Utility Investigation at Flower St and 12th St

August 13 @ 9:00 pm - September 5 @ 6:00 am

|Recurring Event (See all)

One event on August 10, 2021 at 9:00 pm

One event on August 11, 2021 at 9:00 pm

One event on August 12, 2021 at 9:00 pm

One event on August 13, 2021 at 9:00 pm

One event on August 13, 2021 at 9:00 pm

Summary

Regional Connector Constructors (RCC) will continue utility investigation and cable pulling at a manhole at the Flower St and 12th St intersection. 

Work is anticipated to continue Wednesday, August 18, 2021, and continue for three weeks. Anticipated work hours are 9 pm to 6 am, Monday through Saturday, Sundays as needed.

 Essentials

  • Activities include traffic control setup, equipment mobilization, cable pulling and inspection of conduits.
  • Crosswalks near the intersection will be maintained. Pedestrian access will be maintained outside of the work area.
  • Access to businesses and driveways will be maintained during work hours. 

  What to Expect

  • Thru traffic will be maintained on southbound Flower St.
  • A lane reduction will be in place on Flower St between 11th St and 12th St.
  • Left turns from Flower St to 12th St will be restricted during work hours. 

  Noteworthy

  • This work is being coordinated with other activities in the area to minimize impacts to the community.