LA Metro

Fares
Regular Fare
$1.75
one-way on bus or rail
K-12 Student Fare
$1.00
one-way on bus or rail
Senior / Disabled Fare
$0.75 / $0.35
one-way on bus or rail
Projects
Phase
Type
Location
Translate
Loading Events

« All Events

  • This event has passed.

Central Ave Civil Improvements

October 7 @ 7:00 am - October 18 @ 3:30 pm

Summary

Regional Connector Constructors (RCC) will begin installation of a concrete bus pad on eastbound (EB) 1st St, between Central Ave and San Pedro St.

Prep work will take place on Thursday, October 07, 2021, from 9 am to 3:30 pm. Thru traffic will be maintained with a lane reduction in place during work hours.

Bus pad installation work is anticipated to begin Monday, October 11, 2021, through Friday, October 15, 2021.

Monday, October 11, 2021, and Tuesday, October 12, 2021, there will be an EB 1st St directional closure, from San Pedro St to Central Ave, from 7 am to 3:30 pm.

Essentials

Activities include traffic control mobilization, equipment mobilization, saw cutting, concrete removal, excavation, backfill, utility, and concrete placement, along with street restoration.

Temporary closure of crosswalks at 1st and Central will be in place during work hours. Pedestrians will be detoured outside the construction zone.

What to Expect

Local access will be maintained on 1st St.

Lane reductions will be in place starting on Monday, October 11, 2021, through Friday, October 15, 2021.

Access to businesses and driveways will be maintained during work hours. Local access to businesses within the work zone will be coordinated.

Detour for EB 1st St for Monday, October 11, 2021, and Tuesday, October 12, 2021:

  • Right on San Pedro St, left on 2nd St, left on Central Ave, back on 1st St

*Dates are subject to change.

Details

Start:
October 7 @ 7:00 am
End:
October 18 @ 3:30 pm
Event Category: