PLE 1: Subsurface Investigation – Wilshire/Stanley

On Saturday, December 18 and Sunday, December 19, from 7:30am to 9pm, the design builder will be implementing intermittent lane reductions on Wilshire Blvd. between La Cienega Blvd. and Carson Rd. This traffic control will support subsurface investigation work along the tunnel alignment. This will determine if additional jet grouting and soil improvement activities will be required within the tunnel tracks. The jet grouting and soil improvement work will […]

Recurring

2nd/Hope Station Yard Activities

Summary: Regional Connector Constructors (RCC) will continue to perform construction activities at the 2nd/Hope Station Yard. Work is anticipated to continue through 2021. Work hours, weather permitting, are 6am to 9pm, Monday through Friday, and 5am to 6pm on Saturdays and Sundays as needed.  Essentials: Activities include: installing HDPE waterproofing, rebar installation, plumbing work, electrical conduit […]

Recurring

Civil Work Improvements: Crenshaw Bl between Exposition Bl and 71st St

SUMMARY   As part of the Crenshaw/LAX Transit Project, Metro’s contractor, Walsh-Shea Corridor Constructors (WSCC) will continue working on civil improvements on Crenshaw Blvd. The civil work includes curb and gutter reconstruction, ADA ramps, landscaping, street lighting, traffic signals, sidewalk reconstruction, driveways and median improvements. The work will continue to be conducted in segments and phases.  The current phase […]

Wilshire/Bonsall Restoration and Ramp Closure

Metro contractors will restore and restripe the eastbound Wilshire Blvd off ramp to Bonsall Ave on Wednesday, January 5 from 9pm to 5am.   Date: Wednesday, January 5  Work hours: 10pm to 5am  Traffic Control:  Eastbound Wilshire Blvd off ramp to Bonsall Ave will be closed.  Bonsall Ave access for northbound and southbound traffic will be maintained.    Noteworthy:  […]

Northbound Alameda Utility Relocation

Regional Connector Constructors (RCC) will be performing storm drain work on northbound (NB) Alameda St, between 1st St and Temple St, weather permitting. Work is anticipated to begin Saturday, January 8, 2022, and Saturday, January 15, 2021, from 8:00 a.m. thru 3:30 pm. This activity does not anticipate any service interruption. Additional work may be […]

Roadway Paving

Summary Construction crews will be deployed to implement a traffic closure on 2nd Street between Hill and Broadway. Local access to 2nd St will be maintained from Hill St. Thru traffic will be maintained on on NB Broadway between 1st and 3rd St during asphalt restoration activities. Anticipated work hours will be between 5:00am through […]

Recurring

Myers St. Closure for 1st Street Bridge Improvements

Summary Workers will continue modifying the 1st Street Bridge at Myers St. The work will require a one-day full closure of Myers St. underneath the 1st Street Bridge in Boyle Heights. The work will remove the K-Rail barriers on Myers St. Work requires the use of pickup trucks, air compressors, forklifts, concrete trucks, and other […]

PLE1: Wilshire/La Brea Station Construction Area – Directional Closure

On Saturday, January 8 from 7am to 7pm, eastbound Wilshire Blvd. will be closed at La Brea Ave. This closure supports concrete and material deliveries to the La Brea Station through the station roof. When Saturday, January8 from 7am to 7pm Where: Wilshire Blvd. and La Brea Ave.  Traffic Control Eastbound Wilshire Blvd. will be fully […]

Recurring

G Line (Orange) Advanced Utility Relocation

Summary On behalf of Metro’s G Line (Orange) BRT Improvements Project, the Los Angeles Department of Water and Power (LADWP) and Charter Spectrum will relocate their respective utility lines as part of Advanced Utility Relocation (AUR) work activities.  The work will be performed in multiple phases along Vesper Av and will include lane and full […]

Recurring

PLE1: La Cienega Station Appendage Construction

Station Appendage Construction on Wilshire Blvd. between San Vicente Blvd. and La Cienega Blvd. – Phase 1A Summary Beginning March 13, 2021, and continuing through October 2022, a work zone with K-Rail will be implemented on the north side of Wilshire Blvd. between San Vicente Blvd. and west of Gale Dr. This work zone will […]

Recurring

Flower St Construction Activities

Summary Regional Connector Constructors (RCC) will continue work below the deck on Flower St. Additional activities include backfill material delivery. Expect intermittent lane restrictions on the east side of Flower St, between 4th St and Wilshire Bl, for equipment mobilization and backfill material delivery. Anticipated work hours, weather permitting, are 6am to 3:30pm Monday through […]

Recurring

PLE3: West LA VA Hospital Campus Worksite Activities

West LA VA Hospital Campus Worksite Activities  Metro contractors will continue worksite preparation for the future Westwood/VA Hospital Station. Work includes well monitoring, instrumentation, tree relocation, utility relocation (storm drain, gas line and sewer capping), flagpole removal and storage, hauling of spoil materials, construction wall installation and other improvement activities to create the staging area […]