Projects
Phase
Type
Location
Translate

Wilshire/Plymouth K-Rail Work Zone

Summary  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work […]

Wilshire/Rimpau K-Rail Work Zone Installation

Wilshire/Rimpau K-Rail Work Zone Installation Summary  Wilshire Blvd. between Rossmore Ave. and June St. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle […]

Recurring

G Line (Orange) Advanced Utility Relocation

Summary On behalf of Metro’s G Line (Orange) BRT Improvements Project, the Los Angeles Department of Water and Power (LADWP) and Charter Spectrum will relocate their respective utility lines as […]

Recurring

PLE1: Wilshire/La Cinega TBM Removal

Summary On July 6, the Purple Line Extension Design-Builder began removing the Tunnel Boring Machines from the La Cienega Station. Due to the size of each machine, the disassembly and removal will be done in sections. This work activity is anticipated to continue for approximately 3 months. The N Gale Dr. full closure at Wilshire Blvd. will remain in place for extended hours while the trucks […]

Piling on Wilshire Blvd between Gayley Ave and Veteran Ave

Summary Pile Installation and foundation work will continue the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers will be placed on […]

Recurring

Piling on Wilshire Blvd between Westwood Blvd and Gayley Ave

Summary  Piling will continue on the north side of Wilshire Blvd between Westwood Blvd and Gayley Ave. The “piles” support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete “k-rail” barriers […]

G Line (Orange) Pilot Gate Installation and Testing

Summary Metro’s contractor will install temporary pilot gates at the Hayvenhurst pedestrian intersection at the Metro G Line (Orange) busway to test and verify the reliable activation and proper operation […]

Intermittent Lane and Sidewalk Closures at S. Reeves Dr.

Summary The design-build contractor will implement an intermittent lane and sidewalk closure on S. Reeves Dr. at Wilshire Blvd. to accommodate the delivery of gravel, rebar, and concrete underneath the […]

Recurring

Construction Activity On or Near 1st St Bridge

Summary Workers will continue modifying the 1st Street Bridge at multiple locations through January 4, 2022. Construction will strengthen the bridge’s structure and allow expansion of rail tracks that run […]

Recurring

Center Street Sidewalk and North Yard Work

Summary Workers demolished the east sidewalk and fence along the Division 20 Rail Yard (north of the 1st Street Bridge) in June 2021. A permanent fence is being installed and […]