LA Metro

Fares
Regular Fare
$1.75
one-way on bus or rail
K-12 Student Fare
$1.00
one-way on bus or rail
Senior / Disabled Fare
$0.75 / $0.35
one-way on bus or rail
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

PLE2: Reinstatement of MOA Work Hours on Wilshire Blvd

November 9

|Recurring Event (See all)

An event every day that begins at 12:00 am, repeating until December 31, 2021

Summary
On June 14th, design-build contractor restored Wilshire Blvd. by removing the k-rail, re-opening S. Reeves Dr. north of the alley, and restoring the roadway, sidewalks, and crosswalks for public access. Intermittent traffic lane closures will continue to be implemented on Wilshire Blvd. during day and night hours to facilitate material deliveries and concrete placement for ongoing construction of the underground station.

The contractor will continue to reduce Wilshire Blvd. to one lane in each direction between the hours of 12am and 10:45am until June 20th. Beginning Monday, June 21st, the work hours stated in the Memorandum of Agreement (MOA) will be reinstated (see work hours listed below).

WHERE
Ongoing traffic lane closures between El Camino Dr. and Crescent Dr.

WHEN
Reinstatement of the MOA work hours will take effect beginning Monday, June 21st, 2021
9am to 4pm: 2 lanes open westbound and eastbound
8:15pm to 7am: 1 lane open westbound and eastbound
7am to 9am and 4pm to 8:15pm: No traffic control closures

ACCESS
Vehicle access will be maintained at all times on Wilshire Blvd.
Pedestrian access will be maintained.

Noteworthy
All work will receive necessary permits and approvals from City of Beverly Hills prior to the start of work.
Access for pedestrians will be maintained outside of the construction zone.
Access for emergency responders will be maintained.
Construction is a dynamic process and information is subject to change without notice.
For urgent construction related matters needing immediate attention please call the Metro 24/7 Hotline at 213.922.6934 or City of Beverly Hills Customer Service at 310.285.2467.

Metro Access
Metro bus stops may be relocated or lines could be impacted. For information changes to Metro service, please call 323.GoMetro. Passengers are encouraged to use the Transit App to plan their travels.

Details

Date:
November 9
Event Category: