Westbound 1st St, between Vignes and Alameda St: Bikes prohibited

Summary Due to increasing construction activities for Metro’s Regional Connector Transit Project—including excavation of the 1st St Portal and future removal of the Gold Line tracks across 1st St—westbound 1st St is closed at Vignes St to all bicyclists through the duration of construction. Detour A bike detour is in place on westbound 1st St […]

Recurring

PLE1: Southwest Fairfax Ave. and Wilshire Blvd. Appendage Work Zone

Summary Through April 15, 2022, Wilshire Blvd. between San Diego Way and Spaulding Ave. will be reduced to two lanes in each direction. Fairfax Ave. will see no traffic impacts; however, a K-Rail work zone will be implemented on the southwest corner of Wilshire and Fairfax (shown on the map below.) This traffic control supports appendage construction immediately adjacent to the Wilshire/Fairfax Station.  Essentials WHEN August 8, 24 hours per […]

Little Tokyo/Arts District Station Closure

Summary Regional Connector Constructors will permanently close the Little Tokyo/Arts District Station to build the underground tunnel box for the L Line (Gold) along Alameda St, between 1st St and the 101 Santa Ana Freeway. Lane reductions are expected on this stretch of Alameda St to allow for the safe demolition of the station and […]

Parking Shuttle Service for West LA VA Hospital Campus

Parking Shuttle Service is now available for hospital staff and guests of the West LA VA Hospital campus. The shuttle service, which is free to staff and guests, will operate while construction work is underway in several parking structures and lots on the hospital campus. When: Fall 2020 through Fall 2023 Hours:  Monday through Friday; 24 […]

La Cienega Appendage Structures – Wilshire/La Cienega

Summary Beginning in March 2021, work activities at the Wilshire/La Cienega Station will transition to the construction of appendage structures adjacent to the underground station box. These structures house vital systems for the future Wilshire/La Cienega Station, including entrance and exit structures, emergency exits, ventilation rooms, and utility rooms. This work will require various intermittent […]

Westbound 1st St Directional Closure

Summary Regional Connector Constructors (RCC) will implement a directional closure of westbound (WB) 1st St between Vignes St and Alameda St. The 24/7 directional closure is anticipated to be in place until Spring 2022.  This directional closure will allow for the removal of L Line (Gold) tracks, tie-in to the new system, and street restoration. […]

Appendage Construction – North La Brea Yard – Phase 1.1

Summary  Beginning Monday, August 9, and continuing for approximately seven months, work within the North La Brea Yard will transition to appendage construction for the La Brea Station.  When  Monday, August 9, for approximately 7 months.  Construction activity will occur between 7am and 10pm; clean up activities may take place between 10pm and 12am.  Where  Wilshire Blvd. and La Brea Ave.  Traffic Control  Wilshire Blvd. between Orange Dr. and […]

Wilshire/Plymouth K-Rail Work Zone

Summary  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work in the tunnel alignment underneath Wilshire Blvd.  Where  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction.  […]

Wilshire/Rimpau K-Rail Work Zone Installation

Wilshire/Rimpau K-Rail Work Zone Installation Summary  Wilshire Blvd. between Rossmore Ave. and June St. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle […]

G Line (Orange) Pilot Gate Installation and Testing

Summary Metro’s contractor will install temporary pilot gates at the Hayvenhurst pedestrian intersection at the Metro G Line (Orange) busway to test and verify the reliable activation and proper operation […]

Sepulveda Transit Corridor Project Public Scoping Comment Period

Metro is beginning the environmental review phase to evaluate the proposed Sepulveda Transit Corridor Project, which looks to provide a high-quality transit service between the Valley and the Westside. As part of the project’s environmental process, a formal public comment period will be initiated on Tuesday, November 30, 2021 and will run through February 11, 2022. During this period, we encourage you […]

PLE1: Wilshire/La Cienega Station Construction Activities

City of Beverly Hills – Wilshire/La Cienega Monthly Look-Ahead: December 2021     This monthly notification is an outline of construction activities for the month of December 2021, pending City of Beverly Hills approval. Additional notices detailing these activities will be sent by email through the Purple Line Extension, Section 1 database. To be added to the Purple (D) Line stakeholder […]

Recurring

PLE2: Century City/Constellation Station Monthly Lookahead

Century ­­City – Constellation Station Monthly Look-Ahead: December 2021   This monthly notification is an outline of construction activities in Century City for the month of December 2021. All work has received necessary permits and approvals or is pending approval. Dates are subject to change. Additional notices detailing these activities are sent by email through […]

PLE2: Wilshire/Rodeo: Monthly Lookahead

Beverly Hills – Wilshire/Rodeo Monthly Look Ahead: December 2021   This monthly notification is an outline of construction activities for the month of December 2021. Additional notices detailing these activities will be sent by Metro’s project team. To be added to the Purple (D) Line stakeholder list for weekly updates, please email us at purplelineext@metro.net. Please […]

Westwood Blvd Utility and Pile Installation

Utility sewer line work on Westwood Blvd will continue on December 2. Pile installation on Westwood Blvd is anticipated to start on December 20.   The piles support the underground walls for the future Westwood/UCLA Station. The street […]

Ongoing
Recurring

Civil improvements & material delivery on Flower St

Summary Regional Connector Constructors (RCC) will continue pre-restoration work and material delivery planned for Flower St, between 3rd St and Wilshire Bl.  RCC will continue civil improvements, sidewalk removal and restoration at the Flower St intersections on 3rd St and 4th St. RCC will also begin sidewalk restoration on Flower St between 4th St and […]

Recurring

PLE3: West LA VA Hospital Campus Worksite Activities

West LA VA Hospital Campus Worksite Activities  Summary  Metro contractors will continue worksite preparation for the future Westwood/VA Hospital Station. Work includes well monitoring, instrumentation, tree relocation, utility relocation (storm drain, gas line and sewer capping), flagpole removal and storage, hauling of spoil materials, construction wall installation and other improvement activities to create the staging […]

Recurring

G Line (Orange) Advanced Utility Relocation

Summary On behalf of Metro’s G Line (Orange) BRT Improvements Project, the Los Angeles Department of Water and Power (LADWP) and Charter Spectrum will relocate their respective utility lines as […]

Piling on Wilshire Blvd between Gayley Ave and Veteran Ave

Summary Pile Installation and foundation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]

Recurring

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Summary  Piling will continue on the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers […]

Intermittent Lane and Sidewalk Closures at S. Reeves Dr.

Summary The design-build contractor will implement an intermittent lane and sidewalk closure on S. Reeves Dr. at Wilshire Blvd. to accommodate the delivery of gravel, rebar, and concrete underneath the […]

Featured Featured

Metro Budget Development Comment Box

Help us shape our budget. Tell us your Metro priorities for Fiscal Year 2023.   Metro’s Fiscal Year 2022 budget focuses on restoring service to pre-pandemic levels. We’re making progress in creating more transportation options […]

Recurring

Construction Activity On or Near 1st St Bridge

Summary Workers will continue modifying the 1st Street Bridge at multiple locations through January 4, 2022. Construction will strengthen the bridge’s structure and allow expansion of rail tracks that run […]

Recurring

Center Street Sidewalk and North Yard Work

Summary Workers demolished the east sidewalk and fence along the Division 20 Rail Yard (north of the 1st Street Bridge) in June 2021. A permanent fence is being installed and […]

CLAX: Live Train Testing

Summary As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will continue working on live train testing of train control and communication systems. Essentials WHAT: Live Train Testing […]

Concrete Placement

Summary  Little Tokyo Concrete Placement Regional Connector Constructors (RCC) continue placing concrete within the future Little Tokyo/Arts District Station, 1st St Portal (between Hewitt St and Alameda St), Mangrove Yard (Temple St and Alameda St).   Anticipated work hours, […]

Featured Featured Recurring

Construction Site Preparation

Summary  As part of the I-5 North County Enhancements Project, Metro’s contractor OHLA-USA, will be working on construction site preparation along I-5 from the SR-14 interchange to Lyons Av / […]

Work at Stations

Summary  Regional Connector Constructors (RCC) will continue to perform construction activities that will continue through 2022 at the following locations:   Future Little Tokyo/Arts District Station  1st St Portal construction (between Hewitt St and Alameda St)  Mangrove yard […]

LIFE Program Sign-up Event at Pomona Station

Pomona Station 100 W Commercial St, Los Angeles

Join us to sign up and tap into savings. We’ve made it easier to participate in Metro’s LIFE Program, which offers deep discounts for low-income riders. Sign up now and […]