All Day

Little Tokyo/Arts District Station Closure

Summary Regional Connector Constructors will permanently close the Little Tokyo/Arts District Station to build the underground tunnel box for the L Line (Gold) along Alameda St, between 1st St and […]

Westbound 1st St Directional Closure

Regional Connector Constructors (RCC) will implement a directional closure of westbound (WB) 1st St between Vignes St and Alameda St. The 24/7 directional closure is anticipated to be in place until Spring 2022.  This directional closure will allow for the removal of L Line (Gold) tracks, tie-in to the new system, and street restoration. RCC […]

Westbound 1st St, between Vignes and Alameda St: Bikes prohibited

Due to continued construction activities for Metro’s Regional Connector Transit Project, westbound 1st St is closed at Vignes St to all bicyclists through the duration of construction. Detour A bike detour is in place on westbound 1st St to southbound Vignes St, to 2nd St, for westbound travel. For safety and to avoid citations, be […]

Westwood Blvd Utility and Pile Installation

Utility sewer line work on Westwood Blvd will continue on December 17. Pile installation on Westwood Blvd is anticipated to start on December 20.   The piles support the underground walls for the future Westwood/UCLA Station. The street will be restriped, and concrete k-rail barriers will be placed on Wilshire Blvd to protect the public outside […]

PLE1: Wilshire/La Cienega Station Construction Activities

City of Beverly Hills – Wilshire/La Cienega Monthly Look-Ahead: January 2022    This monthly notification is an outline of construction activities for the month of January 2022, pending City of Beverly Hills approval. Additional […]

PLE2: Wilshire/Rodeo: Monthly Lookahead

This monthly notification is an outline of construction activities for the month of January 2022. Additional notices detailing these activities will be sent by Metro’s project team. To be added to the Purple (D) […]

Wilshire/Rimpau K-Rail Work Zone Installation

Wilshire Blvd. between Rossmore Ave. and June St. will be reduced to two lanes in each direction. A K-Rail work zone is implemented in the middle of Wilshire Blvd. to support ongoing construction work in the tunnel alignment underneath Wilshire Blvd.

Ongoing
Recurring

Center Street Sidewalk and North Yard Work

Summary On Saturday, January 29, 2022, workers will remove the K-Rail concrete barriers on the east side of Center St. to allow for utility and street restoration. This weekend work […]

Recurring

G Line (Orange) Advanced Utility Relocation

Summary On behalf of Metro’s G Line (Orange) BRT Improvements Project, the Los Angeles Department of Water and Power (LADWP) and Charter Spectrum will relocate their respective utility lines as […]

CLAX: Live Train Testing

Summary As part of Metro’s Crenshaw/LAX Transit Project, Walsh-Shea Corridor Constructors (WSCC) will continue working on live train testing of train control and communication systems. Essentials WHAT: Live Train Testing WHEN:  Continuing November 1, 2021 through January 1, 2022 7am to 5pm, 5pm to 2am Monday through Sunday, excluding holidays. Weather permitting. WHERE: Intersection crossings affected during the testing schedule include: City of […]

Civil Improvements and Utility Installation Hope St, southbound Flower, and 3rd St/Flower

Regional Connector Constructors (RCC) will implement a closure of southbound Hope St between 2nd St and 3rd St to allow for utility installation and street restoration. Anticipated work hours, weather permitting, are Monday through Friday from 6 am to 3:30 pm and 7 pm to 3 am.  RCC will also begin grade preparation, tree removal, […]

Work at Stations

Summary  Regional Connector Constructors (RCC) will continue to perform construction activities that will continue through 2022 at the following locations:   Future Little Tokyo/Arts District Station  1st St Portal construction (between Hewitt St and Alameda St)  Mangrove yard (Temple St and Alameda St)  Future Historic Broadway Station  2nd/Hope Station Yard  Anticipated work hours, weather permitting, are from 4 am to 11 pm, Monday […]

Recurring

Flower St: Sidewalk Installation

Regional Connector Constructors (RCC) will continue material delivery planned for Flower St, between 3rd St and Wilshire Bl. RCC will continue replacing or installing sidewalks at Flower St and 3rd St, 4th St, 5th St, and 6th Streets.   RCC will also begin sidewalk restoration on Flower St between 4th St and 5th St. The east sidewalk on Flower St between 4th St and 5th […]

Utility Relocation and Lane Reduction: Broadway and Spring St

Summary Regional Connector Constructors (RCC) will excavate and install a new utility that will connect into the existing network on Spring St and Broadway, between 1st St and 3rd St.  Work is anticipated to continue during the week through Spring 2022 from 6 am to 3:30 pm and 7 pm to 6 am. Saturdays from 6 […]

Regional Connector Project Wide: Concrete Placement

Little Tokyo Concrete Placement  Regional Connector Constructors (RCC) continue placing concrete within the future Little Tokyo/Arts District Station, 1st St Portal (between Hewitt St and Alameda St), Mangrove Yard (Temple […]

Construction Activity On or Near 1st St Bridge

Summary Workers will continue modifying the 1st Street Bridge at multiple locations through April 30, 2022. Construction will strengthen the bridge’s structure and increase the number of rail tracks that […]