Fares
Regular Fare
$1.75
one-way on bus or rail
K-12 Student Fare
$1.00
one-way on bus or rail
Senior / Disabled Fare
$0.75 / $0.35
one-way on bus or rail
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

  • This event has passed.

Eastside Transit Corridor Phase 2 Meeting #3: Cities of Pico Rivera and Santa Fe Springs and Los Nietos Community

March 16, 2022 @ 6:00 pm - 7:30 pm

The reinitiated environmental process will include the development of a Recirculated Draft Environmental Impact Report (under CEQA) to update the 2014 Draft EIS/EIR. This process includes advanced conceptual engineering, environmental analysis and ongoing outreach efforts. We anticipate releasing a Recirculated Draft EIR for public review in 2022.

Join Metro for virtual meetings in March to provide an update on the project. All meetings will have a mobile tech van available at each site with virtual Spanish interpretation.

 

Zoom Meeting

Link: https://tinyurl.com/mrxd844d

Call-In Number: 213.338.8477

Meeting ID: 853 2408 0924

Spanish Call-In: 872.240.3212

Spanish Access Code: 510-930-613

 

Tech Van Location

Pico Rivera Senior Center

9200 Mines Av

Pico Rivera, CA 90660

Details

Date:
March 16, 2022
Time:
6:00 pm - 7:30 pm
Event Category:
Website:
https://www.metro.net/projects/eastside_phase2/