LA Metro

Fares
Regular Fare
$1.75
one-way on bus or rail
Senior / Disabled Fare
$0.75 / $0.35
one-way on bus or rail
K-12 Student Fare
$1.00
one-way on bus or rail
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

  • This event has passed.

ESFVLRT: Utility Exploration

June 7 @ 8:00 pm - June 8 @ 6:00 am

|Recurring Event (See all)

An event every week that begins at 8:00 pm on Monday, Tuesday, Wednesday, Thursday and Friday, repeating until June 27, 2021

An event every week that begins at 8:00 am on Saturday, repeating until June 28, 2021

Summary

Metro will perform small excavations to confirm the location of utilities and other underground structures that may be located under the East San Fernando Valley Light Rail Transit alignment. The work will continue until the end of Summer 2021.

This work will occur intermittently at various street intersections. Due to this activity:

  • Van Nuys Bl maybe reduced to one lane in each direction at certain intersections. The bike lane will be shared with the vehicular lane.
  • Left turn lanes will be prohibited at identified intersections northbound and southbound on Van Nuys Bl.
  • Curb land parking may be prohibited on Van Nuys Bl between the identified intersections.

Noteworthy

Utility exploratory excavations include potholing, trenching, saw cutting, jackhammering, and pavement restoration. Potholing and trenching will not have loud noise during the nighttime hours of operation on  Monday through Thursday.  Daytime Saw cutting and jackhammering sound will be monitored and will only take place on Friday and Saturday.

Essentials

WHAT: Utility Exploration

 WHEN: Monday – Friday, June 10 – 24, 2021, 8:00 p.m. – 6:00 a.m.

Saturday, June 19 – 26, 2021, 8 a.m. – 6:00 p.m.

WHERE: The schedule below reflects the work on the intersections along Van Nuys Bl.

Date Intersections / Van Nuys Bl
June 10 Sherman Way / Vose St / Wyandotte St
June 11 Sherman Way / Valerio St / Covello St
June 14 Rayen St / Covello St
June 15 Osborne St
June 16 Osborne St / Tupper St
June 17 Vincennes St / Tupper St
June 19 Pathenia St / Saticoy St
June 21 – June 24 Rayen St / Covello St
June 26 Parthenia St / Keswick St

What to Expect

  • Please look for posted signs at affected bus stops, as bus stops may be temporarily relocated due to this activity.
  • Work that is louder than ambient noise will be monitored, and will only take place during daytime hours.
  • Dates are subject to change.
  • All work has approved permits from local jurisdictions

 

 

 

 

 

 

Details

Start:
June 7 @ 8:00 pm
End:
June 8 @ 6:00 am
Event Category: