Utility Relocation on Wilshire Blvd and Gayley Ave

October 4 @ 10:00 pm - October 22 @ 6:00 am

|Recurring Event (See all)

An event every day that begins at 10:00 pm, repeating until October 4, 2021

An event every week that begins at 10:00 pm on Sunday and Saturday, repeating indefinitely

Summary 

Metro contractors will continue to relocate and upgrade the sanitary sewer lines and a storm drain on Wilshire Blvd. and Gayley Ave. in preparation for the Purple (D Line) Extension Section 3 project.  The work consists of saw cutting, demolition, and trenching of the existing roadway to relocate a storm drain and sanitary sewer lines. Construction activities have been done in stages and updates will be posted online each week.  The traffic controls have been updated due to Stage 1 pile installation work.  Utility service and building access will be maintained.  

Southern Intersection of Wilshire Blvd. and Midvale Ave- Stage 1 

Date: October 4 to October 22 

Work hours:   

  • Friday, 10pm to Saturday, 9am 
  • Saturday, 10pm – Sunday, 9am 
  • Sunday, 10 pm to Thursday, 6am- Daily 

Traffic Control:  

  • Lanes will be restricted on the northside of Wilshire Blvd. between Westwood Blvd. and Veteran Ave for piling Stage 1.  
  • One open lane to traffic on eastbound and westbound Wilshire Blvd when nearing the Gayley Ave intersection. 
  • Intermittent traffic restrictions on Gayley Ave. between Lindbrook Dr. and Ashton Ave. 
  • No northbound and southbound access of Gayley Ave. 
  • Left turn restrictions at the intersection of Gayley Ave and Wilshire Blvd. 

 

Northeast Intersection of Wilshire Blvd. and Gayley- Stage 2 

 Date: October 4 to October 22 

 Work hours:   

  • Monday through Friday, 9pm to 6am and  9am to 3:30pm 

Traffic Control:  

  • Lanes will be restricted on the northside of Wilshire Blvd. between Westwood Blvd. and Veteran Ave for piling Stage 1. 
  • Intermittent traffic restrictions on Gayley Ave. between Lindbrook Dr. and Ashton Ave. 
  • Northbound lane restrictions on Gayley Ave. between Ashton Ave and Linbrook Dr. 
  • Left turn restrictions at the intersection of Gayley Ave and Wilshire Blvd. 
  • Driveway access will be maintained. 

 

Noteworthy 

  • All work has received the necessary permits and approvals. 
  • Access to driveways, residences & businesses will be maintained at all times unless notified in advance. 
  • Access for pedestrians will be maintained outside of construction zones. 
  • Access for the Fire Department and emergency responders will be maintained. 
  • Parking restrictions will be implemented in the immediate area of the work zone. 
  • Construction is dynamic and schedules are subject to change. 
  • 24/7 Hotline: 213-922-6934

Metro Access 

Metro bus stops may be relocated or lines could be impacted. For information changes to Metro service, please call 323.GoMetro. Passengers are encouraged to use the Transit App to plan their travels. 