Pre-restoration Work and Backfill Material Delivery on Flower St

Summary Regional Connector Constructors (RCC) will continue pre-restoration work and material delivery planned for Flower St, between 3rd St and Wilshire Bl.   Work hours, weather permitting, are 6 am to 3:30 pm, Monday through Friday. Saturday from 6 am to 6 pm. This notice will continue to be updated with additional pre-restoration activities as necessary. […]

Grand Av Arts/Bunker Hill Station Concrete Placement

Summary Regional Connector Constructors (RCC) will place concrete slabs at the Grand Av Arts/Bunker Hill Station to build the station’s concourse level, walls, and sub-floors. This two-year process will advance and be scheduled intermittently with the installation of rebar, utilities, and waterproofing to support the new station. Work activities are anticipated to continue intermittently on […]

Recurring

PLE1: Wilshire/La Cinega TBM Removal

Summary On July 6, the Purple Line Extension Design-Builder began removing the Tunnel Boring Machines from the La Cienega Station. Due to the size of each machine, the disassembly and removal will be done in sections. This work activity is anticipated to continue for approximately 3 months. The N Gale Dr. full closure at Wilshire Blvd. will remain in place for extended hours while the trucks […]

Implementation of Work Zone in Wilshire and La Brea Intersection

Summary  On Saturday, August 7, from 6am to 9pm, lane reductions will be placed near the Wilshire Blvd. and La Brea Ave. intersection. This traffic control will support creation of a work zone on the northwest corner of Wilshire Blvd. and La Brea Ave. This work will continue through fall 2021. When  Saturday, August 7, from 6am to 9pm  Where  Wilshire Blvd. and La Brea […]

Appendage Construction – North La Brea Yard – Phase 1.1

Summary  Beginning Monday, August 9, and continuing for approximately seven months, work within the North La Brea Yard will transition to appendage construction for the La Brea Station.  When  Monday, August 9, for approximately 7 months.  Construction activity will occur between 7am and 10pm; clean up activities may take place between 10pm and 12am.  Where  Wilshire Blvd. and La Brea Ave.  Traffic Control  Wilshire Blvd. between Orange Dr. and […]

Recurring

PLE3: West LA VA Hospital Campus Worksite Activities

West LA VA Hospital Campus Worksite Activities  Summary  Metro contractors will continue worksite preparation for the future Westwood/VA Hospital Station. Work includes well monitoring, instrumentation, tree relocation, utility relocation (storm drain, gas line and sewer capping), flagpole removal and storage, hauling of spoil materials, construction wall installation and other improvement activities to create the staging […]

Piling in UCLA Lot 36

Summary  Metro contractors began pile installation in UCLA Lot 36 on Monday, August 23. The piles support the walls underground for the future Westwood/UCLA Station. Piling will continue in stages on Wilshire Blvd between Westwood Blvd and Veteran Ave. Construction notices will be updated online each week.  When   Date: August 23 to October 29 Work hours: 7am to 9pm for drilling activities, 9pm […]

Installation of new rail

Summary  Workers will install a new contact rail and rail ties, install new duct banks, and make other necessary upgrades to the yard, near the 6th Street Bridge. The purpose of this work is to electrify the existing non-powered tail track to allow for a faster train turnaround. The work will be completed in the Metro Division […]

CLAX: Left Turn Photo Enforcement: Crenshaw Bl between 59th St and 48st St

SUMMARY As part of the Crenshaw/LAX Transit Project, Metro has installed cameras at the at-grade train crossings along Crenshaw Bl between 59th and 48th St. and will activate its Photos Enforcement Program on Friday, October 1, 2021. The enforcement program is aimed at mitigating potential train versus vehicle collisions and improving vehicular and pedestrian safety […]

Wilshire/Plymouth K-Rail Work Zone

Summary  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work in the tunnel alignment underneath Wilshire Blvd.  Where  Wilshire Blvd. between Crenshaw Blvd. and Muirfield Rd. will be reduced to two lanes in each direction.  […]

Wilshire/Rimpau K-Rail Work Zone Installation

Wilshire/Rimpau K-Rail Work Zone Installation Summary  Wilshire Blvd. between Rossmore Ave. and June St. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work in the tunnel alignment underneath Wilshire Blvd.  Where  Wilshire Blvd. between Murifield Rd. and June St. is reduced to two lanes […]

Crack and Spall Repairs under the First Street Bridge

Summary Repair of 1st Street Bridge will continue in the Division 20 South Yard and then proceed to the bridge’s east side in Boyle Heights. Noteworthy Please note intermittent noise may occur during this work. Notification of future work requiring a closure of Myers St. in Boyle Heights will be sent.  Essentials The Division 20 […]