the US-101 freeway (Portal Widening) and a new turnback facility (Turnback Facility) in the Division 20 rail yard. With these improvements, new tracks and switches will allow trains to turn around more quickly at Union Station.

Presently, the Metro Red and Purple Lines carry over 140,000 passengers each day and ridership is expected to grow by 49,000 when the Metro Purple Line is extended to the VA West Los Angeles Medical Center (as described in the Final Environmental Impact Statement for the Metro Purple Line Extension). Many Red/Purple Line trains switch tracks before entering Union Station, which is the reason that some trains operate more slowly coming in and out of the station. This project will allow switching to take place after riders get on or off trains. It will also help to ensure safety and reliability on the system, a sufficient capacity to serve future passengers and a more effective operation of Metro’s expanding subway network.

For more information, please contact Bronwen Keiner at keinerb@metro.net or 213-922-4465.

Sign up to receive Division 20 Projects Email .

Arts District Project Area

Map of Arts District project area
Arts District Project Area Map


Throughout the construction process, Metro places the highest priority on the safety of our workers and the community.  During Metro's efforts to maintain its assets in good working order, we believe in taking a proactive approach to promote safe behavior near construction sites and increase safety awareness for all commuters, patrons and stakeholders in the construction zone areas.

Construction zones can be very dangerous, so remember to always stay safe when you’re around them. Here are ten simple safety rules to help you stay safe:

  • Avoid going near a construction zone whenever possible. Heavy machinery and debris can be hazardous.
  • Do not walk, run, ride or play in a construction area or around construction equipment, dirt piles and work areas.
  • Always walk on the sidewalk or designated walkway. Watch for sidewalk closure signs and remain alert to posted notices of temporary walkways.
  • To avoid distraction, do not use cell phones, headphones, video games or other hand held devices in construction zones. Staying alert to your surroundings reduces the likelihood of an incident.
  • Stop, look and listen for construction vehicles like bulldozers and dump trucks, as dust can impede your vision, and always be prepared for sudden stops and wide turns.
  • See and be seen. Cross only at intersections and make eye contact with drivers and construction vehicles.
  • Slow down and follow signs that tell you where to walk, skateboard or bicycle.
  • Be aware of your surroundings and falling objects in construction zones, even if they are not directly overhead. Wind can blow them in your direction.
  • Respect the construction, signage and any instructions by those working on the project.
  • Obey all posted reduced speed limits in the area.
  • Stay outside orange cones, construction fences and chain link fences.

Construction Notices

Start Date Notice Brief More Info
01/03/2017 Patsaouras Bus Plaza Station Notice - Vignes St Ramps
Area: Patsaouras Bus Plaza Station Notice - Vignes St Ramps

NORTHBOUND US 101 AT VIGNES ST. ON/OFF-RAMP FOUR MONTH CLOSURE 

The northbound US 101 Vignes St on/off-ramps will close for approximately four months, beginning Tuesday, January 3, 2017. This long term ramp closure is required as construction crews perform project related work at this location.

More information about Patsaouras Bus Plaza Station Notice - Vignes St Ramps in HTML format
More information about Patsaouras Bus Plaza Station Notice - Vignes St Ramps in PDF format
12/27/2016 I-10 Busway/HOT (ExpressLanes) Lane Closures
Area: Route I-10 between Alameda Street and Route I-710.

PATSAOURAS PLAZA BUS STATION PROJECT - The I-10 Busway/HOT (ExpressLanes) on Route I-10, between Alameda Street and Route I-710, will experience intermittent lane closures in both eastbound and westbound directions, December 27, 2016, through January 6, 2017, between the hours of 10:00pm and 5:00am, as construction crews perform related project work.

Our goal throughout this process is to keep the public aware of possible construction impacts including delays, detours, lane closures & potential noise. Having advance notice of these events will allow local residents & business to prepare accordingly.

More information about I-10 Busway/HOT (ExpressLanes) Lane Closures in HTML format
More information about I-10 Busway/HOT (ExpressLanes) Lane Closures in PDF format
11/10/2016 UPDATE: I-10 Busway/HOT (ExpressLanes) Late Night Lane Closures, CANCELLED thru November 10
Area: Route I-10 between Alameda Street and Route I-710.

UPDATE - PATSAOURAS BUS PLAZA STATION PROJECT

The previously scheduled I-10 Busway/HOT (ExpressLanes) late night lane closures have been CANCELLED for the remainder of the week, through November 10, 2016. Metro apologizes for any inconvenience during this period and appreciates your understanding and cooperation.

More information about UPDATE: I-10 Busway/HOT (ExpressLanes) Late Night Lane Closures, CANCELLED thru November 10 in HTML format
More information about UPDATE: I-10 Busway/HOT (ExpressLanes) Late Night Lane Closures, CANCELLED thru November 10 in PDF format
11/01/2016 PERSHING SQUARE STATION, 5th ST ENTRANCE ESCALATOR UNIT REPLACEMENT AND TESTING
Area: Metro Red Line Pershing Square Station, 5th St. entrance (5th & Hill Street)

Replacement of the project’s first escalator will be completed and opened to public at the Pershing Square 5th St. entrance on Tuesday, November 1. The newly constructed escalator unit requires a period of testing and will be operated intermittently in both the up and down direction for a period of one week. During this one week period, the existing “up” escalator will remain operational. Upon completion of testing, the new escalator will be placed in service in the “up” direction and the 2nd escalator will be closed for a period of 4 months for replacement.

More information about PERSHING SQUARE STATION, 5th ST ENTRANCE ESCALATOR UNIT REPLACEMENT AND TESTING in HTML format
10/31/2016 Patsaouras Plaza Bus Station Construction Notice
Area: I-101 Vignes St. on/off-ramps

VIGNES ST. NB 101 ON/OFF-RAMP LATE WEEKNIGHT CLOSURE – The I-101 Vignes St. on/off-ramps, will be closed late weeknights, October 31 through November 10, 2016, between the hours of 10:00pm and 5:00am, as construction crews perform project related work.

More information about Patsaouras Plaza Bus Station Construction Notice in HTML format
More information about Patsaouras Plaza Bus Station Construction Notice in PDF format
10/31/2016 I-10 Busway/HOT (ExpressLanes) Lane Closures, October 31 thru November 4, 10pm-5am, Late Night Only
Area: Between Alameda Street and Route I-710

PATSAOURAS PLAZA BUS STATION PROJECT - The I-10 Busway/HOT (ExpressLanes) on Route I-10, between Alameda Street and Route I-710, will experience intermittent lane closures in both eastbound and westbound directions, October 31, 2016, through November 4, 2016, between the hours of 10:00pm and 5:00am.

More information about I-10 Busway/HOT (ExpressLanes) Lane Closures, October 31 thru November 4, 10pm-5am, Late Night Only in HTML format
More information about I-10 Busway/HOT (ExpressLanes) Lane Closures, October 31 thru November 4, 10pm-5am, Late Night Only in PDF format
08/27/2016 Vignes St. & NB I-101 On/Off-ramp Weekend Closure, Saturday & Sunday, August 27-28
Area: Vignes St. between Ramirez St. and I-101

VIGNES ST & NB I-101 ON/OFF-RAMP WEEKEND CLOSURE - Vignes St. between Ramirez St. and I-101, including the NB I-101 on/off-ramps, will be closed Saturday & Sunday, August 27-28, 2016, between the hours of 7:00am and 5:00pm, as construction crews perform project related work.

More information about Vignes St. & NB I-101 On/Off-ramp Weekend Closure, Saturday & Sunday, August 27-28 in HTML format
More information about Vignes St. & NB I-101 On/Off-ramp Weekend Closure, Saturday & Sunday, August 27-28 in PDF format
04/01/2016 Metro Red Line Pershing Square Escalator Replacement Project
Area: Pershing Square Station

One escalator and a portion of the stairs at the 5th Street entrance will be closed June, 2016 through February, 2017.

The partial entrance closures will occur in two phases:

Phase 1:
The “down” escalator and one half of the stairs will close June, 2016 and reopen October, 2016.

Phase 2:
The “up” escalator and the other half of the stairs will close October, 2016 and reopen February, 2017.

More information about Metro Red Line Pershing Square Escalator Replacement Project in HTML format
More information about Metro Red Line Pershing Square Escalator Replacement Project in PDF format