LA Metro

Fares
Regular Fare
$1.75
one-way on bus or rail
K-12 Student Fare
$1.00
one-way on bus or rail
Senior / Disabled Fare
$0.75 / $0.35
one-way on bus or rail
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

  • This event has passed.

Utility Investigation Work

October 18 @ 9:00 am - November 23 @ 3:30 pm

Summary

Metro’s contractors will perform utility investigation work as part of the Eastside Access Improvements Project.

 

Noteworthy

  • Parking will be limited during construction.
  • The construction activities include saw cutting, excavation and backfilling.
  • Thru traffic maintained.
  • Access to pedestrians will be maintained outside of the work area. Construction equipment will be staged and demobilized from the site daily.

 

Essentials

The Eastside Access Improvements Project brings a wide range of improvements that safeguard pedestrian and cyclists’ movements from transit to and through Little Tokyo and the Arts District.

Improvements include various streetscape elements such as:

  • New and Improved Lighting
  • Access Ramps
  • Tree Planting
  • Kiosks/Wayfinding Signs
  • Defined Pedestrian/Bicycle Pathways and More

 

What to Expect

What: Utility Investigation Work

Where: 

  • Vignes St: Between 1st St / 2nd St
  • 2nd St: Between Vignes St / Santa Fe Av
  • Santa Fe Av: 2nd / 4th Av

When: Approximately two (2) week work duration per location.

Hours of Construction: Monday-Friday,  9am to 3:30pm

Construction is a dynamic process and information is subject to change without notice. For questions or complaints, contact our project hotline at 213.922.1111 or email centrallaprojects@metro.net.

Details

Start:
October 18 @ 9:00 am
End:
November 23 @ 3:30 pm
Event Category: