Westbound 1st St, between Vignes and Alameda St: Bikes prohibited

Summary Due to increasing construction activities for Metro’s Regional Connector Transit Project—including excavation of the 1st St Portal and future removal of the Gold Line tracks across 1st St—westbound 1st St is closed at Vignes St to all bicyclists through the duration of construction. Detour A bike detour is in place on westbound 1st St […]

Little Tokyo/Arts District Station Closure

Summary Regional Connector Constructors will permanently close the Little Tokyo/Arts District Station to build the underground tunnel box for the L Line (Gold) along Alameda St, between 1st St and the 101 Santa Ana Freeway. Lane reductions are expected on this stretch of Alameda St to allow for the safe demolition of the station and […]

Parking Shuttle Service for West LA VA Hospital Campus

Parking Shuttle Service is now available for hospital staff and guests of the West LA VA Hospital campus. The shuttle service, which is free to staff and guests, will operate while construction work is underway in several parking structures and lots on the hospital campus. When: Fall 2020 through Fall 2023 Hours:  Monday through Friday; 24 […]

La Cienega Appendage Structures – Wilshire/La Cienega

Summary Beginning in March 2021, work activities at the Wilshire/La Cienega Station will transition to the construction of appendage structures adjacent to the underground station box. These structures house vital systems for the future Wilshire/La Cienega Station, including entrance and exit structures, emergency exits, ventilation rooms, and utility rooms. This work will require various intermittent […]

Westbound 1st St Directional Closure

Summary Regional Connector Constructors (RCC) will implement a directional closure of westbound (WB) 1st St between Vignes St and Alameda St. The 24/7 directional closure is anticipated to begin on Saturday, September 25, 2021, at 5 am and continue for approximately seven months. This directional closure will allow for the removal of L Line (Gold) […]

Appendage Construction – North La Brea Yard – Phase 1.1

Summary  Beginning Monday, August 9, and continuing for approximately seven months, work within the North La Brea Yard will transition to appendage construction for the La Brea Station.  When  Monday, August 9, for approximately 7 months.  Construction activity will occur between 7am and 10pm; clean up activities may take place between 10pm and 12am.  Where  Wilshire Blvd. and La Brea Ave.  Traffic Control  Wilshire Blvd. between Orange Dr. and […]

Wilshire/Plymouth K-Rail Work Zone

Summary  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work in the tunnel alignment underneath Wilshire Blvd.  Where  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction.  […]

Wilshire/Rimpau K-Rail Work Zone Installation

Wilshire/Rimpau K-Rail Work Zone Installation Summary  Wilshire Blvd. between Rossmore Ave. and June St. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work in the tunnel alignment underneath Wilshire Blvd.  Where  Wilshire Blvd. between Murifield Rd. and June St. is reduced to two lanes […]

G Line (Orange) Pilot Gate Installation and Testing

Summary Metro’s contractor will install temporary pilot gates at the Hayvenhurst pedestrian intersection at the Metro G Line (Orange) busway to test and verify the reliable activation and proper operation of pedestrian gates for the G Line (Orange) Bus Rapid Transit (BRT) Improvements Project.  The Hayvenhurst pedestrian crossing will be closed due to construction and […]

PLE1: Wilshire/La Cienega Station Construction Activities

This monthly notification is an outline of construction activities for the month of October 2021, pending City of Beverly Hills approval. Additional notices detailing these activities will be sent by email through the

Recurring

PLE2: Century City/Constellation Station Monthly Lookahead

Century City – Constellation Station Monthly Look-Ahead: October 2021  This monthly notification is an outline of construction activities in Century City for the month of October 2021.  All work has received necessary permits and approvals or is pending approval. Dates are subject to change. Additional

PLE2: Wilshire/Rodeo: Monthly Lookahead

This monthly notification is an outline of construction activities for the month of October 2021. Additional notices detailing these activities will be sent by Metro’s project team. To be added to the Purple (D)

Construction Activities for Section 3 of the Purple (D) Line

Construction Activities for Section 3 of the Purple (D) Line Please see below for a summary of construction activities taking place along the project's alignment in Section 3, including the Westwood/UCLA Station and Westwood/VA Hospital Station. This information is updated weekly.  Westwood/UCLA Station Geotech Instrumentation with Wilshire Ln. Closures and I-405 Ramp Closures | Learn More Piling in UCLA Lot 36 | Learn More 🔆Piling on […]

Ongoing
Recurring

2nd/Hope Station Yard Activities

Summary: Regional Connector Constructors (RCC) will continue to perform construction activities at the 2nd/Hope Station Yard. Work is anticipated to continue through 2021. Work hours, weather permitting, are 6am to 9pm, Monday through Friday, and 5am to 6pm on Saturdays and Sundays as needed.  Essentials: Activities include: installing HDPE waterproofing, rebar installation, plumbing work, electrical conduit […]

1st and Central Concrete Placement

Summary Regional Connector Constructors (RCC) will be placing concrete within the future Little Tokyo/Arts District Station. Anticipated work hours, weather permitting, are 4 am to 6 pm, Monday through Friday and 8 am to 3 pm on Saturdays. These are the upcoming dates: Friday, October 15, 2021  Monday, October 18, 2021 Tuesday, October 19, 2021  Wednesday, October 20, […]

Historic Broadway Station Concrete Placement

Summary  Regional Connector Constructors (RCC) will begin placing concrete slabs within the Historic Broadway Station. Anticipated work hours, weather permitting, are 7 am to 12 am, on the following days:  Friday, October 15, 2021  Monday, October 18, 2021  Tuesday, October 19, 2021  Wednesday, October 20, 2021 Thursday, October 21, 2021  Wednesday, October 27, 2021  Essentials  Activities include concrete delivery, […]

Recurring

1st St/Central Av, 1st St and the Mangrove Yards Construction Activities

Summary Regional Connector Constructors (RCC) will continue to perform construction activities at the future Little Tokyo/Arts District Station, 1st St Portal construction (between Hewitt and Alameda), and the Mangrove yard (1st/Temple St) to support ongoing construction and tunneling operations. Work is anticipated to continue through 2022. Anticipated work hours, weather permitting, are from 4 am […]

Recurring

Historic Broadway Station Construction Activities

Summary Regional Connector Constructors (RCC) will continue to perform construction activities at the future Historic Broadway Station. Work is anticipated to continue through 2022. Anticipated work hours, weather permitting, are from 4 am to 11 pm, Monday through Saturday. Sunday work will be scheduled as needed. Essentials Activities include excavation, hauling out spoils, installation of […]

Recurring

Pre-restoration Work and Backfill Material Delivery on Flower St

Summary Regional Connector Constructors (RCC) will continue pre-restoration work and material delivery planned for Flower St, between 3rd St and Wilshire Bl.   Work hours, weather permitting, are 6 am to 3:30 pm, Monday through Friday. Saturday from 6 am to 6 pm. This notice will continue to be updated with additional pre-restoration activities as necessary. […]

Grand Av Arts/Bunker Hill Station Concrete Placement

Summary Regional Connector Constructors (RCC) will place concrete slabs at the Grand Av Arts/Bunker Hill Station to build the station’s concourse level, walls, and sub-floors. This two-year process will advance and be scheduled intermittently with the installation of rebar, utilities, and waterproofing to support the new station. Work activities are anticipated to continue intermittently on […]

Implementation of Work Zone in Wilshire and La Brea Intersection

Summary  On Saturday, August 7, from 6am to 9pm, lane reductions will be placed near the Wilshire Blvd. and La Brea Ave. intersection. This traffic control will support creation of a work zone on the northwest corner of Wilshire Blvd. and La Brea Ave. This work will continue through fall 2021. When  Saturday, August 7, from 6am to 9pm  Where  Wilshire Blvd. and La Brea […]

Recurring

PLE3: West LA VA Hospital Campus Worksite Activities

West LA VA Hospital Campus Worksite Activities  Summary  Metro contractors will continue worksite preparation for the future Westwood/VA Hospital Station. Work includes well monitoring, instrumentation, tree relocation, utility relocation (storm drain, gas line and sewer capping), flagpole removal and storage, hauling of spoil materials, construction wall installation and other improvement activities to create the staging […]

Piling in UCLA Lot 36

Summary  Metro contractors began pile installation in UCLA Lot 36 on Monday, August 23. The piles support the walls underground for the future Westwood/UCLA Station. Piling will continue in stages on Wilshire Blvd between Westwood Blvd and Veteran Ave. Construction notices will be updated online each week.  When   Date: August 23 to October 29 Work hours: 7am to 9pm for drilling activities, 9pm […]

Installation of new rail

Summary  Workers will install a new contact rail and rail ties, install new duct banks, and make other necessary upgrades to the yard, near the 6th Street Bridge. The purpose of this work is to electrify the existing non-powered tail track to allow for a faster train turnaround. The work will be completed in the Metro Division […]

CLAX: Left Turn Photo Enforcement: Crenshaw Bl between 59th St and 48st St

SUMMARY As part of the Crenshaw/LAX Transit Project, Metro has installed cameras at the at-grade train crossings along Crenshaw Bl between 59th and 48th St. and will activate its Photos Enforcement Program on Friday, October 1, 2021. The enforcement program is aimed at mitigating potential train versus vehicle collisions and improving vehicular and pedestrian safety […]

Crack and Spall Repairs under the First Street Bridge

Summary Repair of 1st Street Bridge will continue in the Division 20 South Yard and then proceed to the bridge’s east side in Boyle Heights. Noteworthy Please note intermittent noise may occur during this work. Notification of future work requiring a closure of Myers St. in Boyle Heights will be sent.  Essentials The Division 20 […]

Geotechnical Equipment Removal

Summary Regional Connector Constructors (RCC) will continue the removal of geotechnical instrumentation equipment.  Work is anticipated to begin Thursday, September 23, 2021, and continue for approximately four weeks. Work hours are 9 am to 3:30 pm, Monday through Friday, weather permitting. Lane reductions will be in place during work hours at the following locations: On […]

Piling on Wilshire Blvd between Gayley Ave and Veteran Ave

Summary Piling will continue on the north side of Wilshire Blvd between Gayley Ave and Veteran Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will […]

Recurring

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Summary  Piling will continue on the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on Wilshire Blvd to protect the public outside of the work zones. Piling work will be completed in stages, and notices will be updated online each week.  When  […]

South Sycamore Ave. Closure at Wilshire Blvd.

Summary  Beginning Saturday, September 25, 2021, and continuing through Monday, April 4, 2022, Wilshire Blvd. between Detroit St. and Highland Ave. will be reduced to two lanes in each direction. Sycamore Ave. immediately south of Wilshire Blvd. will be closed. This traffic control will support emergency exit construction adjacent to the Wilshire/La Brea Station.  When  September 25, 2021 through April 4, 2022.  Work hours are anticipated to be 7am to 8pm, five to six days per week.  Where  Wilshire Blvd. between Detroit […]

Utility Installation on Hope St and on southbound Flower St

Summary Regional Connector Constructors (RCC) will implement a closure of southbound Hope St between 2nd St and 3rd St to allow for utility installation and street restoration. Anticipated work hours, weather permitting, are Monday through Friday from 6 am to 3:30pm and 7pm to 3am. RCC will also begin grade preparation and excavation to install […]

Intermittent Lane and Sidewalk Closures at S. Reeves Dr.

Summary The design-build contractor will implement an intermittent lane and sidewalk closure on S. Reeves Dr. at Wilshire Blvd. to accommodate the delivery of gravel, rebar, and concrete underneath the deck. During this work, the southbound lane and west sidewalk on S. Reeves Dr. will be closed. The closures will take place during daytime hours […]

Featured Featured

Metro Budget Development Comment Box

Help us shape our budget. Tell us your Metro priorities for Fiscal Year 2023.   Metro’s Fiscal Year 2022 budget focuses on restoring service to pre-pandemic levels. We’re making progress in creating more transportation options for everyone, but there is still more to do. We’re listening to you. Tell us what more you’d like to see from us.   Our intent to receive […]

Recurring

Utility Relocation on Wilshire Blvd and Gayley Ave

Summary  Metro contractors will continue to relocate and upgrade the sanitary sewer lines and a storm drain on Wilshire Blvd. and Gayley Ave. in preparation for the Purple (D Line) Extension Section 3 project.  The work consists of saw cutting, demolition, and trenching of the existing roadway to relocate a storm drain and sanitary sewer lines. Construction […]

Central Ave Civil Improvements

Summary Regional Connector Constructors (RCC) will begin installation of a concrete bus pad on eastbound (EB) 1st St, between Central Ave and San Pedro St. Prep work will take place

Storm Drain Surveys Near Malcolm Ave.

Storm Drain Surveys Near Malcolm Ave.  Summary  Metro contractors will survey the storm drain lines on Wilshire Blvd. between Selby Ave. and Glendon Ave. in preparation for the Purple (D Line) Extension Section 3 project. Surveys will require temporary lane reductions. Streets will be restored once surveys are complete. Utility service will be maintained.  Date: October 13 to 29  Work […]

Testing

Testing

Road C – Utility Work

Summary Workers will continue utility installation that benefits rail configuration in the Division 20 South Yard. This work will occur on Road C, near the rails and the One Santa Fe Building. Noteworthy There will be excavation, shoring and trenching for utility installation, and material and debris hauling. Please note intermittent noise may occur during […]