Little Tokyo/Arts District Station Closure

Summary Regional Connector Constructors will permanently close the Little Tokyo/Arts District Station to build the underground tunnel box for the L Line (Gold) along Alameda St, between 1st St and […]

La Cienega Appendage Structures – Wilshire/La Cienega

Summary Beginning in March 2021, work activities at the Wilshire/La Cienega Station will transition to the construction of appendage structures adjacent to the underground station box. These structures house vital […]

Westbound 1st St Directional Closure

Regional Connector Constructors (RCC) will implement a directional closure of westbound (WB) 1st St between Vignes St and Alameda St. The 24/7 directional closure is anticipated to be in place […]

Appendage Construction – North La Brea Yard – Phase 1.1

Summary  Beginning Monday, August 9, and continuing for approximately seven months, work within the North La Brea Yard will transition to appendage construction for the La Brea Station.  When  Monday, August 9, for approximately 7 […]

Ongoing
Recurring

Center Street Sidewalk and North Yard Work

Summary On Saturday, January 29, 2022, workers will remove the K-Rail concrete barriers on the east side of Center St. to allow for utility and street restoration. This weekend work […]

Intermittent Lane and Sidewalk Closures at S. Reeves Dr.

Summary The design-build contractor will implement an intermittent lane and sidewalk closure on S. Reeves Dr. at Wilshire Blvd. to accommodate the delivery of gravel, rebar, and concrete underneath the […]

Featured Featured

Metro Budget Development Comment Box

Help us shape our budget. Tell us your Metro priorities for Fiscal Year 2023.   Metro’s Fiscal Year 2022 budget focuses on restoring service to pre-pandemic levels. We’re making progress in creating more transportation options […]

CLAX: Live Train Testing

Summary As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will continue working on live train testing of train control and communication systems. Essentials WHAT: Live Train Testing […]

Work at Stations

Summary  Regional Connector Constructors (RCC) will continue to perform construction activities that will continue through 2022 at the following locations:   Future Little Tokyo/Arts District Station  1st St Portal construction (between Hewitt St and Alameda St)  Mangrove yard […]

Recurring

Flower St: Sidewalk Installation

Regional Connector Constructors (RCC) will continue material delivery planned for Flower St, between 3rd St and Wilshire Bl. RCC will continue replacing or installing sidewalks at Flower St and 3rd St, 4th St, 5th St, and 6th Streets.   RCC […]

Regional Connector Project Wide: Concrete Placement

Little Tokyo Concrete Placement  Regional Connector Constructors (RCC) continue placing concrete within the future Little Tokyo/Arts District Station, 1st St Portal (between Hewitt St and Alameda St), Mangrove Yard (Temple St and Alameda St).    Anticipated work hours, weather permitting, are 4 am to 6 pm, Monday through Friday and 8 am to 3 pm on […]

Construction Activity On or Near 1st St Bridge

Summary Workers will continue modifying the 1st Street Bridge at multiple locations through April 30, 2022. Construction will strengthen the bridge’s structure and increase the number of rail tracks that run under the bridge. Noteworthy This work requires pickup trucks, air compressors, forklifts, concrete trucks, and other equipment that may cause intermittent noise.   Essentials […]