LA Metro

Fares
Regular Fare
$1.75
one-way on bus or rail
K-12 Student Fare
$1.00
one-way on bus or rail
Senior / Disabled Fare
$0.75 / $0.35
one-way on bus or rail
Projects
Phase
Type
Location
Translate
Recurring

PLE1: Southwest Fairfax Ave. and Wilshire Blvd. Appendage Work Zone

Summary Through April 15, 2022, Wilshire Blvd. between San Diego Way and Spaulding Ave. will be reduced to two lanes in each direction. Fairfax Ave. will see no traffic impacts; however, a K-Rail work zone will be implemented on the southwest corner of Wilshire and Fairfax (shown on the map below.) This traffic control supports appendage construction immediately adjacent to the Wilshire/Fairfax Station.  Essentials WHEN August 8, 24 hours per […]

Parking Shuttle Service for West LA VA Hospital Campus

Parking Shuttle Service is now available for hospital staff and guests of the West LA VA Hospital campus. The shuttle service, which is free to staff and guests, will operate while construction work is underway in several parking structures and lots on the hospital campus. When: Fall 2020 through Fall 2023 Hours:  Monday through Friday; 24 […]

Recurring

PLE2: Installation of Instrumentation Poles along Tunnel Alignment

Summary The design-build contractor is continuing with the installation of geotechnical instruments along the tunnel alignment from Century City to Wilshire Blvd. and La Cienega Blvd. in Beverly Hills. Ten-foot poles with geotechnical instruments will be temporarily installed on public sidewalks within this area in order to monitor ground movement, settlement, and other geological impacts during […]

Recurring

PLE3: West LA VA Hospital Campus Worksite Activities

West LA VA Hospital Campus Worksite Activities  Summary  Metro contractors will continue worksite preparation for the future Westwood/VA Hospital Station. Work includes well monitoring, instrumentation, tree relocation, utility relocation (storm drain, gas line and sewer capping), flagpole removal and storage, hauling of spoil materials, construction wall installation and other improvement activities to create the staging […]

Recurring

PLE1: Wilshire/La Cinega TBM Removal

Summary On July 6, the Purple Line Extension Design-Builder began removing the Tunnel Boring Machines from the La Cienega Station. Due to the size of each machine, the disassembly and removal will be done in sections. This work activity is anticipated to continue for approximately 3 months. The N Gale Dr. full closure at Wilshire Blvd. will remain in place for extended hours while the trucks […]

Construction Activities for Section 3 of the Purple (D) Line

Construction Activities for Section 3 of the Purple (D) Line Please see below for a summary of construction activities taking place along the project's alignment in Section 3, including the Westwood/UCLA Station and Westwood/VA Hospital Station. This information is updated weekly.  🔆denotes a new or updated notice Section 3 Recent Updates: Westwood/UCLA Station 🔆Geotech Instrumentation with Wilshire Ln. Closures and I-405 Ramp Closures […]

Recurring

PLE2: Reinstatement of MOA Work Hours on Wilshire Blvd

Summary On June 14th, design-build contractor restored Wilshire Blvd. by removing the k-rail, re-opening S. Reeves Dr. north of the alley, and restoring the roadway, sidewalks, and crosswalks for public access. Intermittent traffic lane closures will continue to be implemented on Wilshire Blvd. during day and night hours to facilitate material deliveries and concrete placement […]

Recurring

PLE1: La Cienega Station Appendage Construction

Station Appendage Construction on Wilshire Blvd. between San Vicente Blvd. and La Cienega Blvd. – Phase 1A Summary Beginning March 13, 2021, and continuing through October 2022, a work zone with K-Rail will be implemented on the north side of Wilshire Blvd. between San Vicente Blvd. and west of Gale Dr. This work zone will […]

Recurring

Traffic Signal Conduit Relocation at Westwood Blvd. and Wilshire Blvd.

Summary  Metro contractors are completing traffic signal conduit relocation work in the Westwood area. The work will occur at the four corners of the Westwood Blvd and Wilshire Blvd Intersection. Activities include pulling wire and terminations, saw cutting, demolition, and trenching of existing curbs and sidewalks to relocate and install traffic signal conduits. Driveway and parking access will be maintained. Traffic […]

Recurring

Ongoing work in Caltrans Basin

Metro contractors will work in the Caltrans basin near southbound I-405 in preparation for the Purple (D Line) Extension Section 3. The work includes tree removal, excavation, and drainage structure installation Monday through Friday, 7am to 4pm and 9pm to 6am.  Work Hours: Monday through Friday, 7am to 4pm and 9pm to 6am  Traffic Controls:    […]

PLE1: Wilshire/La Cienega Station Construction Activities

City of Beverly Hills – Wilshire/La Cienega Monthly Look-Ahead: December 2021     This monthly notification is an outline of construction activities for the month of December 2021, pending City of Beverly Hills approval. Additional notices detailing these activities will be sent by email through the Purple Line Extension, Section 1 database. To be added to the Purple (D) Line stakeholder […]

Recurring

PLE2: Century City/Constellation Station Monthly Lookahead

Century ­­City – Constellation Station Monthly Look-Ahead: December 2021   This monthly notification is an outline of construction activities in Century City for the month of December 2021. All work has received necessary permits and approvals or is pending approval. Dates are subject to change. Additional notices detailing these activities are sent by email through […]